Skip to main content
PermitBase

Residential Addition / Remodel Permit in Green River, Wyoming

Required for additions, remodels, and interior alterations to existing residential structures in Green River, including square-footage-increasing additions and interior remodeling.

Verified 2026-07-01 · Source

When you need this permit

  • Additions or remodeling: floor plan/site plan required if adding square footage
  • Interior remodeling: floor plan drawn to scale
  • Replacing windows or doors: no site plan required, but a permit is still required
  • Retaining walls over 4 feet tall, or any wall supporting a surcharge: two sets of building plans and a site plan required
  • Siding/stucco and irrigation systems require a permit (no site plan)
  • Building a garage: two sets of building plans and a site plan

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — residential rate (50% of general valuation table)City of Green River Development Services Fees schedule (eff. July 1, 2018): remodels and additions within the scope of the adopted IRC are charged at 50% of the general valuation fee table; no separate flat fee line exists for additions/remodels.
Varies by construction valuation — same 50%-of-table structure as new residential construction
Residential Plan Review DepositApplies to new single- or two-family dwellings; subtracted from the final Building Permit Fee.
$100.00

Review timeline

Plan reviewGreen River’s published plan-review target
1–14 business days

How long did your Residential Addition / Remodel Permit permit actually take in Green River?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation (if new footings)

    Before concrete pour, if the addition involves new footings

  2. 2

    Framing

    After framing, before insulation or wall cover

  3. 3

    MEP Rough-In

    Electrical, plumbing, mechanical rough-in as applicable before walls closed

  4. 4

    Final

    All work complete per approved plans

See the full Green River inspection guide — scheduling & re-inspection fees →

Tips

  • Fencing requires a permit application in Green River but there is no charge for it, per the Work Requiring a Building Permit list — a scaled site plan is still required.
  • Retaining walls 4 feet or less that do not support a surcharge do not require a building permit under the adopted IRC/IBC Section 105 exemptions.
  • Sheds up to 200 sq ft (residential, per the shed structure definition) may not require a Building Permit — a Zoning Permit Application is used instead; sheds over 200 sq ft or taller than one story require a full Building Permit as an accessory structure.

Frequently asked questions

Yes. Window and door replacement requires a building permit, though no site plan is required for this scope of work.

No permit fee is charged for fencing, but a permit application and a scaled site plan showing the fence location are still required per the City's Work Requiring a Building Permit list.

Green River's published plan-review target for a residential addition / remodel permit is 1–14 business days.

You'll need: Building Permit Application (DocumentCenter Doc #5572); Work Requiring a Building Permit (DocumentCenter Doc #4166). See the required-documents checklist on this page for details on each.

Green River requires 4 inspection(s) for a residential addition / remodel permit, in order: Foundation (if new footings), Framing, MEP Rough-In, Final. Schedule each through City of Green River Development Services — Building Inspection Division ((307) 872-6140).

Apply through City of Green River Development Services — Building Inspection Division at 50 E 2nd North Street, Green River, WY 82935. Phone: (307) 872-6140, email: Contact via Development Services (see department website). Office hours: Monday through Friday, 8:00 a.m. to 5:00 p.m.. Official information: https://www.grwyo.org/87/Building-Inspection.

Green River, Wyoming has adopted: 2024 International Building Code (IBC), including Appendices B, I, J — adopted by City of Green River Code of Ordinances Sec. 7-16 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); Chapter 27 (Electrical) of the IBC is deleted by local amendment since electrical is separately governed by the local NEC adoption (Sec. 7-76); 2024 International Residential Code (IRC), including Appendices AA, BA, BE, BF, CA, CB, CD — Sec. 7-17 (Ord. No. 25-01, 1-21-25); local design criteria: Ground Snow Load 30 psf, Wind Speed 115 mph, Seismic Design Category C, Weathering Severe, Frost Line Depth 42 inches, Termite None to Slight, Winter Design Temp -20°F, Ice Shield Underlayment Required, Air Freezing Index 2282, Elevation 6,132 ft; 2024 International Plumbing Code (IPC), including all appendices — Sec. 7-31 (Ord. No. 25-01, 1-21-25), with local amendment to Section 305.4 (Freezing) restricting exterior/attic/crawlspace pipe placement; 2024 International Mechanical Code (IMC), including all appendices — Sec. 7-46 (Ord. No. 25-01, 1-21-25); 2024 International Fuel Gas Code (IFGC) — Sec. 7-91 (Ord. No. 25-01, 1-21-25); National Electrical Code (NEC), latest edition as adopted by the Wyoming State Fire Marshal's Office (2023 NEC was in effect through June 30, 2026; per wsfm.wyo.gov/electrical-safety, the 2026 NEC took effect statewide July 1, 2026) — adopted by reference for Green River under Sec. 7-76 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); enforced locally by the City under Home Rule, not by the state electrical program. Local amendments apply — see the Green River overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.