Fence and Retaining Wall Permit in El Mirage, Arizona

Unlike many peer Arizona cities, the City of El Mirage requires a permit for a fence of ANY type or height, and for retaining walls over 24 inches — the standard IBC/IRC no-permit exemptions for shorter fences and lower retaining walls were expressly struck out by City of El Mirage local amendment.

Verified 2026-07-06 · Source

When you need this permit

  • A permit is required for the construction of a new fence or replacement fence made of ANY type of material — El Mirage's amendment to IBC/IRC 105.2 deletes the base code's exemption for fences not over 7 feet high
  • A permit is required for retaining walls over 24 inches (2 feet) in height — El Mirage's amendment deletes the base code's exemption for retaining walls not over 4 feet high, imposing a stricter, lower 24-inch threshold
  • Retaining walls 24 to 48 inches in height require plans showing how the wall and footings will be constructed; walls 4 feet (48 inches) or more require an engineered design with sealed, signed structural calculations
  • Site Plan with dimensions indicating fence/wall location and length required; a Neighboring Property Owner Authorization Form (notarized/completed by the adjoining property owner) is required for fences
  • Fees for fences are based on the valuation of the linear feet of the project; fees for retaining walls are based on valuation; a non-refundable $150.00 application fee applies to both

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fence (Based on Value, per linear feet)City of El Mirage FY25-26 Adopted Fee Schedule; City's Residential Property Improvements page confirms 'Fees are based on the valuation of the linear feet of the project'
Valuation-based, see FY25-26 Adopted Fee Schedule BOV table
Retaining Wall (Based on Value)City of El Mirage FY25-26 Adopted Fee Schedule, Building Safety section
$75 flat (valuation $1,000 or less); $100 + $6/$1,000 of valuation ($1,001-$999,999); $100 + $5/$1,000 of valuation ($1,000,000+)
Permit Application DepositCity of El Mirage FY25-26 Adopted Fee Schedule, Building Safety section
$150, non-refundable, due at submittal

Review timeline

Plan reviewEl Mirage’s published plan-review target
10–15 business days

How long did your Fence and Retaining Wall Permit permit actually take in El Mirage?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Before concrete pour, for fences and retaining walls

  2. 2

    Pilasters (masonry only)

    For masonry/block fences

  3. 3

    Final

    Completed fence/wall verified against approved plans

See the full El Mirage inspection guide — scheduling & re-inspection fees →

Tips

  • El Mirage is STRICTER than the unamended IBC/IRC on both fences and retaining walls: the base code's standard exemptions (fences <=7 ft, retaining walls <=4 ft) were expressly deleted by City amendment — a permit is required for a fence of any height/material and for a retaining wall over 24 inches.
  • A notarized Neighboring Property Owner Authorization Form (completed by the adjoining property owner) is required for fence permits.
  • Retaining walls 4 feet or taller, or walls deemed structurally bearing, require an engineer-sealed design and typically a more involved inspection process.

Frequently asked questions

Yes — unlike many nearby cities, El Mirage requires a permit for the construction of a new or replacement fence of any type of material, with no height-based exemption. A Site Plan and a notarized Neighboring Property Owner Authorization Form are required.

In El Mirage, the published Fence (Based on Value, per linear feet) is: Valuation-based, see FY25-26 Adopted Fee Schedule BOV table. Additional published fees: Retaining Wall (Based on Value) — $75 flat (valuation $1,000 or less); $100 + $6/$1,000 of valuation ($1,001-$999,999); $100 + $5/$1,000 of valuation ($1,000,000+); Permit Application Deposit — $150, non-refundable, due at submittal. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

El Mirage's published plan-review target for a fence and retaining wall permit is 10–15 business days.

You'll need: Building Permit Application (ELM Online Permits); Neighboring Property Owner Authorization Form; Site Plan. Depending on your project, El Mirage may also ask for: Block Wall Masonry Fence Handout. See the required-documents checklist on this page for details on each.

El Mirage requires 3 inspection(s) for a fence and retaining wall permit, in order: Footings, Pilasters (masonry only), Final. Schedule each through City of El Mirage Development Services Department — Building Safety / Permit Center (623-972-8116).

Apply through City of El Mirage Development Services Department — Building Safety / Permit Center at 10000 N El Mirage Road, El Mirage, AZ 85335-3607. Phone: 623-972-8116, email: bgomez@elmirageaz.gov. Office hours: Monday - Friday, 8:00 a.m. to 4:30 p.m. (excluding holidays). As of January 2, 2024, all plans must be submitted electronically through the ELM Online Permits portal (ci-elmirage-az.smartgovcommunity.com); the Development Services main line is 623-876-2977, TDD 623-933-3258, Fax 623-876-4605.. Official information: https://www.elmirageaz.gov/712/Permit-Center.

