Sign Permit in Unincorporated Santa Cruz County, Arizona

A building permit from the Building Inspector is required to erect, structurally repair, relocate, or alter the size of any sign in the unincorporated areas of Santa Cruz County, under Article 17 (Sign Regulations) of the Santa Cruz County Zoning and Development Code. The county publishes a dedicated Sign Application (Community Development Department — Planning & Building, revised 10/09/2025) separate from the general Building/Grading Permit Application. Repainting or minor repair of the sign surface only does not require a permit, and Section 1707 exempts several classes of small, temporary, and non-commercial signs.

Reviewed 2026-07-23 · Source

When you need this permit

  • Zoning and Development Code Sec. 1702: it is unlawful to erect, structurally repair, relocate, or alter the size of any sign without first obtaining a Building Permit from the Building Inspector; all illuminated signs are additionally subject to all provisions of the Electrical Code
  • Sec. 1703 requires, in addition to the ordinary building-permit information: the position of the sign in relation to nearby buildings or structures; two blueprints of plans and specifications including method of construction and attachment to the building or ground; structural calculations proving the sign is designed for wind pressures per the Code; the name of the person, firm, or corporation erecting the structure; written consent of the owner of the building, structure, or premises; and approval of all proposed wiring and connections of illuminated signs in compliance with the Electrical Code
  • County Sign Application package (revised 10/09/2025) requires: the completed application form including the Certification and Acknowledgement pages, signed by the property owner (or a letter of authorization from the owner for an agent); a County Assessor's Office Property Profile; a site plan showing the location of any free standing sign (property boundaries, proposed and existing structures, setbacks from property lines, on paper no smaller than 11" x 17"); wall elevations to scale showing sign mount location and dimensions; a graphic of the sign showing dimensions and square footage of each sign; a Flood Hazard Information Sheet; two copies of the sign plans in color; and the contractor's ROC number Contractor
  • Application asks for number of wall signs, number of free standing signs, square footage of each sign (up to five listed plus a total), and type of illumination
  • General and electrical contractor names, phone numbers and ROC numbers must be listed on the application Contractor
  • No permit is required for the repainting of, or minor repair to, the sign surface only (Sec. 1702)
  • Sec. 1707 permit exemptions include: signs not exceeding 1 sq ft bearing only property/post box numbers, occupant names or other identification; professional name plates not exceeding 2 sq ft; on-site traffic/parking direction signs bearing no advertising, up to 3 sq ft; traffic and other county/emergency/governmental signs and legal notices; memorial signs, building names and dates of erection cut into masonry or made of bronze or other non-combustible material, up to 8 sq ft; real estate signs up to 4 sq ft in residential districts and up to 12 sq ft in commercial and industrial districts; up to three off-premises 'open house' direction signs up to 6 sq ft each, not in the public right-of-way and with the written approval of the property owner, for no longer than two years after issuance of the building permits for the project advertised; one temporary non-illuminated major-project construction sign up to 36 sq ft, removed prior to issuance of the certificate of occupancy; temporary political signs up to 36 sq ft within the statutory campaign window; one non-illuminated home-occupation name plate up to 3 sq ft; and temporary grand-opening signs up to 36 sq ft for a maximum of 14 calendar days
  • Sec. 1704: if the work authorized by a sign building permit has not been completed within six (6) months, the permit becomes null and void
  • Sec. 1715: a change in the type of business requires ALL signs on the site to be brought into conformance with the Code, and a Building Permit for any new sign will not be issued until all non-conforming signs owned by the business are brought into compliance
  • Commercial and other non-single-family projects reviewed through the Technical Advisory Committee must include a Sign Plan (including illumination) per Article 17 in the TAC Development Plan submittal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Sign permit feeZoning and Development Code Sec. 1702 makes a sign permit a Building Permit issued by the Building Inspector, so the county's ordinance-adopted building fee structure applies — Ordinance No. 2013-03, Section 10 adopts Table 1-A (Exhibit A), Table A-33-B (Exhibit B), and the ICC Building Valuation Data Table as the Santa Cruz County Building Department fee schedule (read from a page render of the recorded ordinance, page 13 of 15). No sign-specific fee line appears anywhere in that schedule, in the Guidelines for Builders (Rev. 03/2014), or in the Sign Application itself, whose only fee reference is a blank FOR OFFICE USE ONLY 'FEES:' box. Article 30 (Planning and Zoning Fees) of the Zoning and Development Code was rescinded effective January 10, 2003 (Case #02-08), so the Code carries no fee table either. No amount is asserted; confirm with the Building Department at 520-375-7880.
Not published as a distinct line item
Plan Review FeeGuidelines for Builders (Rev. 03/2014), Section 4, and Ordinance No. 2013-03 Section 10 (recorded 2013-05317, page 14 of 15, read from render). Due at time of application submittal; non-refundable. Which rate applies to a sign permit is not stated in either document.
35% of the Building Permit Fee for one- and two-family dwellings and accessory structures; 50% of the Building Permit Fee for all other project types
Zoning Clearance FeeGuidelines for Builders (Rev. 03/2014), Section 5 and Exhibit A: applies to all permits containing a site plan. The county's Sign Application requires a site plan for any free standing sign, so this fee is expected on a free-standing sign application; neither document names sign permits explicitly, so treat it as expected rather than confirmed.
$50.00 flat
Work commenced before a permit is obtainedOrdinance No. 2013-03, Section 10 (page 14 of 15, read from render): 'when any work requiring a permit commences before a permit has been obtained a double permit fee will be due.'
Double permit fee

