Small Wastewater (Septic) Permit in Unincorporated Uinta County, Wyoming
A Small Wastewater Permit is required for construction, installation, or modification of a small wastewater (septic) system in unincorporated Uinta County. Administered directly by Uinta County Planning & Zoning under the Uinta County Small Wastewater Regulations (amended December 2016), consistent with Wyoming's Environmental Quality Act framework for small wastewater systems.
Verified 2026-07-17 · Source
When you need this permit
- Required for construction, installation, or modification of any small wastewater (septic) system
- Systems must be installed by a licensed installer, OR the property owner may install their own system under guidance of the county's Small Wastewater Resolution and the Wastewater Engineer Owner-builder
- Process: (1) obtain the Small Wastewater Permit Application from Planning & Zoning; (2) conduct groundwater observation cut and percolation tests; (3) submit the septic permit application with design layout to Planning & Zoning; (4) obtain the county-issued Small Wastewater Permit to Construct; (5) install per approved design; (6) Planning & Zoning inspects the system BEFORE backfilling; (7) obtain the Small Wastewater Facility Permit with permission to backfill
- The county can require excavation/removal/rebuild of a non-compliant system found during inspection
- Issuance of a permit to construct does not relieve the permittee of responsibility for proper design, construction, operation, and maintenance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Backfill Inspection
Planning & Zoning Office inspects the installed system BEFORE backfilling occurs; a non-compliant system can be required to be unearthed, removed, or rebuilt
See the full Unincorporated Uinta County inspection guide — scheduling & re-inspection fees →
Tips
- This IS a genuine county-issued construction-related permit even though the county has no general building permit — septic/small wastewater is administered locally by Uinta County Planning & Zoning, not by the state.
- Do not backfill a septic system before the county inspection — the county requires a BEFORE-backfill inspection and can require you to unearth a non-compliant system.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uinta County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Uinta County
Small Wastewater (Septic) Permit in other cities
Compare small wastewater (septic) permit fees across Wyoming →
Look up this fee in a different city →