EV Charger / EVSE Permit in Gillette, Wyoming
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Gillette. As with all electrical work in this jurisdiction, the City of Gillette — not the Wyoming State Fire Marshal's electrical program — issues and inspects the permit inside city limits (WSFM 'LOCAL AND STATE JURISDICTIONS' chart lists Gillette's ELEC INSP/PR as L/L), under the NEC adopted by City Code § 5-I-6. City Code § 5-IV-2 has no distinct EV-charger/EVSE fee line item — a standalone EVSE circuit is billed under the same amperage-based Electrical Permit fee table used for other electrical work, plus the Capital Contribution Fee if the installation involves a new or upgraded electrical service.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the new circuit, sub-panel, or service work needed to install EVSE equipment
- Minimum electrical permit fee is $10.00, computed by amperage capacity, per City Code § 5-IV-2
- Maximum fee for single-family residences (including EMHs, townhouses, patio houses) on a privately-owned lot is capped at $40 (0-100 amp) or $50 (101-200 amp)
- Capital Contribution Fee applies in addition to the permit fee if the EVSE installation requires a new or upgraded electrical service
- Contractor must hold a City of Gillette Class D Electrical contractor license (or Master/Journeyman Electrician license) per City Code Chapter 5, Article III Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electric
EVSE circuit wiring and boxes installed, before walls closed
- 2
Final
EVSE unit installed, circuit energized and verified
See the full Gillette inspection guide — scheduling & re-inspection fees →
Tips
- Gillette is one of the Wyoming cities that runs its own electrical inspection program — per the WSFM jurisdictions chart, Gillette's ELEC INSP/PR = L/L, so you apply to and pay the City, not the Wyoming State Fire Marshal's electrical program, for an EV charger circuit just as for any other electrical work.
- Don't forget the Capital Contribution Fee ($175-$1,050 depending on amperage) if your EVSE installation requires a new or upgraded electrical service — it's charged IN ADDITION TO the amperage-based electrical permit fee.
- No EV-specific fee line item exists — a standalone EVSE circuit not requiring a service upgrade is typically billed at the amperage-based minimum, as low as $10.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gillette
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Gillette project checklist
Describe your project once and get every permit, document, and fee it triggers in Gillette — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →