Solar PV Permit in Riverton, Wyoming
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Riverton. Zoning treats a solar energy system as part of the building for height and lot-area purposes (RMC Chapter 17.24); construction is permitted under the standard building/electrical permit process.
Verified 2026-07-01 · Source
When you need this permit
- Solar panels and related installation equipment shall not exceed the height limitation for the applicable zoning district (RMC § 17.24.020.A)
- Solar energy system is considered part of the building and counts toward lot area/coverage limitations for the zoning district (RMC § 17.24.020.B)
- Electrical scope (interconnection wiring, inverter, disconnects) requires an electrical permit under RMC Chapter 15.08
- Structural evaluation of the roof/racking attachment recommended given Riverton's 30 psf ground snow load and 100 mph wind design speed (RMC § 15.04.040 local design criteria)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electric
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final
Racking/roof-penetration sealing and final electrical connections verified
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- Riverton's zoning code (RMC § 17.24.020) treats a solar array as part of the building for both height-limit and lot-coverage purposes — a large ground-mount array could count against your lot's maximum building coverage percentage (40% in R-2, for example).
- There is no separate solar-specific fee line in Resolution No. 1355 — budget for the standard alteration/electrical fee categories, or the new-construction per-square-foot rate if the array is part of new construction.
- Design for Riverton's local design criteria: 30 psf ground snow load, 100 mph basic wind speed, Seismic Design Category C — relevant to roof-mount racking structural calculations.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Riverton project checklist
Describe your project once and get every permit, document, and fee it triggers in Riverton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →