Demolition Permit — El Mirage, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.elmirageaz.gov/291/Residential-Property-Improvements
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in El Mirage, Arizona
Required for demolition of any building or structure larger than 120 sq ft in the City of El Mirage. Requires coordination with Maricopa County Air Quality (asbestos/dust control) and Arizona 811 utility locating prior to work.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for demolition of any building or structure larger than 120 sq ft
- Site Plan required showing street address, lot number, parcel number, all lot dimensions/property lines, adjacent streets labeled, structures to be demolished vs. retained clearly marked, dumpster and construction fence location, and the location of all gas/water meters, sewer lines, and underground electrical lines
- A haul permit is required for debris in excess of 500 cubic yards (contact El Mirage Engineering)
- Commercial demolitions require proof of ownership; all permits for commercial, tenant improvement, residential, and factory-built structures shall include required ownership documentation
- Disturbed areas larger than 1/10 acre (4,356 sq ft) must comply with Maricopa County dust control requirements
- Contractor information required: property owner may act as their own contractor only if the property is not a rental
- Notice must be given to adjacent property owners ten days prior to work (exceptions apply)
- Construction fencing 42 inches in height required to protect the site and public during demolition
- A temporary site address sign visible from the street must be posted
- Arizona 811 must be contacted to locate utilities prior to any digging or utility disconnection
- All utilities must be terminated/located at the property line before demolition begins
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-demolition
Verifies utilities have been located
- 2
Final
Verifies all building components have been removed, including footings and trash/debris
See the full El Mirage inspection guide — scheduling & re-inspection fees →
Tips
- Demolition permits in El Mirage generally run M-Th 7 a.m.-5:30 p.m. (closed Fridays) per the City's published office hours specific to Demolitions, which differ from the standard 8-4:30 M-F Building Safety hours — confirm current hours before scheduling.
- Debris in excess of 500 cubic yards requires a separate haul permit from El Mirage Engineering.
- Disturbed areas over 1/10 acre must comply with Maricopa County dust control rules — see the City's Dust Control Pamphlet.
- Ten days' notice to adjacent property owners is required before demolition begins, with limited exceptions.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the El Mirage building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in El Mirage
Demolition Permit in other cities
Compare demolition permit fees across Arizona →
Look up this fee in a different city →