Certificate of Occupancy / Change of Use — Fredonia, Arizona · Requirements sheet
Reviewed 2026-07-23 · Source: https://www.fredoniaaz.gov/files/1d7f37458/Business+License.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use in Fredonia, Arizona
The Town of Fredonia has no standalone 'Change of Use Permit' or 'Certificate of Occupancy Permit' application distinct from its general Building Permit and Business License processes. A Certificate of Occupancy for new construction is issued automatically upon passing the Final Inspection under the general Building Permit (already documented in this file's residential-building-permit entry) — there is no separate CO application form. For an existing building changing tenants, business type, or ownership, the Town's mechanism is its Business License Application (new business, renewal, name change, location change, or new owner of an existing business), which requires the applicant to certify that 'inspections of the premises are involved in this application including, but not limited to: fire, building, zoning and safety.' Separately, for any project that constitutes a 'Building Change of Use' or 'Occupancy Classification Change' as defined by the Arizona Office of the State Fire Marshal (OSFM), OSFM plan review is independently triggered because Fredonia has not adopted a local fire code (see this jurisdiction's fire-sprinkler-alarm-permit entry). This entry documents that honest composite picture rather than a single dedicated product, after an exhaustive search of the Building Permit Packet, Code of Ordinances Chapters 151 and 153, the Business License Application, the Town's Doing Business page, and OSFM's own program materials.
Reviewed 2026-07-23 · Source
When you need this permit
- No standalone Certificate of Occupancy or Change of Use application exists in Fredonia's Code of Ordinances (Chapter 151, Building Regulations, runs only to §§ 151.01-151.07; Chapter 153, Zoning, §§ 153.020-153.023 cover building permits, zone changes, conditional use permits, and plan review, with no dedicated CO or change-of-use section) — confirmed after reviewing the full text of every section in both chapters
- For new construction or alteration: a Certificate of Occupancy (or temporary occupancy permit) is issued only after the Final Inspection passes under the general Building Permit process; no building may be occupied before this (Town of Fredonia Building Permit Packet, pp. 9-10) — already documented in this file's residential-building-permit entry
- For a new business, business name change, business location change, or new ownership of an existing business in Fredonia: a Business License Application must be filed with the Town Office, which includes physical/mailing address, business classification, and a certification that inspections of the premises — 'including, but not limited to: fire, building, zoning and safety' — are involved in the application
- Business License fee schedule (published directly on the Business License Application form): Industrial $100; Commercial $50; Home Based $25
- If the change of use/occupancy also involves modifying or adding fire-protection systems, or constitutes a 'Building Change of Use' or 'Occupancy Classification Change' as OSFM defines it, the project must additionally be submitted to the Arizona Office of the State Fire Marshal for state fire-code compliance review, because Fredonia has not adopted a local fire code (OSFM Plan Review - Permitting and Inspection page; see this jurisdiction's fire-sprinkler-alarm-permit entry for OSFM's process, fees, and statutory timeline)
- No published processing-time figure for the Business License Application itself (as distinct from the building-permit or OSFM timelines already documented elsewhere in this file) was found on the Town's site, the Business License PDF, or the Doing Business page after an exhaustive search — this is a confirmed gap, not an omission
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Business Premises Inspection
The Business License Application states that inspections of the premises are involved 'including, but not limited to: fire, building, zoning and safety,' though no dedicated inspection checklist or schedule distinct from these general categories was found published
- 2
Final Inspection (if construction/alteration involved)
Required under the general Building Permit before a Certificate of Occupancy is issued for any construction or alteration tied to the change of use
See the full Fredonia inspection guide — scheduling & re-inspection fees →
Tips
- Do not go looking for a 'Change of Use Permit' or 'Certificate of Occupancy Permit' form on Fredonia's site — it does not exist as a standalone product. A CO for new construction rides on the general Building Permit's Final Inspection; a change in business use, tenant, or ownership rides on the Business License Application instead.
- If you are simply changing tenants/business type within an existing building with no construction, your main paperwork is the Business License Application (fee $25-$100 depending on classification) — budget for the fire/building/zoning/safety inspections it references, even though no separate itemized inspection fee is published.
- If your change of use involves any construction, remodeling, or new/modified fire-protection systems, you will also need the Town's Building Permit (for the structure) and very likely OSFM plan review (for the fire-code portion, since Fredonia has no local fire code) — see this jurisdiction's fire-sprinkler-alarm-permit entry.
- Given Fredonia's remote, paper-based process and the genuinely composite nature of this category, call the Town Office (928-643-7241) early in your project to confirm exactly which of these three tracks (building permit, business license, OSFM review) applies to your specific change of use.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fredonia building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fredonia
Certificate of Occupancy / Change of Use in other cities
Compare certificate of occupancy / change of use fees across Arizona →
Look up this fee in a different city →
Now live
Build your Fredonia project checklist
Describe your project once and get every permit, document, and fee it triggers in Fredonia — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →