Mechanical / HVAC Permit — Cheyenne, Wyoming · Requirements sheet
Verified 2026-07-01 · Source: https://www.cheyennecity.org/files/sharedassets/public/v/2/departments/city-treasurer/schedule-of-fees/schedule-of-fees.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Cheyenne, Wyoming
Required for heating, cooling, ventilation, and fuel gas installations in Cheyenne. Issued by the City's Compliance Department under the 2024 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC).
Verified 2026-07-01 · Source
When you need this permit
- Furnace, A/C, heat pump, boiler installation or replacement
- Ductwork installation or modification
- Gas piping/fuel gas systems
- Submit the 'Plumbing, Mechanical, Electrical Permit Application' (select Mechanical) or include mechanical scope on the combined building permit application
- Licensed City of Cheyenne mechanical contractor required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In/Equipment
Equipment installation and ductwork before walls closed
- 2
Final
Equipment operational, combustion air and venting verified
See the full Cheyenne inspection guide — scheduling & re-inspection fees →
Tips
- Cheyenne's winter design temperature is -1°F with 7,381 heating degree days per the Building Safety Department's design criteria — HVAC sizing should account for this severe heating load.
- Gas fireplaces/logs are specifically called out on the City's combined Plumbing/Mechanical/Electrical permit application form (a Yes/No + count field) — they require a permit.
- 2026-07-17 rotation audit: re-confirmed live via Municode Ch. 15.16.010 that the 2024 International Mechanical Code is the current adopted edition (Ord. No. 4613, §5, 2-24-25); the valuation-based fee table and 65% Plan Review Fee were also re-confirmed against the live Schedule of Fees PDF. The winter design temp (-1°F) / 7,381 HDD figure could not be re-confirmed this pass — it does not appear on the City's current live Table R301.2(1) design-criteria table (which replaced/updated other figures like wind speed and snow load), so treat it as carried over from the older 2023 handout until a current source is found.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cheyenne
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Cheyenne project checklist
Describe your project once and get every permit, document, and fee it triggers in Cheyenne — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →