Skip to main content
PermitBase

Roofing Permit (Reroof) in Rock Springs, Wyoming

Required for roof replacement (tear-off and reroof) on residential and commercial buildings in Rock Springs. Governed by the 2024 IBC/IRC as adopted by § 150.04. Residential reroofs are charged at 50% of the valuation table as a residential alteration; a Detail Sheet — Roof is available from the Building Inspection Office's Document Center.

Verified 2026-07-01 · Source

When you need this permit

  • Complete roof replacement (tear-off and reroof) requires a permit from the Building Official (§ 150.02(A)(1))
  • Roof design must meet the adopted 30 psf ground snow load requirement
  • Residential reroofing is treated as a residential alteration for fee purposes

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Residential reroof (treated as residential alteration)Rock Springs Municipal Code § 150.08(B)(3) covers 'residential alterations and additions' at 50% of the table; reroofing is a residential alteration for fee purposes since no dedicated reroof fee line exists
50% of the general valuation-based fee table in § 150.08(B); no plan review fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Rock Springs building department
~1–10 business days

How long did your Roofing Permit (Reroof) permit actually take in Rock Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Completed roof — verify flashing, drip edge, underlayment, installation quality

See the full Rock Springs inspection guide — scheduling & re-inspection fees →

Tips

  • Rock Springs' 30 psf minimum ground snow load applies to roof design and reroofing materials/attachment.
  • A Detail Sheet — Roof is available from the Building Inspection Office's Document Center to help applicants meet requirements.

Frequently asked questions

Yes. Reroofing requires a building permit. As a residential alteration, it is charged at 50% of the general valuation-based fee table per § 150.08(B)(3), with no separate plan review fee.

In Rock Springs, the published Residential reroof (treated as residential alteration) is: 50% of the general valuation-based fee table in § 150.08(B); no plan review fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a roofing permit (reroof) in Rock Springs typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at (307) 352-1540.

You'll need: Building Permit Application. Depending on your project, Rock Springs may also ask for: Detail Sheet — Roof. See the required-documents checklist on this page for details on each.

Rock Springs requires 1 inspection(s) for a roofing permit (reroof), in order: Final. Schedule each through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) ((307) 352-1540).

Apply through City of Rock Springs Public Services Department — Building Inspections & Permits (Chief Building Inspector) at 212 D Street, Rock Springs, WY 82901. Phone: (307) 352-1540, email: webmaster@rswy.net. Office hours: Mon–Fri, 8:00 a.m. to 5:00 p.m., closed 12:30–1:30 p.m. for lunch. Official information: https://www.rswy.net/departments/public_services/building_inspections_permits.php.

Rock Springs, Wyoming has adopted: 2024 International Building Code (IBC) — with local amendments; adopted per Rock Springs Municipal Code § 150.04, including Appendix E, Appendix I and Appendix J, excluding Chapter 27; 2024 International Residential Code (IRC) — with local amendments per § 150.04(D); including Appendix BF, Appendix B, Appendix C and Appendix CA; excluding R-309, P2904, and several Section R-403.3 subsections/tables/figures; 2024 International Existing Building Code (IEBC) — adopted per § 150.04; 2024 International Mechanical Code (IMC) — with local amendment per § 150.04(C); 2024 International Plumbing Code (IPC) — with local amendment per § 150.04(C); including Appendix D (Degree Day/Design Temperatures), Appendix E (Sizing of Water Pipe Systems) and Appendix C (Structural Safety); 2024 International Fuel Gas Code (IFGC) — including Appendix A, Appendix B and Appendix C; 2024 International Fire Code (IFC) — per City of Rock Springs Building Ordinances page; National Electrical Code, 2023 edition (NFPA) — adopted per § 150.04; enforced locally by the City Electrical Inspector under Rock Springs Municipal Code §§ 150.30–150.36 (city electrical code), NOT the Wyoming State Fire Marshal default program. Local amendments apply — see the Rock Springs overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rock Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.