Residential Addition / Remodel Permit in Casper, Wyoming
VerifiedRequired for additions, remodels, and alterations to existing one- and two-family dwellings in Casper, including decks, patio covers, detached garages, and basement finishes when they involve framing, electrical, plumbing, or mechanical work. Governed by the 2024 IRC.
Verified 2026-07-01 · Source
When you need this permit
- All exterior work such as decks, additions, or accessory structures requires a plot plan and construction drawings
- Construction drawings typically include foundation design, room sizes, window locations and sizes
- Fee based on the value (materials and labor) of the work per the combined valuation fee schedule
- Permit valid for 180 days from issuance
- Building Guides available from Community Development for: one-story additions, basement finish, patio covers/carports, detached garages, decks, ramps, pole barns, monolithic slabs
Required documents
- Req
Building Permit Application
Submitted via CSS Portal or in person; select addition/remodel scope
- Req
Residential Building Permit Checklist
City of Casper's submittal checklist
- Req
Plot Plan
Site plan showing lot lines, setbacks, existing structures, and proposed addition footprint
- Req
Construction Drawings
Plans showing framing, dimensions, and connection to existing structure; MEP details as applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Initial Building Permit Fee | $35 | City of Casper Permit Fee Schedule (eff. February 2, 2026) |
| Combined Building/Electrical/Plumbing/Mechanical Permit Fee — valuation-based | Graduated table from $70 (valuation $1–$1,000) up to $841 (valuation $99,001–$100,000); over $100,000 = $806 + $5.60 per additional $1,000 or fraction thereof | City of Casper Permit Fee Schedule (eff. February 2, 2026) — same combined table used for new construction; valuation is based on the cost of the addition/remodel work |
| After-the-fact permit surcharge | Double the building permit fee | — |
Review timeline
~5–20 business days
Typical estimate — confirm current times with the Casper building department
Inspection process
- 1
Footer/Foundation (if new footings)
Before concrete pour, for additions requiring new foundation elements
- 2
Framing
After framing complete and MEP rough-ins installed and inspected
- 3
Insulation
Proper R-values and placement before drywall
- 4
Drywall
Thickness/type and screw placement
- 5
Final
All work complete per approved plans
Tips
- Decks, patio covers, detached garages, and basement finishes are all processed as valuation-based permits under Casper's combined fee table — there is no separate flat-rate schedule for these scope types as there is in some other cities.
- Ask Community Development for the relevant Building Guide (decks, basement finish, patio covers/carports, detached garages) before submitting plans — these guides summarize the code and design requirements for the most common owner projects.
- A conditional use permit from the Planning and Zoning Commission is required for detached garages/accessory buildings exceeding 12 ft in exterior wall height.
Frequently asked questions
- Do I need a permit to build a deck in Casper?
- Yes, decks require a building permit in Casper unless the deck qualifies as flatwork (landing/walkway not more than 30 inches above grade and not over a basement). Fees are valuation-based per the City's combined fee schedule. A Building Guide for residential decks is available from Community Development.
- Is a permit required to finish a basement in Casper?
- Yes, a basement finish involving framing, electrical, plumbing, or mechanical work requires a building permit, reviewed under the 2024 IRC. A Building Guide for basement finishes is available from Community Development at (307) 235-8254.
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- City of Casper Community Development Department — Building Inspection Division — official building department
- City of Casper — Permit Information
- City of Casper Permit Fee Schedule (eff. February 2, 2026)
- City of Casper — Building and Fire Code Resources (Building Guides list)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Casper
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.