Jackson's term for an accessory dwelling unit is the Accessory Residential Unit (ARU). There is no permit type separate from the standard One and Two Family Building Permit — an ARU is built under that same building permit, with its own line item ('Attached ARU') on the gross-square-footage tabulation. ARUs are zoning-gated (allowed only in specific zones per Ordinance 1139) and are notable in Jackson/Teton County for a workforce-housing rental restriction.

Verified 2026-07-01 · Source

$1.70/sq ft (new construction) or valuation-based (addition to existing home)Building Permit — charged under the same per-square-foot / valuation schedule as the primary residence

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit — charged under the same per-square-foot / valuation schedule as the primary residence$1.70/sq ft (new construction) or valuation-based (addition to existing home)Resolution 25-18 Appendix A; no separate ARU fee line exists — verified general Building Permit table applies
WUI Permit Review Fee (prerequisite)$150.00Teton County / Jackson Hole Fire/EMS WUI Information for Contractors page

Review timeline

~4545 business days

Typical estimate — confirm current times with the Jackson building department

Inspection process

  1. 1

    Foundation

  2. 2

    Rough Electrical, then Combination Rough (Gas/Plumbing/Mechanical/Framing)

  3. 3

    Final

Tips

Frequently asked questions

What is an ADU called in Jackson, Wyoming?
Jackson calls it an Accessory Residential Unit (ARU). It is built under the standard One and Two Family Building Permit — there is no separate ADU/ARU permit type or fee.
Can I build my own ARU as a homeowner in Jackson without a licensed contractor?
No. The Town's Proprietary Homeowner Contractor exemption, which otherwise lets a homeowner build their own principal residence, explicitly excludes accessory residential units. ARU construction always requires a licensed Town of Jackson contractor.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Jackson

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.