Review timeline

Plan reviewUnincorporated Santa Cruz County’s published plan-review target
15–150 business days

How long did your Sign Permit permit actually take in Unincorporated Santa Cruz County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing / Foundation (free standing signs)

    Footing and anchoring inspected before concrete pour against the approved plans and the wind-pressure structural calculations required by Sec. 1703, under the 2012 IBC as adopted

  2. 2

    Electrical (illuminated signs)

    Wiring and connections for illuminated signs inspected for compliance with the Electrical Code (2011 NEC as adopted), per Sec. 1702 and Sec. 1703(F)

  3. 3

    Final

    Sign erected per approved plans and Article 17 dimensional standards for the applicable zoning district; permit is void if work is not completed within six months of issuance (Sec. 1704)

See the full Unincorporated Santa Cruz County inspection guide — scheduling & re-inspection fees →

Tips

  • Repainting or minor repair to the sign surface alone does not need a permit — but any change in size, structural change, relocation, or structural repair does (Sec. 1702).
  • Changing the type of business on a site is a trap: Sec. 1715 requires ALL signs on the site to be brought into conformance with the current Code when the business type changes, and the county will not issue a Building Permit for a new sign until every non-conforming sign the business owns is compliant.
  • The Sign Application is a separate form from the Building/Grading Permit Application and has its own checklist — plan for a Flood Hazard Information Sheet, an Assessor's Property Profile, two color copies of the sign plans, and the contractor's ROC number, none of which are obvious from the general building permit checklist. Contractor
  • Structural wind-load calculations are mandatory under Sec. 1703(C) for every sign permit, not just large ones — budget for an engineer's calculations before applying.
  • A sign building permit goes void if the work is not completed within six months of issuance (Sec. 1704), which is shorter than the general permit windows elsewhere in this corpus.

Frequently asked questions

Yes. Section 1702 of the Santa Cruz County Zoning and Development Code makes it unlawful to erect, structurally repair, relocate, or alter the size of any sign without first obtaining a Building Permit from the Building Inspector. Repainting or minor repair of the sign surface only is exempt, as are the classes of small, temporary, real-estate, political and identification signs listed in Section 1707. Source: Santa Cruz County Zoning and Development Code, Article 17 (https://www.santacruzcountyaz.gov/DocumentCenter/View/9059/Santa-Cruz-County-Zoning-and-Development-Code)

In Unincorporated Santa Cruz County, the published Sign permit fee is: Not published as a distinct line item. Additional published fees: Plan Review Fee — 35% of the Building Permit Fee for one- and two-family dwellings and accessory structures; 50% of the Building Permit Fee for all other project types; Zoning Clearance Fee — $50.00 flat; Work commenced before a permit is obtained — Double permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Santa Cruz County's published plan-review target for a sign permit is 15–150 business days.

You'll need: Sign Application; Certification and Acknowledgement; County Assessor's Office Property Profile; Flood Hazard Information Sheet; Sign plans (two copies, in color) and structural wind-load calculations. See the required-documents checklist on this page for details on each.

Unincorporated Santa Cruz County requires 3 inspection(s) for a sign permit, in order: Footing / Foundation (free standing signs), Electrical (illuminated signs), Final. Schedule each through Santa Cruz County Building Department (a division of the Community Development Department, Planning & Building) (520-375-7880).

