Electrical Permit in Riverton, Wyoming
Required for electrical wiring installation, alteration, or repair in the City of Riverton. Per the Wyoming Dept. of Fire Prevention & Electrical Safety 'LOCAL AND STATE JURISDICTIONS' chart, Fremont County's ELEC columns are marked S/S (state) at the COUNTY level — but Riverton's own Municipal Code shows the CITY itself independently adopted the National Electrical Code by dynamic reference to 'the latest edition' (RMC § 15.08.110(B)(2); Chapter 15.08 'Electrical Code') — currently the 2026 NEC, effective statewide July 1, 2026 per wsfm.wyo.gov/electrical-safety (the 2023 NEC applied from July 1, 2023 until then) — and operates its own electrical permitting and inspection program under a city Electrical Inspector, distinct from the unincorporated-county default. The State of Wyoming (WSFM) continues to license individual electrical contractors/journeymen statewide, but inside Riverton city limits it is the CITY that issues the wiring permit and performs rough/final inspections.
Verified 2026-07-01 · Source
When you need this permit
- Permit required for installation, alteration, addition, or repair of electrical wiring, devices, or equipment (RMC § 15.08.080)
- Issued only to a licensed Wyoming electrical contractor registered with the City of Riverton, OR to a homeowner performing work with their own hands in their own owner-occupied one-family dwelling (RMC § 15.08.080.A.1–2) Owner-builder
- Electrical contractors must hold a current Wyoming electrical contractor's license (state-issued) AND register with the City of Riverton (RMC § 15.08.050) Contractor
- Temporary electric service (temporary meter base with approved grounding) may be installed by a licensed contractor or homeowner and requires a temporary-service inspection Contractor
- Rough electric inspection required after all wiring and boxes are installed, before insulation/sheetrock
- Certain minor work is exempt from permitting per NEC Article 80 Section 80.19 (e.g., portable cord-and-plug appliances, like-for-like fixture/overcurrent-device replacement, low-voltage Class 2/3 circuits under 25V/50W) — RMC § 15.08.080.A.5
- Riverton's own Electrical Code (RMC § 15.08.110(B)(2)) adopts 'the latest edition' of the NEC by dynamic reference — currently the 2026 NEC, effective statewide July 1, 2026 per WSFM, matching the statewide default edition (the 2023 NEC applied from July 1, 2023 until then)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Temporary Electric Service
After temporary meter base post with approved grounding is installed
- 2
Rough Electric
After all wiring and boxes are installed, before insulation/sheetrock
- 3
Final
Part of the overall Final Inspection for the project; electrical inspector tags the installation as approved or requiring correction
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- IMPORTANT determination: the WY State Fire Marshal jurisdictions chart marks Fremont County's electrical columns as state (S/S) at the unincorporated-county level, and the framework's default assumption for Riverton going in was 'state program.' However, Riverton's OWN Municipal Code (Chapter 15.08, 'Electrical Code,' adopted under W.S. § 35-9-121(a)(iv) delegated authority) shows the city runs its own electrical permitting and inspection program inside city limits, with its own Electrical Inspector empowered to permit, inspect, and disconnect service for code violations. This is grounded directly in RMC §§ 15.08.010–15.08.100, cross-checked against the city's own 'Local Design Criteria' page which states 'We have adopted the 2023 National Electrical Code Effective July 1st, 2023' — a page not reworded since (re-verified live 2026-07-17, text unchanged); however the OPERATIVE ordinance text at RMC § 15.08.110(B)(2) requires conformity with 'the latest edition of the National Electrical Code,' a dynamic (ambulatory) reference rather than a fixed 2023 citation — meaning Riverton's applicable edition today is the 2026 NEC, effective statewide July 1, 2026 per wsfm.wyo.gov/electrical-safety, the same as the state default — and the city's own Inspection Procedures list, which includes 'Temporary Electric Service' and 'Rough Electric' as city-performed inspections in the standard permit sequence. Confirm with the Building Department at (307) 856-2999 if your parcel is inside Riverton city limits vs. unincorporated Fremont County — the county (outside city limits) follows the WSFM state program (see the Wyoming State Fire Marshal Wiring Permits page).
- The State of Wyoming still LICENSES electrical contractors, journeymen, and apprentices (WSFM Dept. of Fire Prevention & Electrical Safety, Chief Electrical Inspector) — this licensing role continues regardless of who inspects the work; Riverton additionally requires contractor registration with the city. Contractor
- A homeowner may pull their own electrical permit and perform the work with their own hands in their own owner-occupied one-family dwelling (RMC § 15.08.080.A.2) — but the electrical inspector will not issue the permit unless the person performing the work is specifically named on it. Owner-builder
- There is no separate flat electrical permit fee schedule; electrical work is charged under the general alterations category of Resolution No. 1355 (Electrical Service Upgrade $52 min, Electrical Alteration $26 min) or bundled into the new-construction per-square-foot fee if part of new construction.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
Electrical Permit in other cities
Compare electrical permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Riverton project checklist
Describe your project once and get every permit, document, and fee it triggers in Riverton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →