EV Charging Station Permit (Electrical Permit) in Rock Springs, Wyoming

Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE in Rock Springs, processed as a standard electrical permit under the 2023 NEC (including Article 625, Electric Vehicle Power Transfer System) as adopted by the City. Rock Springs Municipal Code § 150.08(B) has no dedicated electrical-only fee line, let alone an EV-specific one — the same finding this file's electrical-permit and solar-pv-permit entries document — so an EV charger install is charged under the general valuation-based building-permit fee schedule, with electrical inspection performed by the City's own Electrical Inspector program (not the state).

Verified 2026-07-20 · Source

When you need this permit

  • A permit is required for the EV charger's electrical scope, covering the new/upgraded circuit and EVSE connection under the 2023 NEC (§ 150.04, Codes Adopted)
  • Electrical scope requires City Electrical Inspector review/certificate of inspection before the system may be energized (§ 150.33)
  • Fee is charged under the general § 150.08(B) valuation-based fee schedule based on installation cost, since no electrical-specific or EV-specific override exists in the Municipal Code
  • 24 hours' notice must be given to the City Electrical Inspector before concealment of new wiring (§ 150.33)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

EV charger/EVSE electrical permit (valuation-based)§ 150.08(A) states the fee schedule applies to 'all adopted codes' (which includes the 2023 NEC per § 150.04) unless specifically overridden elsewhere in § 150.08(B); no electrical-specific or EV-specific override exists, so EV charger permits are charged under the same valuation table as building permits generally, the same treatment already documented in this file's electrical-permit entry.
Charged under the general § 150.08(B) valuation-based building-permit fee schedule based on installation cost — no dedicated electrical-only or EV-specific fee line is published
Plan Review Fee§ 150.08(B)(1), standard plan review fee applies unless the project qualifies as a residential alteration override
65% of the building permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Rock Springs building department
~1–10 business days

How long did your EV Charging Station Permit (Electrical Permit) permit actually take in Rock Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical (if applicable)

    Conduit runs, wire sizing, disconnect placement before cover — City Electrical Inspector must be given 24 hours' notice before concealment (§ 150.33)

  2. 2

    Final — Electrical / Certificate of Inspection

    EVSE breaker sizing and connections verified; City Electrical Inspector issues certificate of inspection before energization (§ 150.33)

See the full Rock Springs inspection guide — scheduling & re-inspection fees →

Tips

  • Because Rock Springs runs its own City Electrical Inspector program (not the state program), EV charger electrical inspections are scheduled directly with the city — confirm timing with the Building Inspection Office at (307) 352-1540.
  • No dedicated EV charger fee line exists in the Municipal Code — expect the standard valuation-based building permit fee plus 65% plan review, based on installation cost, the same treatment this file's solar-pv-permit entry documents for solar.

Frequently asked questions

Rock Springs requires an ev charging station permit (electrical permit) for: A permit is required for the EV charger's electrical scope, covering the new/upgraded circuit and EVSE connection under the 2023 NEC (§ 150.04, Codes Adopted); Electrical scope requires City Electrical Inspector review/certificate of inspection before the system may be energized (§ 150.33); Fee is charged under the general § 150.08(B) valuation-based fee schedule based on installation cost, since no electrical-specific or EV-specific override exists in the Municipal Code; 24 hours' notice must be given to the City Electrical Inspector before concealment of new wiring (§ 150.33). If your project isn't listed, confirm with City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at (307) 352-1540 before starting work.

There is no separate EV charger fee line in the Municipal Code. Installations are charged under the general valuation-based fee schedule in § 150.08(B) based on installation cost, plus a 65% plan review fee — the same mechanism used for solar PV and other electrical work.

Plan review for an ev charging station permit (electrical permit) in Rock Springs typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at (307) 352-1540.

You'll need: Building Permit Application (electrical scope); Electrical Plan / Single-Line Diagram. See the required-documents checklist on this page for details on each.

Rock Springs requires 2 inspection(s) for an ev charging station permit (electrical permit), in order: Rough Electrical (if applicable), Final — Electrical / Certificate of Inspection. Schedule each through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) ((307) 352-1540).

Apply through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at 212 D Street, Rock Springs, WY 82901. Phone: (307) 352-1540, email: webmaster@rswy.net. Office hours: Mon–Fri, 8:00 a.m. to 5:00 p.m., closed 12:30–1:30 p.m. for lunch. Official information: https://www.rswy.net/departments/public_services/building_inspections_permits.php.

Rock Springs, Wyoming has adopted: 2024 International Building Code (IBC) — with local amendments; adopted per Rock Springs Municipal Code § 150.04, including Appendix E, Appendix I and Appendix J, excluding Chapter 27; 2024 International Residential Code (IRC) — with local amendments per § 150.04(D); including Appendix BF, Appendix B, Appendix C and Appendix CA; excluding R-309, P2904, and several Section R-403.3 subsections/tables/figures; 2024 International Existing Building Code (IEBC) — adopted per § 150.04; 2024 International Mechanical Code (IMC) — with local amendment per § 150.04(C); 2024 International Plumbing Code (IPC) — with local amendment per § 150.04(C); including Appendix D (Degree Day/Design Temperatures), Appendix E (Sizing of Water Pipe Systems) and Appendix C (Structural Safety); 2024 International Fuel Gas Code (IFGC) — including Appendix A, Appendix B and Appendix C; 2024 International Fire Code (IFC) — per City of Rock Springs Building Ordinances page; National Electrical Code, 2023 edition (NFPA) — adopted per § 150.04; enforced locally by the City Electrical Inspector under Rock Springs Municipal Code §§ 150.30–150.36 (city electrical code), NOT the Wyoming State Fire Marshal default program. Local amendments apply — see the Rock Springs overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rock Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.