Residential Building Permit (New Construction) in Casper, Wyoming

Verified

Required for new single-family dwellings and other new one- and two-family residential construction in Casper. Governed by the 2024 IRC. Reviewed for compliance with structural, energy (thermal envelope), and life-safety provisions before permit issuance.

Verified 2026-07-01 · Source

$35Initial Building Permit Fee

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Initial Building Permit Fee$35City of Casper Permit Fee Schedule (eff. February 2, 2026)
Combined Building/Electrical/Plumbing/Mechanical Permit Fee — valuation $1 to $100,000Graduated table from $70 (valuation $1–$1,000) up to $841 (valuation $99,001–$100,000); see full valuation table in source PDFCity of Casper Permit Fee Schedule (eff. February 2, 2026) — 'Combined Building, Electrical, Plumbing and Mechanical Permit Fee Schedule'; this includes the Initial Permit Fee
Combined Permit Fee — valuation over $100,000$806 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereofCity of Casper Permit Fee Schedule (eff. February 2, 2026)
Plan Check Fee — new 1- and 2-family residential$280 flatCity of Casper Permit Fee Schedule (eff. February 2, 2026)
Plan Check Fee — multi-family/commercial/industrial exceeding $25,000 valuation65% of the building permit feeCity of Casper Permit Fee Schedule (eff. February 2, 2026)
Sewer Permit$35
Water Permit$35
After-the-fact permit surchargeDouble the building permit feeAssessed when construction is initiated before plan review/approval of a complete application

Review timeline

~1030 business days

Typical estimate — confirm current times with the Casper building department

Inspection process

  1. 1

    Footer / Caisson / Monolithic Slab

    Hole depth and rebar/form placement before concrete pour

  2. 2

    Foundation Wall

    Rebar and form placement for foundation walls

  3. 3

    Framing

    Performed after structure is framed and all electrical, plumbing, and mechanical rough-ins are installed and inspected

  4. 4

    Insulation

    Proper R-values and placement, performed after framing

  5. 5

    Drywall

    Proper thickness/type of drywall and screw placement

  6. 6

    Final / Certificate of Occupancy

    All work 100% complete; required before occupancy of the structure

Tips

Frequently asked questions

What code edition does Casper use for residential construction?
Casper has adopted the 2024 International Residential Code (IRC), along with the 2024 IECC (thermal envelope only) and 2023 NFPA 70 NEC. Local amendments are codified in Title 15 of the Casper Municipal Code.
How is the building permit fee calculated in Casper?
Casper uses a single combined valuation-based fee table covering building, electrical, plumbing, and mechanical work. For valuations up to $100,000, fees are read directly off the table (e.g., $70 for $1–$1,000 valuation, scaling up to $841 at $100,000). Above $100,000, the fee is $806 plus $5.60 per additional $1,000 or fraction thereof.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Casper

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.