Inspection sequence, scheduling, and re-inspection fees for building permits in Fredonia, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
25 N Main St. / PO Box 217, Fredonia, AZ 86022
Phone
928-643-7241
Office hours
Monday - Thursday, 7:30 A.M. to 5:30 P.M. (Fax: 928-643-7627). Applications are submitted in person or by mail using the Town's paper Building Permit Packet (permit application, requirement checklist, soils test forms, owner/builder agreement, fee schedule and general information). Per Town Code § 151.06, the Building Inspector's administrative authority for all building, plumbing, electrical, and other inspections is vested in the Office of the Town Clerk; the Council may authorize additional persons to perform inspection work or other functions required by the chapter.

Published scheduling rules

  • Given Fredonia's remote location and smaller housing stock, manufactured home placement is common enough that the Town's standard packet has dedicated inspection line items (Lag; Jacks & Tie Downs) specifically for manufactured homes, alongside the standard site-built inspection sequence. (Manufactured Home Placement Permit)
  • OSFM inspection requests are submitted via OSFM's own online Inspection Request form; a re-inspection caused by a violation or a missed/cancelled scheduled inspection is billed at OSFM's own re-inspection fee rate before the re-inspection is conducted (Arizona Administrative Code R4-36-303(B), R4-36-202(A)(4)) (Fire Sprinkler / Fire Alarm System Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing & Set Back

    Footing reinforcement inspected before concrete pour; property setbacks verified against zoning requirements at this inspection

  2. 2

    Foundation

    Foundation wall reinforcement inspected before concrete pour; damp-proof coating checked at a later inspection

  3. 3

    Underground Plumbing

    Inspected before it is covered and the floor is poured

  4. 4

    Shear Wall & Sheeting

    Inspected before being covered by house wrap or other material

  5. 5

    4-Way (Framing, Rough Plumbing, Rough Electrical, Rough Mechanical, Rough Gas)

    Combined rough-in inspection of framing and all rough trade work

  6. 6

    Insulation

    Inspected before being covered by sheetrock or other material

  7. 7

    Drywall/Wallboard

    Rough drywall inspected before taping and applying drywall mud

  8. 8

    Vapor Barrier/House Wrap

    Inspected on the exterior before applying siding or other finishes

  9. 9

    Final Inspection

    Required before a Certificate of Occupancy (or temporary occupancy permit) is granted; no building may be occupied before this passes

Applies to: Manufactured Home Placement Permit

  1. 1

    Footing & Set Back

    Foundation pad/footing and setback verification

  2. 2

    Lag

    Inspects lag, both roof and wall, specific to manufactured homes

  3. 3

    Jacks & Tie Downs

    Inspects tie downs and jacks on manufactured homes

  4. 4

    Final Inspection

    Required before occupancy/Certificate of Occupancy

Applies to: Electrical Permit

  1. 1

    4-Way (includes Rough Electrical)

    Rough electrical inspected together with framing, rough plumbing, rough mechanical, and rough gas

  2. 2

    Meter Base

    If applicable

  3. 3

    Final Inspection

    Devices installed and verified per 2006 NEC before Certificate of Occupancy is granted

Applies to: EV Charger / EVSE Permit

  1. 1

    4-Way (includes Rough Electrical)

    Rough electrical for the EVSE circuit inspected together with framing, rough plumbing, rough mechanical, and rough gas, per the Town's standard combined inspection practice

  2. 2

    Meter Base

    If applicable

  3. 3

    Final Inspection

    EVSE circuit and connections verified per 2006 NEC before sign-off

Applies to: Fire Sprinkler / Fire Alarm System Permit

  1. 1

    OSFM Field Inspection (Fire Protection System)

    The holder of an OSFM operational or construction permit is entitled to inspections as prescribed in Arizona Administrative Code Title 4, Chapter 36; scheduled via OSFM's own online Inspection Request form

  2. 2

    OSFM Re-inspection (if required)

    Billed at OSFM's re-inspection fee rate if a scheduled inspection is missed/cancelled without 24 hours' notice, or if the site fails inspection

  3. 3

    Town of Fredonia Final Inspection

    Required under the parallel Town building permit before the structure may be occupied and a Certificate of Occupancy issued; does not substitute for OSFM's own fire-system inspection

Applies to: Plumbing Permit

  1. 1

    Underground Plumbing

    Inspected before it is covered and the floor is poured

  2. 2

    4-Way (includes Rough Plumbing)

    Rough plumbing inspected together with framing, rough electrical, rough mechanical, and rough gas

  3. 3

    Final Inspection

    Fixtures connected and verified before Certificate of Occupancy is granted

Applies to: Certificate of Occupancy / Change of Use

  1. 1

    Business Premises Inspection

    The Business License Application states that inspections of the premises are involved 'including, but not limited to: fire, building, zoning and safety,' though no dedicated inspection checklist or schedule distinct from these general categories was found published

  2. 2

    Final Inspection (if construction/alteration involved)

    Required under the general Building Permit before a Certificate of Occupancy is issued for any construction or alteration tied to the change of use

Applies to: Mechanical / HVAC Permit

  1. 1

    4-Way (includes Rough Mechanical)

    Rough mechanical inspected together with framing, rough plumbing, rough electrical, and rough gas

  2. 2

    Final Inspection

    Equipment operational and verified before Certificate of Occupancy is granted

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    4-Way (includes Rough Electrical)

    Rough electrical (PV interconnection wiring, disconnects) inspected together with framing, rough plumbing, rough mechanical, and rough gas, per the same combined-trade inspection sequence used for all building permits

  2. 2

    Final Inspection

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified per the 2006 NEC/IBC before Certificate of Occupancy or sign-off

Final inspection only: Sign Permit

Re-inspection fees

Fire Sprinkler / Fire Alarm System PermitOSFM Re-inspection Fee · Arizona Administrative Code R4-36-202(A)(4), charged when OSFM must re-inspect due to a missed/cancelled inspection (without 24 hours' notice) or a failed inspection.
$164 minimum, +$82 per each 25 miles (or portion) of travel beyond the first 25 miles required to reach the site

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fredonia building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Fredonia building permits

Get alerts for Fredonia

We'll email you when Fredonia's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.