Mechanical / Fuel Gas Permit in Jackson, Wyoming
VerifiedRequired to alter, convert, enlarge, erect, install, remove, or repair a mechanical system in the Town of Jackson. Governed by the 2024 International Mechanical Code and 2024 International Fuel Gas Code.
Verified 2026-07-01 · Source
When you need this permit
- Work must be installed by a licensed mechanical (HVAC) contractor holding a valid Town of Jackson Contractor's License
- Applied for through the Town of Jackson SmartGov Portal
Required documents
- Req
Mechanical Permit Application (via SmartGov Portal)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| For the issuance of each permit | $56.00 | JMC 15.12.030; Resolution 25-18 Appendix A |
| For issuing each supplemental permit | $23.00 | Resolution 25-18 Appendix A |
| Install/relocate gravity or forced-air furnace to 100,000 btu/h | $29.00 | Resolution 25-18 Appendix A; over 100,000 btu/h = $34.00 |
| Repair or alter any heating, cooling, absorption or evaporative system | $129.00 | Resolution 25-18 Appendix A |
| Each air-handling unit up to 10,000 cfm and attached ducts | $23.00 | Resolution 25-18 Appendix A; over 10,000 cfm = $34.00 |
| Hydronic Heating installation — up to 1,000 sq ft / 1,001-2,500 sq ft / 2,501-5,000 sq ft / 5,001+ sq ft | $25.00 / $39.00 / $56.00 / $85.00 | Resolution 25-18 Appendix A |
| Gas-piping system to 5 outlets | $18.00 | Resolution 25-18 Appendix A; each additional outlet $6.00 |
| Re-inspection fee / Additional plan review | $85.00/hr to $113.00/hr | Resolution 25-18 Appendix A |
Review timeline
~1–10 business days
Typical estimate — confirm current times with the Jackson building department
Inspection process
- 1
Rough Mechanical
Combination inspection with Rough Gas/Plumbing/Framing, scheduled only after a passed Rough Electrical inspection
- 2
Final
Tips
- Mechanical permit fees are itemized by equipment type and capacity (furnace BTU rating, boiler/compressor HP, air-handling CFM) rather than a single flat fee — see Resolution 25-18 Appendix A for the complete list including boilers, incinerators, ventilation fans, and hood systems.
Frequently asked questions
- Do I need a Town of Jackson contractor license to pull a mechanical permit?
- Yes. Any work requiring a mechanical permit must be installed by a licensed mechanical (HVAC) contractor holding a valid Town of Jackson Contractor's License, applied for through the SmartGov portal.
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- Town of Jackson Planning & Building Department — Building Division — official building department
- Town of Jackson — Mechanical Permit page
- Resolution 25-18 Appendix A — Fee Schedule (Mechanical Permit section)
- Jackson Municipal Code Title 15 Ch. 15.12 — International Mechanical Code (Municode)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Jackson
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.