Plumbing Permit in Riverton, Wyoming
Required for plumbing installations, alterations, and repairs in Riverton. Governed by the 2024 International Plumbing Code with local amendments (RMC Chapter 15.04), including simplified rough-in testing procedures.
Verified 2026-07-01 · Source
When you need this permit
- Plumbing alteration, sanitary sewer replacement, gas line testing, water heater installation/replacement
- DWV systems (underslab only) tested on completion of rough piping by water (10 ft head, 15 min hold) or air (5 psi / 10 in. Hg, 15 min hold) test — Schedule 40 PVC allowed to be tested with air (locally amended IPC §§ 312.1, 312.3 and IRC § P2503.5.1)
- Backflow prevention: required check valve and expansion tank status noted on the application form
- Water tap size 2 inches or greater requires DEQ (Wyoming Dept. of Environmental Quality) review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Underground Plumbing
After all underground waste/vent/water plumbing installed and pressure tested, before backfill/concrete
- 2
Rough Plumbing
After all waste, vent, and water piping is installed, before insulation/sheetrock
- 3
Final
Part of the project's overall Final Inspection
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- Riverton locally amended the IPC/IRC drain-waste-vent testing sections to a simplified standard: a 10-foot water column held 15 minutes, OR a 5 psi (10 in. Hg) air test held 15 minutes, with Schedule 40 PVC explicitly allowed to be tested with air.
- Water/sewer tap sizes of 2 inches or greater trigger a mandatory Wyoming DEQ review — factor this into your project timeline.
- Water & Sewer Plant Investment Fees (tap fees) are billed separately from building-permit plumbing fees — see the City's 'Water & Sewer Plant Investment Fees' schedule (Resolution No. 1521, revised April 1, 2025) for utility connection costs.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
Plumbing Permit in other cities
Compare plumbing permit fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Riverton project checklist
Describe your project once and get every permit, document, and fee it triggers in Riverton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →