Skip to main content
PermitBase

Fire Sprinkler System Permit in Gillette, Wyoming

Required for installation of a fire sprinkler system in Gillette. The City of Gillette collects a flat $30 permit fee, but — unlike every other permit type in this jurisdiction — the City Code fee table itself states that the Campbell County Fire Department (CCFD), not the City Building Division, performs the plan check and inspections. CCFD's plan-review submittal uses the Wyoming State Fire Marshal's Office (WSFO) Fire Sprinkler System checklist.

Verified 2026-07-22 · Source

When you need this permit

  • City Code § 5-IV-1(b) fee table lists the line item verbatim: "Fire Sprinkler Systems Campbell County Fire Department performs the plan check and inspections. $30" — the City collects the fee, CCFD performs the technical review and inspections
  • Plan submittals must follow the Wyoming State Fire Marshal's Office (WSFO) Fire Sprinkler System plan-review checklist; CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required
  • CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319); published CCFD construction-inspection types for sprinkler work include "sprinkler rough in" and "sprinkler hydro"
  • Fire plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry) — a standalone fire-sprinkler-only project follows the same CCFD review path
  • A contractor installing a RESIDENTIAL fire suppression/sprinkler system must hold a City of Gillette Residential Fire Suppression System license (City Code § 5-III-24, § 5-III-25) — $50 new, $50 renewal annually, per § 5-III-27's fee schedule
  • Commercial/industrial fire sprinkler installers are licensed under the City's Class F Fire Suppression contractor classification (City Code Chapter 5, Article III); the Board of Examiners' reciprocity provisions (§ 5-III-1(d)(2)) accept proof of NICET, American Fire Sprinkler Association, or National Fire Sprinkler Association certification in lieu of City testing for fire-systems work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Sprinkler System PermitCity Code § 5-IV-1(b) (Revised 6-16-2026) — fee collected by the City; plan check and inspections performed by Campbell County Fire Department. No separate CCFD-published review fee was found on the City or CCFD sites as of this 2026-07-22 chase; confirm directly with CCFD at (307) 682-5319 if a distinct CCFD charge applies to a specific project.
$30.00
Residential Fire Suppression System Contractor License — NewCity Code § 5-III-27 fee schedule; annual license, separate from the per-project permit fee
$50.00
Residential Fire Suppression System Contractor License — RenewalCity Code § 5-III-27 fee schedule
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit permit actually take in Gillette?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sprinkler Rough-In

    CCFD construction inspection of sprinkler piping before concealment, per CCFD's published inspection-type list; schedule at least 48 hours in advance via (307) 682-5319

  2. 2

    Sprinkler Hydro (Hydrostatic Test)

    CCFD hydrostatic pressure test of the completed sprinkler system, per CCFD's published inspection-type list

See the full Gillette inspection guide — scheduling & re-inspection fees →

Tips

  • This is the only permit type in Gillette's fee schedule where the City explicitly hands off both plan review AND inspection to an outside agency (Campbell County Fire Department) rather than doing it in-house through the Building Division.
  • Give CCFD's WSFO-format checklist submittal extra care — CCFD states an incomplete submittal cannot be reviewed and will bounce back for resubmittal, which can cost real time on a commercial project timeline.
  • Residential and commercial/industrial fire sprinkler work sit under different City license tracks: Residential Fire Suppression System license ($50/yr) versus the Class F Fire Suppression commercial contractor classification — confirm which applies to your project before applying.

Frequently asked questions

Gillette requires a fire sprinkler system permit for: City Code § 5-IV-1(b) fee table lists the line item verbatim: "Fire Sprinkler Systems Campbell County Fire Department performs the plan check and inspections. $30" — the City collects the fee, CCFD performs the technical review and inspections; Plan submittals must follow the Wyoming State Fire Marshal's Office (WSFO) Fire Sprinkler System plan-review checklist; CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required; CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319); published CCFD construction-inspection types for sprinkler work include "sprinkler rough in" and "sprinkler hydro"; Fire plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry) — a standalone fire-sprinkler-only project follows the same CCFD review path; A contractor installing a RESIDENTIAL fire suppression/sprinkler system must hold a City of Gillette Residential Fire Suppression System license (City Code § 5-III-24, § 5-III-25) — $50 new, $50 renewal annually, per § 5-III-27's fee schedule; Commercial/industrial fire sprinkler installers are licensed under the City's Class F Fire Suppression contractor classification (City Code Chapter 5, Article III); the Board of Examiners' reciprocity provisions (§ 5-III-1(d)(2)) accept proof of NICET, American Fire Sprinkler Association, or National Fire Sprinkler Association certification in lieu of City testing for fire-systems work. If your project isn't listed, confirm with City of Gillette Development Services — Building Division at (307) 686-5260 before starting work.