Apply through Santa Cruz County Building Department (a division of the Community Development Department, Planning & Building) at 2150 N. Congress Drive, Suite #206, Nogales, AZ 85621. Phone: 520-375-7880, email: permitting@santacruzcountyaz.gov. Office hours: Monday–Thursday, 7:00 AM – 6:00 PM. Due to the time required to accept or issue a building permit, no applications are accepted and no permits are issued after 5:00 PM. Source: Santa Cruz County Building Department page (live, browser-header fetch confirmed 2026-07-07) and Guidelines for Builders (Rev. 03/2014).. Official information: https://www.santacruzcountyaz.gov/440/Building-Department.

Unincorporated Santa Cruz County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority. Santa Cruz County independently adopts and administers its own construction codes for unincorporated areas through its Building Department (a division of Community Development). Source: Santa Cruz County Building Department page.; 2012 International Building Code (IBC), effective for all construction in the unincorporated areas of the County on September 1, 2013, per Ordinance No. 2013-03 (including all amendments). Source: Santa Cruz County Building Department page (live) and 'Guidelines for Builders' (Rev. 03/2014), https://www.santacruzcountyaz.gov/DocumentCenter/View/973/Guidelines-for-Builders.; 2012 International Building Code Standards, adopted alongside the 2012 IBC per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014).; 2012 International Residential Code (IRC), adopted per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014).; 2012 International Mechanical Code (IMC), adopted per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014).; 2012 International Plumbing Code (IPC), adopted per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014).; 2012 International Fire Code (IFC), adopted per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014).; 2011 National Electrical Code (NEC) — one edition behind the 2012 I-Codes, consistent with typical NEC adoption lag; adopted per Ordinance No. 2013-03. Source: Guidelines for Builders (Rev. 03/2014). Independently corroborated by the 2018 Arizona Building Officials (AZBO) Directory, which lists Santa Cruz County as having adopted the 2012 IBC/IRC/IMC/IPC/IFC and 2011 NEC (https://www.azbo.us/documents/documents/2018_AZBO_Directory.pdf).; Santa Cruz County has also adopted a Zoning and Development Code (separate from the building-safety codes above) regulating zoning matters, setbacks, landscaping requirements, and swimming pools, administered by the Community Development Department's Planning & Zoning division. Source: Guidelines for Builders (Rev. 03/2014); Santa Cruz County Zoning and Development Code, https://www.santacruzcountyaz.gov/DocumentCenter/View/9059/Santa-Cruz-County-Zoning-and-Development-Code.; A subsequent Building Safety Code Ordinance and an Excavation and Grading Ordinance are both currently published and linked directly from the Building Department page (Building Safety Code Ordinance: https://www.santacruzcountyaz.gov/DocumentCenter/View/970/Building-Safety-Code-Ordinance; Excavation and Grading Ordinance: https://www.santacruzcountyaz.gov/DocumentCenter/View/972/Excavation-and-Grading-Ordinance), confirming the Building Department's code set is still active and in force as of this review. The Building Safety Code Ordinance PDF (970) is a large scanned image file that could not be machine-OCR'd during this review — a genuine access limitation, not an unpublished-code gap, since its existence, title, and the underlying 2012 I-Code adoption are independently confirmed by the live department page and the Guidelines for Builders document.; Grading permits are required in unincorporated Santa Cruz County for any grading exceeding 50 cubic yards, per Santa Cruz County Ordinance Nos. 2001-06 & 2007-05. A grading permit is issued only in conjunction with a building permit (with narrow exceptions for grading under Planning & Zoning jurisdiction or special cases approved by the Building Official). Source: Guidelines for Builders (Rev. 03/2014).. Local amendments apply — see the Unincorporated Santa Cruz County overview page for the full list.

The county's Sign Application (revised 10/09/2025) requires the completed form including the Certification and Acknowledgement pages with the owner's signature or a letter of authorization, an Assessor's Property Profile, a site plan showing the location of any free standing sign on paper no smaller than 11" x 17", scaled wall elevations showing sign mount location and dimensions, a graphic of the sign showing dimensions and square footage, a Flood Hazard Information Sheet, two copies of the sign plans in color, and the contractor's ROC. Section 1703 of the Zoning and Development Code additionally requires two blueprints of plans and specifications and structural calculations proving the sign is designed for Code wind pressures. Source: https://www.santacruzcountyaz.gov/DocumentCenter/View/16338/Sign-Application

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Santa Cruz County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.