Grading Permit (Statement Level / Plan Level) in Jackson, Wyoming
Required for all land-disturbing activities and excavation in the Town of Jackson per LDR Section 5.7.1.D, unless explicitly exempted. Administered by the Town Engineering Division (Public Works). Submitted with the building permit application for most residential scopes; a standalone Grading Pre-Application is required only for Plan-Level projects.
Verified 2026-07-01 · Source
When you need this permit
- Two levels: Statement Level (Town Engineer review of small-area disturbances) and Plan Level (prepared by a Wyoming-registered professional engineer or landscape architect)
- Plan Level projects require a Grading Pre-Application Conference with the Town Engineering Department before submittal
- Covers grading, topsoil removal, filling, road/drive cutting, stream/channel alteration, soil and water conservation structures, and extraction/placement of rock, sand, or gravel
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Final Grading Inspection
See the full Jackson inspection guide — scheduling & re-inspection fees →
Tips
- For most single-family residential building permits, grading information is submitted directly WITH the building permit application — a separate freestanding grading permit is typically only needed for Plan-Level scopes.
- The Town's Grading Permits webpage lists slightly older flat figures ($200 Statement / $600 Plan Level / $150 pre-application) than the currently adopted Resolution 25-18 Appendix A fee schedule ($212 / $636 / $155 per hour plus a $53 application fee) — the Resolution, effective July 22, 2025, is the more current authoritative source; verify at application time.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Jackson
Grading Permit (Statement Level / Plan Level) in other cities
Compare grading permit (statement level / plan level) fees across Wyoming →