The City's permit fee is a flat $30.00 (City Code § 5-IV-1(b)). No additional CCFD-specific review fee is published; a Residential Fire Suppression System contractor license ($50/year) is a separate, annual requirement for contractors doing residential sprinkler work, not a per-project fee.

Gillette does not publish a plan-review timeline for this permit. Contact City of Gillette Development Services — Building Division at (307) 686-5260 for current turnaround.

You'll need: Fire Sprinkler System Plan Review Submittal (per WSFO checklist, routed to CCFD); Building Permit / Fire Plans (via EnerGov Self Service). See the required-documents checklist on this page for details on each.

Gillette requires 2 inspection(s) for a fire sprinkler system permit, in order: Sprinkler Rough-In, Sprinkler Hydro (Hydrostatic Test). Schedule each through City of Gillette Development Services — Building Division ((307) 686-5260).

Apply through City of Gillette Development Services — Building Division at City Hall, 201 E. 5th St., 2nd Floor, Gillette, WY 82716. Phone: (307) 686-5260, email: Not published on city site — use "Send an E-mail" contact form on the Building Division page or main line gillette@gillettewy.gov. Office hours: Mon–Fri (contact department for current hours); permits/plans/licenses/inspections managed via EnerGov Self Service online portal (registration required). Official information: https://www.gillettewy.gov/Departments/Development-Services/Building-Division.

Gillette, Wyoming has adopted: International Building Code (IBC), 2021 Edition — including Appendix C, adopted by City of Gillette Code Chapter 5, Article I § 5-I-2 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-2.A text now reads "2021 Edition, including Appendix C" and no longer cites Ord. 4052 (12-17-2024), which had adopted the 2024 IBC edition with Appendices C and H per the source PDF as of the prior 2026-07-01 verification; the 2024-edition adoption no longer appears in the current ordinance text.; International Residential Code (IRC), 2021 Edition — including Appendices AA, AB, AC, AE, AN, AQ, and AW (AW 3D Printed Construction), adopted § 5-I-3 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-3.A text now reads "2021 Edition" with this different appendix set (previously 2024 Edition, Appendices CA, CB, BA, CE, BB, BM per Ord. 4052, 12-17-2024, which no longer appears in the current ordinance text).; International Plumbing Code (IPC), 2021 Edition — including Appendices B, D, E, adopted § 5-I-4 (Revised 6-16-2026) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code. CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices B, D, E unchanged.; International Mechanical Code (IMC), 2021 Edition — adopted § 5-I-5 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited).; National Electrical Code — City Code § 5-I-6 (Revised 6-16-2026) (including Article 80/Annex H). CHANGED 2026-07-16 audit: the live § 5-I-6.A paragraph now contains two different edition references in the same sentence — "...adopted by reference the National Electrical Code, 2023 Edition..." and later "...of the National Electrical Code, 2026 Edition, including Article 80, are hereby referred to, adopted..." — with the amendment history newly listing Ord. 4081 (6-16-2026) as the latest ordinance for this section. The ordinance's own text does not reconcile the two edition years; previously cited cleanly as 2023 Edition only.; International Fuel Gas Code (IFGC), 2021 Edition — including Appendices A, B, C, D, adopted § 5-I-7 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices A, B, C, D unchanged.; International Fire Code (IFC), 2021 Edition — including Appendices B, C, D, E, F, and G, adopted § 5-I-8 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 and Appendices H and I are absent (previously 2024 Edition with Appendices B–I per Ord. 4052, 12-17-2024, no longer cited).; International Existing Building Code (IEBC), 2021 Edition — adopted § 5-I-9 (Revised 6-16-2026). CHANGED 2026-07-16 audit: § 5-I-9.A reads "2021 Edition" (previously cited as 2024 Edition; the current text carries no ordinance citation for the edition line).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted § 5-I-10 (Revised 6-16-2026); edition unchanged, only the chapter revision date-stamp updated at the 2026-07-16 audit.. Local amendments apply — see the Gillette overview page for the full list.

The City of Gillette collects a flat $30 permit fee (City Code § 5-IV-1(b)), but the Campbell County Fire Department performs the actual plan check and inspections, using the Wyoming State Fire Marshal's Office's Fire Sprinkler System checklist for the submittal requirements.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.