Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Gillette. As with all electrical work in this jurisdiction, the City of Gillette — not the Wyoming State Fire Marshal's electrical program — issues and inspects the permit inside city limits (WSFM 'LOCAL AND STATE JURISDICTIONS' chart lists Gillette's ELEC INSP/PR as L/L), under the NEC adopted by City Code § 5-I-6. City Code § 5-IV-2 has no distinct EV-charger/EVSE fee line item — a standalone EVSE circuit is billed under the same amperage-based Electrical Permit fee table used for other electrical work, plus the Capital Contribution Fee if the installation involves a new or upgraded electrical service.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the new circuit, sub-panel, or service work needed to install EVSE equipment
  • Minimum electrical permit fee is $10.00, computed by amperage capacity, per City Code § 5-IV-2
  • Maximum fee for single-family residences (including EMHs, townhouses, patio houses) on a privately-owned lot is capped at $40 (0-100 amp) or $50 (101-200 amp)
  • Capital Contribution Fee applies in addition to the permit fee if the EVSE installation requires a new or upgraded electrical service
  • Contractor must hold a City of Gillette Class D Electrical contractor license (or Master/Journeyman Electrician license) per City Code Chapter 5, Article III Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit — 0 to 60-amp capacityCity Code § 5-IV-2(2)(a) (Revised 6-16-2026). No EV-charger-specific line item is published; a standalone EVSE circuit is billed under this general amperage-based schedule, the same treatment documented on this jurisdiction's electrical-permit entry.
$10.00
Electrical Permit — 61 to 100-amp capacity
$12.00
Electrical Permit — 101 to 200-amp capacity
$13.00
Electrical Permit — each sub-panel
$5.00
Residential Electrical (single-family, privately-owned lot) — 0 to 100-amp capacity (maximum fee)City Code § 5-IV-2(3)(a)(1)
$40.00
Capital Contribution Fee — 100 Amp (or upgrade 100 to 200 amp)City of Gillette Guideline to 2024 IRC Residential Construction — applies in addition to the electrical permit fee only if the EVSE installation requires a new or upgraded electrical service.
$175.00
Capital Contribution Fee — 200 Amp
$350.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Gillette building department
~0–5 business days

How long did your EV Charger / EVSE Permit permit actually take in Gillette?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electric

    EVSE circuit wiring and boxes installed, before walls closed

  2. 2

    Final

    EVSE unit installed, circuit energized and verified

See the full Gillette inspection guide — scheduling & re-inspection fees →

Tips

  • Gillette is one of the Wyoming cities that runs its own electrical inspection program — per the WSFM jurisdictions chart, Gillette's ELEC INSP/PR = L/L, so you apply to and pay the City, not the Wyoming State Fire Marshal's electrical program, for an EV charger circuit just as for any other electrical work.
  • Don't forget the Capital Contribution Fee ($175-$1,050 depending on amperage) if your EVSE installation requires a new or upgraded electrical service — it's charged IN ADDITION TO the amperage-based electrical permit fee.
  • No EV-specific fee line item exists — a standalone EVSE circuit not requiring a service upgrade is typically billed at the amperage-based minimum, as low as $10.

Frequently asked questions

Gillette requires an ev charger / evse permit for: Electrical permit required for the new circuit, sub-panel, or service work needed to install EVSE equipment; Minimum electrical permit fee is $10.00, computed by amperage capacity, per City Code § 5-IV-2; Maximum fee for single-family residences (including EMHs, townhouses, patio houses) on a privately-owned lot is capped at $40 (0-100 amp) or $50 (101-200 amp); Capital Contribution Fee applies in addition to the permit fee if the EVSE installation requires a new or upgraded electrical service; Contractor must hold a City of Gillette Class D Electrical contractor license (or Master/Journeyman Electrician license) per City Code Chapter 5, Article III. If your project isn't listed, confirm with City of Gillette Development Services — Building Division at (307) 686-5260 before starting work.