El Mirage, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of El Mirage runs its own Development Services / Building Safety Department and independently adopts and administers its own construction codes. Source: City of El Mirage Resolution R23-05-10 (adopted May 16, 2023) and City of El Mirage Permit Center page (elmirageaz.gov/712/Permit-Center).; 2018 International Building Code (IBC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10 (A Resolution of the Mayor and Council of the City of El Mirage, Arizona, Adopting the Following 2018 International Codes...), passed and adopted May 16, 2023, effective July 1, 2023. Source: City of El Mirage Resolution R23-05-10 and 'Adopted Codes and Amendments' (PDF), City of El Mirage Building Safety Documents & Quick Links page.; 2018 International Residential Code (IRC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Local IRC amendments include mandatory heating AND cooling (Section R303.10, capable of maintaining between 68-70°F and 90°F at 3 ft above floor / 2 ft from exterior walls), deletion of R313 Automatic Fire Sprinkler Systems in its entirety, and Section R301.2 Climatic and Geographic Design Criteria per Table R301.2(1). Source: Resolution R23-05-10, Exhibit — City of El Mirage Amendments to the 2018 International Residential Code.; 2018 International Fire Code (IFC), adopted by reference with City of El Mirage local amendments (including Appendix B minimum fire flow amendment, deletion of Appendix M High-Rise retroactive sprinkler requirement, and addition of Appendix O Fire Emergency Access Signage Details), per Resolution R23-05-10, effective July 1, 2023; administered by the El Mirage/Surprise/Youngtown regional Fire Department (El Mirage Fire-Medical Department). Source: Resolution R23-05-10, Exhibit — City of El Mirage Amendments to the 2018 International Fire Code.; 2018 International Mechanical Code (IMC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Source: Resolution R23-05-10.; 2018 International Plumbing Code (IPC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Source: Resolution R23-05-10.; 2018 International Fuel Gas Code (IFGC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Source: Resolution R23-05-10.; 2018 International Existing Building Code (IEBC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Source: Resolution R23-05-10.; 2018 International Energy Conservation Code (IECC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023 — regulates energy efficiency in design/construction; the code's Chapter 11 residential energy provisions are folded into the IRC (N1101 et seq.) as adopted. Source: Resolution R23-05-10.; 2018 International Green Construction Code (IGCC), adopted by reference with City of El Mirage local amendments, per Resolution R23-05-10, effective July 1, 2023. Source: Resolution R23-05-10.; 2018 International Property Maintenance Code (IPMC), adopted by reference, per Resolution R23-05-10, effective July 1, 2023 — violations may be prosecuted as a civil infraction (fine $50-$1,000 per violation) or a class 1 misdemeanor (up to 180 days imprisonment and/or a fine up to $2,500 per violation, up to $20,000 if the violator is an enterprise). Source: Resolution R23-05-10.; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities, adopted by reference, per Resolution R23-05-10, effective July 1, 2023, together with the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8) and the federal ADA. Source: Resolution R23-05-10.; 2017 National Electrical Code (NEC), adopted by reference with City of El Mirage local amendments (e.g., an amendment to NEC Article E3908.8 Option Four — electrical metallic tubing wiring methods, requiring an additional equipment grounding conductor sized per Table E3908.12), per Resolution R23-05-10, effective July 1, 2023 (note: electrical code cycle is one edition behind the 2018 ICC set). Source: Resolution R23-05-10, Exhibit — City of El Mirage Amendments to the 2017 National Electrical Code.; Manufactured housing used as dwellings and private sewage disposal systems are governed directly by the Arizona Department of Housing's Manufactured Housing & Building Division regulations — IRC Appendix E (Manufactured Housing Used as Dwellings) and Appendix I (Private Sewage Disposal) are each deleted in their entirety by City of El Mirage local amendment and replaced with a cross-reference to the state agency's regulations. Source: Resolution R23-05-10, Exhibit — City of El Mirage Amendments to the 2018 International Residential Code, Appendices E and I.. Local amendments apply — see the El Mirage overview page for the full list.

A permit is required for retaining walls over 24 inches (2 feet) in height. Walls 24-48 inches require construction plans; walls 4 feet or taller require an engineer-sealed structural design.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the El Mirage building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.