Commercial Building Permit / Tenant Improvement in Jackson, Wyoming
VerifiedRequired for construction, alteration, or tenant improvement of commercial, office, multi-family, or warehouse buildings in the Town of Jackson. Governed by the 2024 IBC, with a mandatory nonrefundable plan review deposit for all commercial submittals.
Verified 2026-07-01 · Source
When you need this permit
- WUI permit number (from Jackson Hole Fire/EMS) required before submittal, same as residential
- A nonrefundable plan review deposit is due for all commercial building permit submittals; contractors of record can pay via their SmartGov portal
- Fire sprinklers required for structures 5,000 sq ft or larger
- Fire Department (Jackson Hole Fire/EMS) plan review and construction permits required under the adopted 2024 IFC
- Baby-changing-table and other life-safety/accessibility standards apply per adopted code amendments
Required documents
- Req
Commercial Building Permit Application (PDF)
- Req
Full Construction Drawing Set
Architectural, structural, mechanical, plumbing, electrical plans stamped by design professionals as applicable
- Opt
Addendum — Building Permit Application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — Commercial, Office, Multi-family and similar | $1.13 per square foot | Resolution 25-18 Appendix A |
| Building Permit — Warehouse, storage and similar | $1.70 per square foot | Resolution 25-18 Appendix A |
| Deposit on Building Permit (non-refundable, applied to full fee) | $564.00 | Resolution 25-18 Appendix A |
| Plan Review Fee | 65% of the building permit fee | Resolution 25-18 Appendix A |
| Fire Permits (IFC/IWUIC) — all construction plan reviews (2-hour minimum) | $154.00/hr | JMC 15.08.010; Resolution 25-18 Appendix A |
| Fire Protection Construction Permit — valuation-based | $41.00 for the first $500, scaling through defined bands to $6,096.26 + $4.09/additional $1,000 over $1,000,000 | Resolution 25-18 Appendix A, Fire Protection Construction Permit Valuation table |
Review timeline
~45–45 business days
Typical estimate — confirm current times with the Jackson building department
Inspection process
- 1
Rough Electrical
- 2
Combination Rough (Mechanical/Plumbing/Gas/Framing)
- 3
Fire Inspection
Fire alarm, sprinkler, and suppression systems reviewed by Jackson Hole Fire/EMS
- 4
Final / Certificate of Occupancy
Tips
- Commercial submittals require a nonrefundable plan review deposit up front, separate from the final building permit fee calculation — pay via the SmartGov portal.
- Fire Department construction-permit fees (under IFC/IWUIC) are billed separately from the Building Division's building permit fee — budget for both.
Frequently asked questions
- Is a plan review deposit required for commercial permits in Jackson?
- Yes. A nonrefundable plan review fee/deposit is due for all commercial building permit submittals, payable by contractors of record through the SmartGov portal, separate from the final building permit fee.
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- Town of Jackson Planning & Building Department — Building Division — official building department
- Town of Jackson — Commercial Building Permit Application page
- Commercial Building Permit Application (PDF)
- Resolution 25-18 Appendix A — Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Jackson
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.