No. City Code § 5-IV-2 does not list a distinct EV charger/EVSE fee line item. An EVSE circuit is billed under the City's general amperage-based Electrical Permit fee table ($10-$50 depending on capacity), plus a separate Capital Contribution Fee ($175-$1,050) if the installation requires a new or upgraded electrical service.

Plan review for an ev charger / evse permit in Gillette typically runs 0–5 business days. This is an estimate, not a published figure — confirm current review times with City of Gillette Development Services — Building Division at (307) 686-5260.

You'll need: Electrical Permit Application (via EnerGov Self Service). See the required-documents checklist on this page for details on each.

Gillette requires 2 inspection(s) for an ev charger / evse permit, in order: Rough Electric, Final. Schedule each through City of Gillette Development Services — Building Division ((307) 686-5260).

Apply through City of Gillette Development Services — Building Division at City Hall, 201 E. 5th St., 2nd Floor, Gillette, WY 82716. Phone: (307) 686-5260, email: Not published on city site — use "Send an E-mail" contact form on the Building Division page or main line gillette@gillettewy.gov. Office hours: Mon–Fri (contact department for current hours); permits/plans/licenses/inspections managed via EnerGov Self Service online portal (registration required). Official information: https://www.gillettewy.gov/Departments/Development-Services/Building-Division.

Gillette, Wyoming has adopted: International Building Code (IBC), 2021 Edition — including Appendix C, adopted by City of Gillette Code Chapter 5, Article I § 5-I-2 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-2.A text now reads "2021 Edition, including Appendix C" and no longer cites Ord. 4052 (12-17-2024), which had adopted the 2024 IBC edition with Appendices C and H per the source PDF as of the prior 2026-07-01 verification; the 2024-edition adoption no longer appears in the current ordinance text.; International Residential Code (IRC), 2021 Edition — including Appendices AA, AB, AC, AE, AN, AQ, and AW (AW 3D Printed Construction), adopted § 5-I-3 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-3.A text now reads "2021 Edition" with this different appendix set (previously 2024 Edition, Appendices CA, CB, BA, CE, BB, BM per Ord. 4052, 12-17-2024, which no longer appears in the current ordinance text).; International Plumbing Code (IPC), 2021 Edition — including Appendices B, D, E, adopted § 5-I-4 (Revised 6-16-2026) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code. CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices B, D, E unchanged.; International Mechanical Code (IMC), 2021 Edition — adopted § 5-I-5 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited).; National Electrical Code — City Code § 5-I-6 (Revised 6-16-2026) (including Article 80/Annex H). CHANGED 2026-07-16 audit: the live § 5-I-6.A paragraph now contains two different edition references in the same sentence — "...adopted by reference the National Electrical Code, 2023 Edition..." and later "...of the National Electrical Code, 2026 Edition, including Article 80, are hereby referred to, adopted..." — with the amendment history newly listing Ord. 4081 (6-16-2026) as the latest ordinance for this section. The ordinance's own text does not reconcile the two edition years; previously cited cleanly as 2023 Edition only.; International Fuel Gas Code (IFGC), 2021 Edition — including Appendices A, B, C, D, adopted § 5-I-7 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices A, B, C, D unchanged.; International Fire Code (IFC), 2021 Edition — including Appendices B, C, D, E, F, and G, adopted § 5-I-8 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 and Appendices H and I are absent (previously 2024 Edition with Appendices B–I per Ord. 4052, 12-17-2024, no longer cited).; International Existing Building Code (IEBC), 2021 Edition — adopted § 5-I-9 (Revised 6-16-2026). CHANGED 2026-07-16 audit: § 5-I-9.A reads "2021 Edition" (previously cited as 2024 Edition; the current text carries no ordinance citation for the edition line).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted § 5-I-10 (Revised 6-16-2026); edition unchanged, only the chapter revision date-stamp updated at the 2026-07-16 audit.. Local amendments apply — see the Gillette overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.