Plumbing Permit in Rock Springs, Wyoming

Required for plumbing installations, alterations, and repairs in Rock Springs. Governed by the 2024 International Plumbing Code (IPC) as adopted (with local amendments) by Rock Springs Municipal Code § 150.04. Charged under the general valuation-based building-permit fee schedule.

Verified 2026-07-01 · Source

When you need this permit

  • A permit from the Building Official is required for plumbing work associated with construction, alteration, or repair of a building or structure (§ 150.02(A)(1))
  • Restaurants and any food service facility must submit plans to the Sweetwater County Health Department in addition to city building permit review
  • Any code-mandated element requiring a Wyoming DEQ permit must be obtained and submitted prior to building permit issuance
  • Projects requiring grease traps, sand and grease interceptors, or special sewage treatment must be approved by the City of Rock Springs Pretreatment and Collections Supervisor (307-352-1466)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Plumbing permit fee§ 150.08(A): the IBC fee schedule applies to all adopted codes (including the 2024 IPC per § 150.04) unless a specific override is listed; no plumbing-specific override exists in § 150.08(B)
Charged under the general § 150.08(B) valuation-based building-permit fee schedule — no separate flat plumbing fee line is published
Sewer hookup feeRock Springs Municipal Code § 150.02(A)(3); amount varies by connection — noted as a line item ('SEWER HOOK UP(S) FEE') on the Building Permit Application form
Collected at building permit issuance if the property has not previously been assessed in a special sewer district and a prior connection fee has not been paid

Review timeline

Plan reviewTypical estimate — confirm current times with the Rock Springs building department
~1–10 business days

How long did your Plumbing Permit permit actually take in Rock Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground / Under-slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    All fixtures connected, no leaks, proper venting verified

See the full Rock Springs inspection guide — scheduling & re-inspection fees →

Tips

  • Rock Springs uses the International Plumbing Code (IPC), 2024 edition — not the Uniform Plumbing Code used in some other Mountain West cities.
  • Restaurants/food service plumbing plans require separate Sweetwater County Health Department review in addition to the city building permit.
  • Grease trap/interceptor or special sewage treatment installations need sign-off from the City's Pretreatment and Collections Supervisor before the building permit issues.

Frequently asked questions

Rock Springs requires a plumbing permit for: A permit from the Building Official is required for plumbing work associated with construction, alteration, or repair of a building or structure (§ 150.02(A)(1)); Restaurants and any food service facility must submit plans to the Sweetwater County Health Department in addition to city building permit review; Any code-mandated element requiring a Wyoming DEQ permit must be obtained and submitted prior to building permit issuance; Projects requiring grease traps, sand and grease interceptors, or special sewage treatment must be approved by the City of Rock Springs Pretreatment and Collections Supervisor (307-352-1466). If your project isn't listed, confirm with City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at (307) 352-1540 before starting work.

In Rock Springs, the published Plumbing permit fee is: Charged under the general § 150.08(B) valuation-based building-permit fee schedule — no separate flat plumbing fee line is published. Additional published fees: Sewer hookup fee — Collected at building permit issuance if the property has not previously been assessed in a special sewer district and a prior connection fee has not been paid. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a plumbing permit in Rock Springs typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at (307) 352-1540.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Rock Springs requires 3 inspection(s) for a plumbing permit, in order: Underground / Under-slab, Rough-In, Final. Schedule each through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) ((307) 352-1540).

Apply through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at 212 D Street, Rock Springs, WY 82901. Phone: (307) 352-1540, email: webmaster@rswy.net. Office hours: Mon–Fri, 8:00 a.m. to 5:00 p.m., closed 12:30–1:30 p.m. for lunch. Official information: https://www.rswy.net/departments/public_services/building_inspections_permits.php.

Rock Springs, Wyoming has adopted: 2024 International Building Code (IBC) — with local amendments; adopted per Rock Springs Municipal Code § 150.04, including Appendix E, Appendix I and Appendix J, excluding Chapter 27; 2024 International Residential Code (IRC) — with local amendments per § 150.04(D); including Appendix BF, Appendix B, Appendix C and Appendix CA; excluding R-309, P2904, and several Section R-403.3 subsections/tables/figures; 2024 International Existing Building Code (IEBC) — adopted per § 150.04; 2024 International Mechanical Code (IMC) — with local amendment per § 150.04(C); 2024 International Plumbing Code (IPC) — with local amendment per § 150.04(C); including Appendix D (Degree Day/Design Temperatures), Appendix E (Sizing of Water Pipe Systems) and Appendix C (Structural Safety); 2024 International Fuel Gas Code (IFGC) — including Appendix A, Appendix B and Appendix C; 2024 International Fire Code (IFC) — per City of Rock Springs Building Ordinances page; National Electrical Code, 2023 edition (NFPA) — adopted per § 150.04; enforced locally by the City Electrical Inspector under Rock Springs Municipal Code §§ 150.30–150.36 (city electrical code), NOT the Wyoming State Fire Marshal default program. Local amendments apply — see the Rock Springs overview page for the full list.

The 2024 International Plumbing Code (IPC), adopted with local amendments per Rock Springs Municipal Code § 150.04, including Appendix D, Appendix E, and Appendix C.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rock Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.