Demolition Permit in Gillette, Wyoming

Required for demolition of buildings or structures in Gillette. Fee is a low flat rate per City Code § 5-IV-1(b); a separate flat fee applies to disconnect the electrical service and to cap off plumbing at the street.

Verified 2026-07-16 · Source

When you need this permit

  • Building demolition permit required to demolish, move, or substantially alter a structure
  • Electrical service line must be disconnected as part of demolition (separate permit/fee)
  • Plumbing must be capped off at the street as part of demolition (separate permit/fee)
  • Contractor must hold applicable City of Gillette contractor license Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Demolition PermitCity Code § 5-IV-1(b) (Revised 6-16-2026)
$60.00
Demolition of Building — disconnect power service lineCity Code § 5-IV-2(5)
$10.00
Demolition of Building — cap off plumbing at streetCity Code § 5-IV-3(a)
$10.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Gillette building department
~0–5 business days

How long did your Demolition Permit permit actually take in Gillette?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Demolition Utility Disconnects

    Verification that electrical service line is disconnected and plumbing is capped off at the street before demolition

  2. 2

    Final

    Site cleared, lot restored per code requirements

See the full Gillette inspection guide — scheduling & re-inspection fees →

Tips

  • At $60 flat plus the $10 electrical disconnect and $10 plumbing cap-off fees, Gillette's total demolition permitting cost (roughly $80) is markedly lower than the valuation/bond-based demolition permits used in some other cities.
  • Coordinate separately with the City's Utilities division for gas/water/sewer disconnects ahead of demolition.

Frequently asked questions

Gillette requires a demolition permit for: Building demolition permit required to demolish, move, or substantially alter a structure; Electrical service line must be disconnected as part of demolition (separate permit/fee); Plumbing must be capped off at the street as part of demolition (separate permit/fee); Contractor must hold applicable City of Gillette contractor license. If your project isn't listed, confirm with City of Gillette Development Services — Building Division at (307) 686-5260 before starting work.

The building demolition permit itself is a flat $60.00. Disconnecting the electrical service line is an additional $10.00, and capping off plumbing at the street is another $10.00 — per City Code § 5-IV-1(b), § 5-IV-2(5), and § 5-IV-3(a) respectively.

Plan review for a demolition permit in Gillette typically runs 0–5 business days. This is an estimate, not a published figure — confirm current review times with City of Gillette Development Services — Building Division at (307) 686-5260.

You'll need: Demolition Permit Application (via EnerGov Self Service). See the required-documents checklist on this page for details on each.

Gillette requires 2 inspection(s) for a demolition permit, in order: Pre-Demolition Utility Disconnects, Final. Schedule each through City of Gillette Development Services — Building Division ((307) 686-5260).

Apply through City of Gillette Development Services — Building Division at City Hall, 201 E. 5th St., 2nd Floor, Gillette, WY 82716. Phone: (307) 686-5260, email: Not published on city site — use "Send an E-mail" contact form on the Building Division page or main line gillette@gillettewy.gov. Office hours: Mon–Fri (contact department for current hours); permits/plans/licenses/inspections managed via EnerGov Self Service online portal (registration required). Official information: https://www.gillettewy.gov/Departments/Development-Services/Building-Division.

Gillette, Wyoming has adopted: International Building Code (IBC), 2021 Edition — including Appendix C, adopted by City of Gillette Code Chapter 5, Article I § 5-I-2 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-2.A text now reads "2021 Edition, including Appendix C" and no longer cites Ord. 4052 (12-17-2024), which had adopted the 2024 IBC edition with Appendices C and H per the source PDF as of the prior 2026-07-01 verification; the 2024-edition adoption no longer appears in the current ordinance text.; International Residential Code (IRC), 2021 Edition — including Appendices AA, AB, AC, AE, AN, AQ, and AW (AW 3D Printed Construction), adopted § 5-I-3 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-3.A text now reads "2021 Edition" with this different appendix set (previously 2024 Edition, Appendices CA, CB, BA, CE, BB, BM per Ord. 4052, 12-17-2024, which no longer appears in the current ordinance text).; International Plumbing Code (IPC), 2021 Edition — including Appendices B, D, E, adopted § 5-I-4 (Revised 6-16-2026) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code. CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices B, D, E unchanged.; International Mechanical Code (IMC), 2021 Edition — adopted § 5-I-5 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited).; National Electrical Code — City Code § 5-I-6 (Revised 6-16-2026) (including Article 80/Annex H). CHANGED 2026-07-16 audit: the live § 5-I-6.A paragraph now contains two different edition references in the same sentence — "...adopted by reference the National Electrical Code, 2023 Edition..." and later "...of the National Electrical Code, 2026 Edition, including Article 80, are hereby referred to, adopted..." — with the amendment history newly listing Ord. 4081 (6-16-2026) as the latest ordinance for this section. The ordinance's own text does not reconcile the two edition years; previously cited cleanly as 2023 Edition only.; International Fuel Gas Code (IFGC), 2021 Edition — including Appendices A, B, C, D, adopted § 5-I-7 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices A, B, C, D unchanged.; International Fire Code (IFC), 2021 Edition — including Appendices B, C, D, E, F, and G, adopted § 5-I-8 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 and Appendices H and I are absent (previously 2024 Edition with Appendices B–I per Ord. 4052, 12-17-2024, no longer cited).; International Existing Building Code (IEBC), 2021 Edition — adopted § 5-I-9 (Revised 6-16-2026). CHANGED 2026-07-16 audit: § 5-I-9.A reads "2021 Edition" (previously cited as 2024 Edition; the current text carries no ordinance citation for the edition line).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted § 5-I-10 (Revised 6-16-2026); edition unchanged, only the chapter revision date-stamp updated at the 2026-07-16 audit.. Local amendments apply — see the Gillette overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.