Sign Permit in Casper, Wyoming

Required for most commercial signage in Casper, submitted to the Building Inspection Division as a combined 'building and sign permit application.' Freestanding and monument sign structures additionally require a stamped engineered drawing for wind/snow load. Full sign regulations (size, square footage, location, and permitting by zoning district) are set out in Casper Municipal Code Chapter 17.96.

Verified 2026-07-22 · Source

When you need this permit

  • A sign permit is required for any commercial sign, with the exception of private on-site traffic directional signs under 4 sq ft per face and 10 ft in height without commercial messaging
  • Free-standing or monument sign structures require a stamped engineered drawing showing wind load and snow load calculations, plus a completed building and sign permit application
  • Real estate and political signs do not require a permit but must follow the size and placement restrictions in Chapter 17.96
  • Garage sale signs are permitted without a permit if removed within 72 hours
  • Temporary signs are only allowed in commercial/industrial zones and must comply with structural guidelines
  • Full requirements are set out in Casper Municipal Code Chapter 17.96; contact Code Enforcement/Community Development at (307) 235-8254 for zoning-district-specific allowances

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Initial Building Permit FeeCity of Casper Permit Fee Schedule (eff. February 2, 2026)
$35
Combined Building Permit Fee — valuation-basedCity of Casper Permit Fee Schedule (eff. February 2, 2026) — the City publishes no dedicated sign-permit fee line; the Code Enforcement Signage page's instruction to file a combined 'building and sign permit application' indicates signage is billed off this same general valuation-based schedule used for every other building permit type in this file
Graduated table from $70 (valuation $1–$1,000) up to $841 (valuation $99,001–$100,000); over $100,000 = $806 + $5.60 per additional $1,000 or fraction thereof

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Casper?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies the installed sign matches the approved permit (location, size, and — for freestanding/monument signs — structural attachment)

See the full Casper inspection guide — scheduling & re-inspection fees →

Tips

  • Freestanding and monument signs need a stamped engineered drawing for wind/snow load — budget extra design lead time versus a simple wall sign.
  • Real estate, political, and 72-hour garage sale signs are exempt from a permit but must still follow the Chapter 17.96 size/placement rules.
  • Casper publishes no dedicated sign-permit fee line; based on the Signage page's own instruction to file a combined 'building and sign permit application,' expect it billed off the same combined valuation-based fee table (starting at the $35 Initial Building Permit Fee) used for every other Casper permit type in this file — confirm the exact cost with Community Development at (307) 235-8254 before applying.

Frequently asked questions

Yes, for most commercial signs, per Casper Municipal Code Chapter 17.96. Exemptions exist for small private on-site traffic-directional signs, real estate signs, political signs, and garage-sale signs removed within 72 hours. Freestanding or monument signs additionally need a stamped engineered drawing for wind and snow loads.

The City does not publish a separate sign-permit fee line. Based on the Code Enforcement Signage page's instruction to file a combined 'building and sign permit application,' it is priced off the same combined valuation-based Building Permit Fee schedule (starting at a $35 initial fee) used for every other Casper building permit — confirm the exact cost with Community Development at (307) 235-8254 before applying.

Casper does not publish a plan-review timeline for this permit. Contact City of Casper Community Development Department — Building Inspection Division at (307) 235-8254 for current turnaround.

You'll need: Building and Sign Permit Application. Depending on your project, Casper may also ask for: Engineered Drawing (Freestanding/Monument Signs). See the required-documents checklist on this page for details on each.

Casper requires 1 inspection(s) for a sign permit, in order: Final. Schedule each through City of Casper Community Development Department — Building Inspection Division ((307) 235-8254).

Apply through City of Casper Community Development Department — Building Inspection Division at 200 N David St, Casper, WY 82601. Phone: (307) 235-8254, email: building@casperwy.gov. Office hours: Mon–Fri 8:00 AM–5:00 PM (in-person/phone code consultation available 8:00–9:00 AM and 4:00–5:00 PM). Official information: https://www.casperwy.gov/services/building_and_inspections/index.php.

Casper, Wyoming has adopted: 2024 International Building Code (IBC); 2024 International Residential Code (IRC); 2024 International Fire Code (IFC); 2024 International Existing Building Code (IEBC); 2024 International Energy Conservation Code (IECC) — applies to the building thermal envelope ONLY per City of Casper adoption note; 2024 International Plumbing Code (IPC); 2024 International Fuel Gas Code (IFGC); 2024 International Mechanical Code (IMC); 2023 NFPA 70 National Electrical Code (NEC); ICC A117.1-2009 Accessible and Usable Buildings and Facilities. Local amendments apply — see the Casper overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.