EV Charging Station Permit (Electrical Permit) — Rock Springs, Wyoming · Requirements sheet
Verified 2026-07-20 · Source: https://www.rswy.net/departments/public_services/building_ordinances.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charging Station Permit (Electrical Permit) in Rock Springs, Wyoming
Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE in Rock Springs, processed as a standard electrical permit under the 2023 NEC (including Article 625, Electric Vehicle Power Transfer System) as adopted by the City. Rock Springs Municipal Code § 150.08(B) has no dedicated electrical-only fee line, let alone an EV-specific one — the same finding this file's electrical-permit and solar-pv-permit entries document — so an EV charger install is charged under the general valuation-based building-permit fee schedule, with electrical inspection performed by the City's own Electrical Inspector program (not the state).
Verified 2026-07-20 · Source
When you need this permit
- A permit is required for the EV charger's electrical scope, covering the new/upgraded circuit and EVSE connection under the 2023 NEC (§ 150.04, Codes Adopted)
- Electrical scope requires City Electrical Inspector review/certificate of inspection before the system may be energized (§ 150.33)
- Fee is charged under the general § 150.08(B) valuation-based fee schedule based on installation cost, since no electrical-specific or EV-specific override exists in the Municipal Code
- 24 hours' notice must be given to the City Electrical Inspector before concealment of new wiring (§ 150.33)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical (if applicable)
Conduit runs, wire sizing, disconnect placement before cover — City Electrical Inspector must be given 24 hours' notice before concealment (§ 150.33)
- 2
Final — Electrical / Certificate of Inspection
EVSE breaker sizing and connections verified; City Electrical Inspector issues certificate of inspection before energization (§ 150.33)
See the full Rock Springs inspection guide — scheduling & re-inspection fees →
Tips
- Because Rock Springs runs its own City Electrical Inspector program (not the state program), EV charger electrical inspections are scheduled directly with the city — confirm timing with the Building Inspection Office at (307) 352-1540.
- No dedicated EV charger fee line exists in the Municipal Code — expect the standard valuation-based building permit fee plus 65% plan review, based on installation cost, the same treatment this file's solar-pv-permit entry documents for solar.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rock Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Rock Springs
EV Charging Station Permit (Electrical Permit) in other cities
Compare ev charging station permit (electrical permit) fees across Wyoming →
Look up this fee in a different city →