PermitBaseMountain West

Commercial Tenant Improvement Permit in Green River, Wyoming

Verified

Required for interior remodels, additions, and tenant improvements to commercial and industrial buildings in Green River. Governed by the 2024 International Building Code (IBC) as adopted by Sec. 7-16, charged at 100% (not the 50% residential rate) of the general valuation fee table. Certain commercial projects require additional State Fire Marshal's office review.

Verified 2026-07-01 · Source

100% of: $30.00 ($1-$500), $60.00 ($501-$1,000), or $90.00 ($1,001-$2,000)Building Permit Fee — commercial/multi-family rate, valuation $1 to $2,000

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit Fee — commercial/multi-family rate, valuation $1 to $2,000100% of: $30.00 ($1-$500), $60.00 ($501-$1,000), or $90.00 ($1,001-$2,000)City of Green River Development Services Fees schedule (effective July 1, 2018): commercial and multi-family projects are calculated at 100% of the general valuation fee table (vs. 50% for residential).
Building Permit Fee — commercial rate, valuation $25,001 to $50,000$504.00 for the first $25,000 + $13.50 for each additional $1,000 or fraction thereof (100% rate)
Commercial and Multi-family Construction Plan Review Fee65% of the Building Permit FeeCollected at the time of Plan Review submittal, based on estimated construction valuation; in addition to the Building Permit fee.

Review timeline

~114 business days

Typical estimate — confirm current times with the Green River building department

Inspection process

  1. 1

    Framing / Structural

    After framing, before wall cover

  2. 2

    MEP Rough-In

    Mechanical, electrical, plumbing rough-in before walls closed

  3. 3

    Final / Certificate of Occupancy

    All work complete, life-safety systems verified

Tips

Frequently asked questions

Are commercial building permits more expensive than residential in Green River?
Yes. Per the Development Services Fees schedule, commercial and multi-family permits are calculated at 100% of the general valuation fee table, while qualifying residential (IRC-scope) construction is calculated at 50% of the same table.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Green River

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.