Rock Springs building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Rock Springs, Wyoming.

Verified 2026-07-01 · Source

How to schedule

Inspections are requested through the building department below.

Address
212 D Street, Rock Springs, WY 82901
Phone
(307) 352-1540
Office hours
Mon–Fri, 8:00 a.m. to 5:00 p.m., closed 12:30–1:30 p.m. for lunch

Published scheduling rules

  • Because Rock Springs runs its own City Electrical Inspector program (not the state program), solar PV electrical inspections are scheduled directly with the city — confirm timing with the Building Inspection Office at (307) 352-1540. (Solar PV Permit)
  • Because Rock Springs runs its own City Electrical Inspector program (not the state program), EV charger electrical inspections are scheduled directly with the city — confirm timing with the Building Inspection Office at (307) 352-1540. (EV Charging Station Permit (Electrical Permit))

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Accessory dwellings must be on a permanent foundation per the § 157.008 definition; footings below 42-inch frost depth

  2. 2

    Framing

    Structural framing, matching roof pitch/siding/finish to the principal dwelling

  3. 3

    MEP Rough-In

    Mechanical, electrical (City Electrical Inspector), plumbing rough-in

  4. 4

    Final

    All work complete, ready for occupancy

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Foundation

    Per soils report recommendations; below 42-inch frost depth

  2. 2

    Framing / Structural

    Structural connections and fire separation assemblies verified

  3. 3

    MEP Rough-In

    Mechanical, electrical (City Electrical Inspector), plumbing rough-in

  4. 4

    Final / Certificate of Occupancy

    All work complete, ready for occupancy

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footing / Foundation (if new footings)

    Before concrete pour — below 42-inch frost depth

  2. 2

    Framing

    After framing complete, before insulation or wall cover

  3. 3

    MEP Rough-In

    Electrical, plumbing, mechanical rough-in before walls closed

  4. 4

    Final

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation / Footings

    Before concrete pour — footings must extend below the 42-inch minimum frost depth

  2. 2

    Framing

    After framing complete, before insulation or wall cover

  3. 3

    MEP Rough-In

    Mechanical, electrical, and plumbing rough-in before walls closed; electrical rough-in inspected by the City Electrical Inspector per § 150.33

  4. 4

    Final

    All work complete, ready for occupancy

Applies to: Change of Use / Certificate of Occupancy

  1. 1

    Fire Department Inspection (if required)

    May be required depending on the nature of the new business/use, per the city's Business & Development Applications guidance

  2. 2

    Wastewater Department Inspection (if required)

    May be required depending on the nature of the new business/use

  3. 3

    Building Final / Certificate of Occupancy (if improvements required)

    If Building-Code-mandated improvements are triggered by the occupancy change, a final inspection and Certificate of Occupancy under the adopted 2024 IBC Section 111 follow the standard building-permit inspection sequence

Applies to: Plumbing Permit

  1. 1

    Underground / Under-slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    All fixtures connected, no leaks, proper venting verified

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before cover — City Electrical Inspector must be given 24 hours' notice before concealment (§ 150.33)

  2. 2

    Final — Structural / Racking

    Panel mounting, racking attachment, roof penetration sealing verified

  3. 3

    Final — Electrical / Certificate of Inspection

    All connections and interconnection point verified; City Electrical Inspector issues certificate of inspection before energization (§ 150.33)

Applies to: Electrical Permit

  1. 1

    Rough-In (concealed wiring)

    Wiring to be concealed must be inspected before concealment; installer must give the City Electrical Inspector 24 hours' notice (§ 150.33)

  2. 2

    Final / Certificate of Inspection

    Electrical Inspector inspects within 24 hours of completion notice; issues a certificate of inspection authorizing connection to electrical service and energization (§ 150.33)

Applies to: EV Charging Station Permit (Electrical Permit)

  1. 1

    Rough Electrical (if applicable)

    Conduit runs, wire sizing, disconnect placement before cover — City Electrical Inspector must be given 24 hours' notice before concealment (§ 150.33)

  2. 2

    Final — Electrical / Certificate of Inspection

    EVSE breaker sizing and connections verified; City Electrical Inspector issues certificate of inspection before energization (§ 150.33)

Applies to: Fire Sprinkler & Fire Alarm System Permit

  1. 1

    Rough-In (Sprinkler Piping / Alarm Wiring)

    Piping, wiring, and device placement verified before concealment

  2. 2

    Final Acceptance Test

    Hydrostatic/flow test of the sprinkler system and functional test of the fire alarm system, witnessed by the RSFD Fire Inspector per the adopted 2024 IFC and referenced NFPA standards (NFPA 13, NFPA 72)

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In / Equipment

    Equipment installation and ductwork before walls closed

  2. 2

    Final

    Equipment operational, combustion air verified, venting correct

Re-inspection fees

Residential Building Permit (New Construction)Reinspection Fee · § 150.08(B), Other Inspections and Fees table, assessed under IBC Section 305.8
$100 per hour (or total hourly cost to the city, whichever is greater)

Rock Springs building permits

Get alerts for Rock Springs

We'll email you when Rock Springs's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.