Change of Occupancy / Certificate of Occupancy in Jackson, Wyoming
The Town of Jackson has no standalone Change of Use or Certificate of Occupancy permit product or fee line. 'Change of Occupancy for any existing Commercial Building or Tenant Space' is explicitly listed as one of the project types that requires the standard Commercial Building Permit (jacksonwy.gov Commercial Building Permit Application page, 'What Requires a Permit'). The Certificate of Occupancy itself is issued under the adopted 2024 IBC Section 111 (via JMC 15.04.020) as the final step of any building permit — new construction, addition, remodel, or change of occupancy alike. This is corroborated by the Town's own Contractor Licensing page, which anchors the Proprietary Homeowner Contractor's 8-year build-frequency limit to 'the date of issuance of the certificate of occupancy.'
Reviewed 2026-07-22 · Source
When you need this permit
- A change in use/occupancy classification of an existing commercial building or tenant space must be submitted as a standard Commercial Building Permit application, not a separate change-of-use application
- A Certificate of Occupancy is required before occupying any new, altered, or reoccupied structure, issued under the adopted 2024 IBC Section 111 (JMC 15.04.020)
- Final sign-off from Building, Engineering, Fire/Electrical (Jackson Hole Fire/EMS), and Planning departments is required on the Permit/Inspection Card before a Certificate of Occupancy or Completion is issued (same cross-departmental sign-off documented in the residential-building-permit entry)
- A Temporary Certificate of Occupancy (TCO) may be requested under IBC Section 111.3 if the building is safe to occupy but minor, non-life-safety work remains incomplete, subject to Building Official approval — this specific provision is sourced from a secondary summary of the Municode ordinance text rather than directly quoted primary-source text; confirm at application time
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Final / Certificate of Occupancy
All departments (Building, Engineering, Fire/Electrical, Planning) must sign off on the Permit/Inspection Card before a Certificate of Occupancy or Completion is issued
See the full Jackson inspection guide — scheduling & re-inspection fees →
Tips
- Jackson does not have a dedicated 'change of use' or 'certificate of occupancy' permit or fee — this is a verified fact, not a gap, consistent with how this record documents other folded-in permit types (EV chargers, solar, reroofs). Apply for a standard Commercial Building Permit and mark the project type as a change of occupancy.
- Some secondary sources reference an IBC Section 111 local amendment requiring floor load signs to be installed before a Certificate of Occupancy is issued. It has not been confirmed against Municode's primary ordinance text, whose Jackson code pages render via JavaScript and do not open reliably — open them in an ordinary web browser, or verify with the Building Department (townbuilding@jacksonwy.gov), before relying on it.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Jackson's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Jackson yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Jackson lands. Privacy.
Other permits in Jackson
Change of Occupancy / Certificate of Occupancy in other cities
Compare change of occupancy / certificate of occupancy fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Jackson project checklist
Describe your project once and get every permit, document, and fee it triggers in Jackson — in one checklist. Free, for any city and any number of projects.
Get started →