El Mirage building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in El Mirage, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 10000 N El Mirage Road, El Mirage, AZ 85335-3607
- Phone
- 623-972-8116
- Office hours
- Monday - Friday, 8:00 a.m. to 4:30 p.m. (excluding holidays). As of January 2, 2024, all plans must be submitted electronically through the ELM Online Permits portal (ci-elmirage-az.smartgovcommunity.com); the Development Services main line is 623-876-2977, TDD 623-933-3258, Fax 623-876-4605.
- Website
- Official site
Inspection sequence
Applies to: Certificate of Occupancy / Change of Occupancy Permit (Commercial & Tenant Improvement)
- 1
Building Inspection Sign-Off
Final building inspection approval, required on every CO/Certificate of Completion variant
- 2
Engineering Inspection Sign-Off
Final civil/engineering approval; required on Commercial and Residential CO variants, not on the Tenant Improvement variant
- 3
Fire Inspection Sign-Off
Fire Marshal final approval; required on Commercial and Tenant Improvement CO variants, not on the Residential variant
- 4
Business License Sign-Off
Confirms an active City business license; required on Commercial and Tenant Improvement CO variants, not on the Residential variant
- 5
Planning Inspection Sign-Off
Zoning/site compliance approval; required on Commercial and Residential CO variants, not on the Tenant Improvement variant
Applies to: Residential Addition / Garage Conversion / Patio Enclosure Permit
- 1
Electrical, Plumbing and Mechanical Rough
Before walls are closed
- 2
Framing and Structural
Structural connections to existing structure
- 3
Plumbing Top Out
Plumbing stacks and vents verified before cover
- 4
Energy (Insulation)
Insulation verified before drywall
- 5
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction, Additions, Accessory Buildings)
- 1
Footings/Foundation
Before concrete pour
- 2
Electrical, Plumbing and Mechanical Rough
Before walls are closed
- 3
Framing and Structural
Structural framing and connections per 2018 IRC and City of El Mirage Design Criteria
- 4
Final / Certificate of Occupancy
All work complete per approved plans; Certificate of Occupancy issued ($100/house residential)
Applies to: Commercial Sign Permit (Wall, Monument/Pylon, Awning, Temporary Banner)
- 1
Footing (freestanding/monument signs only)
Before concrete pour, for freestanding or monument sign foundations
- 2
Electrical (illuminated signs only)
Wiring and connections verified before energizing an illuminated sign
- 3
Final
Completed sign verified against the approved sign permit and Chapter 154 standards
Applies to: Fence and Retaining Wall Permit
- 1
Footings
Before concrete pour, for fences and retaining walls
- 2
Pilasters (masonry only)
For masonry/block fences
- 3
Final
Completed fence/wall verified against approved plans
Applies to: Fire Sprinkler System & Fire Alarm System Permit
- 1
Rough (underground/concealed piping or wiring)
Sprinkler underground/rough piping or fire alarm rough wiring verified before concealment
- 2
Hydrostatic Test / Device Test
Sprinkler system hydrostatic pressure test, or fire alarm device/panel functional test, witnessed by the Fire Marshal or designee
- 3
Final Acceptance
Fire Marshal final acceptance test/sign-off; Sprinklered and Alarm status (Yes/No) recorded on the Certificate of Occupancy Sign-Off Sheet
Applies to: Swimming Pool / Spa Permit
- 1
Pre-Gunite
Excavation, steel/rebar, and plumbing verified before shotcrete/gunite application — see Pool Inspections Checklist
- 2
Pre-Plaster
Verified before interior finish is applied — see Pool Inspections Checklist
- 3
Final
Barrier/fencing compliance and equipment verified
Applies to: Demolition Permit
- 1
Pre-demolition
Verifies utilities have been located
- 2
Final
Verifies all building components have been removed, including footings and trash/debris
Applies to: Electrical Permit (Panel Replacement/Repair)
- 1
Electrical Rough (with new construction)
Wiring and panel connections before walls are closed, if applicable
- 2
Clearance or Final
Panel labeled, connections verified per 2017 NEC as amended
Applies to: EV Charger / EVSE Permit (Billed as General Electrical Permit)
- 1
Electrical Rough (if concealed wiring)
Charger circuit wiring before concealment, if applicable
- 2
Clearance or Final
EVSE installed, GFCI/disconnect and connections verified per 2017 NEC Article 625 as amended
Applies to: Heating & Air Conditioning Repair or Replacement Permit
- 1
Rough Mechanical/Electric
Ductwork, equipment placement, and electrical connections before cover
- 2
Final
Equipment operational, clearances, condensate disposal, and combustion air verified
Applies to: Residential Solar Photovoltaic (PV) System Permit
- 1
Electrical Clearance/Derate (if applicable)
Main panel de-rate verification before energizing, if applicable
- 2
Final
Equipment installation, grounding and bonding, warning signage, and electrical clearance verified
Applies to: Water Heater / Water Supply Line / Sewer Line Permit
- 1
Rough Plumbing
Before cover, for sewer line and water supply line work
- 2
Final
Water heater connections, relief valve discharge, and expansion tank verified; sewer/water line final
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the El Mirage building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
El Mirage building permits
Get alerts for El Mirage
We'll email you when El Mirage's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.