EV Charger / EVSE Permit in Casper, Wyoming

Casper has no standalone EV-charger/EVSE permit type or fee line item. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit or panel upgrade) is electrical work, and per this file's own electrical-permit entry, Casper's Building Inspection Division holds delegated local electrical authority and performs its own electrical plan review and inspections under the 2023 NFPA 70 NEC -- not the Wyoming State Fire Marshal's statewide electrical program. An EV charger installation is billed under the same 'Combined Building, Electrical, Plumbing and Mechanical Permit Fee Schedule' (City of Casper Permit Fee Schedule, eff. February 2, 2026) used for all electrical work, since no EV-charger-specific line item exists in the City's fee schedule as of this review.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit Application submitted to the Building Inspection Division (via CSS Portal or in person) for the EV charger circuit
  • Governed by the 2023 NFPA 70 National Electrical Code, same as all electrical work in Casper
  • Fee based on the value of the work per the City's combined valuation-based fee schedule, same as any other electrical permit -- no distinct EV-charger tier
  • Casper's Building Inspection Division performs its own electrical plan review and inspections (Rough Electrical, Service, Final Electrical) rather than routing to a state electrical authority

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Initial Building Permit FeeCity of Casper Permit Fee Schedule (eff. February 2, 2026) -- Casper does not publish a separate EV-charger or electrical-only fee table; billed off the combined valuation table, same as this file's electrical-permit entry
$35
Combined Building/Electrical/Plumbing/Mechanical Permit Fee — valuation-basedCity of Casper Permit Fee Schedule (eff. February 2, 2026) -- labeled 'Combined Building, Electrical, Plumbing and Mechanical Permit Fee Schedule'; a typical Level 2 EV charger circuit installation would fall in the lower end of this valuation table
Graduated table from $70 (valuation $1-$1,000) up to $841 (valuation $99,001-$100,000); over $100,000 = $806 + $5.60 per additional $1,000 or fraction thereof

Review timeline

Plan reviewTypical estimate — confirm current times with the Casper building department
~1–10 business days

How long did your EV Charger / EVSE Permit permit actually take in Casper?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Performed after electrical components are roughed in, before trim out, if applicable to the installation

  2. 2

    Final Electrical

    Performed when the charger installation is 100% complete and all connections/protections are verified per the 2023 NFPA 70 NEC

See the full Casper inspection guide — scheduling & re-inspection fees →

Tips

  • Casper issues its own electrical permits and runs its own electrical inspections -- unlike some peer states in this corpus where electrical work routes to a state board, an EV charger circuit here goes through the City's Building Inspection Division directly.
  • There is no separate EV-charger fee category in Casper -- an EV charger circuit is billed under the same combined valuation-based Building/Electrical/Plumbing/Mechanical fee schedule used for any electrical permit.

Frequently asked questions

Casper requires an ev charger / evse permit for: Electrical Permit Application submitted to the Building Inspection Division (via CSS Portal or in person) for the EV charger circuit; Governed by the 2023 NFPA 70 National Electrical Code, same as all electrical work in Casper; Fee based on the value of the work per the City's combined valuation-based fee schedule, same as any other electrical permit -- no distinct EV-charger tier; Casper's Building Inspection Division performs its own electrical plan review and inspections (Rough Electrical, Service, Final Electrical) rather than routing to a state electrical authority. If your project isn't listed, confirm with City of Casper Community Development Department — Building Inspection Division at (307) 235-8254 before starting work.

No. Casper has no standalone EV-charger/EVSE permit type. An EV charger circuit is permitted as standard electrical work through the City's Building Inspection Division, billed under the same combined valuation-based fee schedule used for all electrical, building, plumbing, and mechanical permits.

Plan review for an ev charger / evse permit in Casper typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with City of Casper Community Development Department — Building Inspection Division at (307) 235-8254.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Casper requires 2 inspection(s) for an ev charger / evse permit, in order: Rough Electrical, Final Electrical. Schedule each through City of Casper Community Development Department — Building Inspection Division ((307) 235-8254).

Apply through City of Casper Community Development Department — Building Inspection Division at 200 N David St, Casper, WY 82601. Phone: (307) 235-8254, email: building@casperwy.gov. Office hours: Mon–Fri 8:00 AM–5:00 PM (in-person/phone code consultation available 8:00–9:00 AM and 4:00–5:00 PM). Official information: https://www.casperwy.gov/services/building_and_inspections/index.php.

Casper, Wyoming has adopted: 2024 International Building Code (IBC); 2024 International Residential Code (IRC); 2024 International Fire Code (IFC); 2024 International Existing Building Code (IEBC); 2024 International Energy Conservation Code (IECC) — applies to the building thermal envelope ONLY per City of Casper adoption note; 2024 International Plumbing Code (IPC); 2024 International Fuel Gas Code (IFGC); 2024 International Mechanical Code (IMC); 2023 NFPA 70 National Electrical Code (NEC); ICC A117.1-2009 Accessible and Usable Buildings and Facilities. Local amendments apply — see the Casper overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.