Skip to main content
PermitBase

Change of Use Permit in Cheyenne, Wyoming

Required when a property's use changes in a way that meets the Unified Development Code's (UDC) change-of-use criteria. Combines a Building/Compliance Department 'Change of Use Permit' fee with, in most cases, a Planning and Development Department Site Plan (or reduced Site Plan Change of Use Documentation) review, and concludes with issuance of a Certificate of Occupancy for the new use.

Verified 2026-07-22 · Source

When you need this permit

  • Per the City's Building/Planning FAQ, a change of use constitutes at least one of: the proposed use is appreciably different than the current use; there is an increase in the size of the existing building or extent of the use of the land; the new use is permitted in the zoning district but requires more parking than the previous use; the new use generates more vehicle trips than the previous use (per the Institute of Transportation Engineers' Trip Generation, latest edition); or the amount of stormwater runoff/impervious surface area increases with the new use
  • A Site Plan application is required for any change of use or new building (among other triggers), except for single-family, duplex, or townhouse development
  • If the change of use involves NO proposed exterior modifications, Planning and Development accepts a reduced 'Site Plan Change of Use Documentation' in place of a full Site Plan application
  • A Certificate of Occupancy is issued when the Building Official finds no code violations for the change of use of an existing structure, following required inspections
  • A financial surety bond (125% of cost for site/landscaping work, 150% for right-of-way work) is required for any unfinished exterior work when a Site Plan and final Planning inspection are required, prior to TCO or CO issuance
  • Contractors performing any construction work associated with the change of use must hold current City of Cheyenne contractor licenses Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Misc. Building and Construction Permit Fees -- Change of Use Permit (Minimum Fee)City of Cheyenne Schedule of Fees (Ordinance 4254); charged by the Compliance/Building Department
$250.00
Planning Fees -- Site Plan Change of Use Documentation with No Proposed Exterior ModificationsCity of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213); a separate, distinct fee from the Building Department's $250 Change of Use Permit fee -- both can apply to the same project. Confirmed directly against the live Schedule of Fees PDF 2026-07-22
$100.00
Temporary Certificate of Occupancy -- One and Two Family DwellingsCity of Cheyenne Schedule of Fees, Misc. Building and Construction Permit Fees (Ordinance 4254); confirmed directly against the live Schedule of Fees PDF 2026-07-22 -- this residential TCO fee tier was not previously priced elsewhere in this file
$300.00
Temporary Certificate of Occupancy -- Commercial StructuresCity of Cheyenne Schedule of Fees, Misc. Building and Construction Permit Fees (Ordinance 4254)
$1,250.00
Penalty to Convert Temporary Certificate of Occupancy (Commercial, or One and Two Family Dwellings)City of Cheyenne Schedule of Fees, In-House fee, City Code § 1-10 -- applies to both commercial and residential TCOs if not converted to a full CO within the required timeframe
$750.00 each

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use Permit permit actually take in Cheyenne?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Building Official verifies no code violations exist for the changed use; prerequisite for Certificate of Occupancy issuance

See the full Cheyenne inspection guide — scheduling & re-inspection fees →

Tips

  • The $250 Change of Use Permit fee (Compliance/Building Department, Ordinance 4254) and the $100 Site Plan Change of Use Documentation fee (Planning and Development, Resolution 6213) are two DIFFERENT fees that can both apply to the same change-of-use project -- don't assume one covers the other.
  • If your change of use involves no exterior modifications, ask Planning and Development whether the reduced $100 Site Plan Change of Use Documentation applies instead of a full $600 Site Plan review.
  • No separate fee exists for issuance of a final (non-temporary) Certificate of Occupancy -- confirmed absent from the live Schedule of Fees PDF 2026-07-22; only the Temporary CO and its late-conversion penalty carry fees. This is a verified finding, not a gap.
  • 2026-07-22 finding: the $300.00 Temporary Certificate of Occupancy fee for One and Two Family Dwellings (Ordinance 4254) had not previously been priced anywhere in this file -- only the $1,250 commercial TCO fee and the $750 conversion penalties were previously documented.

Frequently asked questions

Cheyenne requires a change of use permit for: Per the City's Building/Planning FAQ, a change of use constitutes at least one of: the proposed use is appreciably different than the current use; there is an increase in the size of the existing building or extent of the use of the land; the new use is permitted in the zoning district but requires more parking than the previous use; the new use generates more vehicle trips than the previous use (per the Institute of Transportation Engineers' Trip Generation, latest edition); or the amount of stormwater runoff/impervious surface area increases with the new use; A Site Plan application is required for any change of use or new building (among other triggers), except for single-family, duplex, or townhouse development; If the change of use involves NO proposed exterior modifications, Planning and Development accepts a reduced 'Site Plan Change of Use Documentation' in place of a full Site Plan application; A Certificate of Occupancy is issued when the Building Official finds no code violations for the change of use of an existing structure, following required inspections; A financial surety bond (125% of cost for site/landscaping work, 150% for right-of-way work) is required for any unfinished exterior work when a Site Plan and final Planning inspection are required, prior to TCO or CO issuance; Contractors performing any construction work associated with the change of use must hold current City of Cheyenne contractor licenses. If your project isn't listed, confirm with City of Cheyenne Compliance Department — Building Safety Division at (307) 637-6265 before starting work.

In Cheyenne, the published Misc. Building and Construction Permit Fees -- Change of Use Permit (Minimum Fee) is: $250.00. Additional published fees: Planning Fees -- Site Plan Change of Use Documentation with No Proposed Exterior Modifications — $100.00; Temporary Certificate of Occupancy -- One and Two Family Dwellings — $300.00; Temporary Certificate of Occupancy -- Commercial Structures — $1,250.00; Penalty to Convert Temporary Certificate of Occupancy (Commercial, or One and Two Family Dwellings) — $750.00 each. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Cheyenne does not publish a plan-review timeline for this permit. Contact City of Cheyenne Compliance Department — Building Safety Division at (307) 637-6265 for current turnaround.

You'll need: Site Plan or Site Plan Change of Use Documentation. Depending on your project, Cheyenne may also ask for: Building Permit Application (via OpenGov portal). See the required-documents checklist on this page for details on each.

Cheyenne requires 1 inspection(s) for a change of use permit, in order: Final. Schedule each through City of Cheyenne Compliance Department — Building Safety Division ((307) 637-6265).

Apply through City of Cheyenne Compliance Department — Building Safety Division at 2101 O'Neil Avenue, Room 202, Cheyenne, WY 82001. Phone: (307) 637-6265, email: Not published on city site — use main phone or OpenGov portal messaging. Office hours: Mon–Fri (contact department for current hours); permits/inspections managed via OpenGov portal (cheyennewy.portal.opengov.com). Official information: https://www.cheyennecity.org/Your-Government/Departments/Compliance-Department/Building-Permitting-Licensing.

Per the City's FAQ, a change of use is at least one of: the proposed use is appreciably different than the current use; there is an increase in the size of the existing building or extent of the use of the land; the new use requires more parking than the previous use though still permitted in the district; the new use generates more vehicle trips than the previous use (per ITE Trip Generation, latest edition); or the amount of stormwater runoff/impervious surface area increases with the new use.

A Certificate of Occupancy is a formal document issued when a new building construction project or a change of use to a structure has been completed according to approved plans and approved by the building inspector. When the Building Official finds no code violations, they issue a Certificate of Occupancy for newly constructed buildings or for a change of use of an existing structure.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.