Dewey-Humboldt building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Dewey-Humboldt, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
2735 South Highway 69, Suite 12, Humboldt, AZ 86329 (Mailing: P.O. Box 69, Humboldt, AZ 86329)
Phone
928-632-7362
Office hours
Building Safety is a division of the Community Development Department (fax 928-632-7365). The Town runs its own independent Building Safety Division — it does NOT contract building-permit administration to Yavapai County — with a named Building Official (Marty Joanou) and Permit Tech (Rio Cochran). Applicants are directed to call ahead ('Please call us about your project at 928-632-7362. Our Building Inspector will be happy to discuss your project in advance so that all information needed is included on the appropriate forms.'). The Town's process is paper/PDF-form based (fillable permit packets from the Document Center dropped off or mailed in) — no CloudPermit/EnerGov-type online portal was found. A septic permit approved by Yavapai County (separate agency, on-site wastewater) is required BEFORE the Town will begin reviewing building plans; Yavapai County septic review may add 4-6 weeks during peak season per the Town's own FAQ.

Published scheduling rules

  • 24-hour advance notice is required to schedule a CAFMA inspection (more may be required for large/complex systems); the Fire Code Official will not approve occupancy until fire-protection requirements are verified complete, and CAFMA separately inspects for Fire Code compliance whenever the Town's Building Official is preparing to issue a temporary or permanent Certificate of Occupancy (Fire Sprinkler System Permit (via Central Arizona Fire and Medical Authority))
  • 24-hour advance notice is required to schedule a CAFMA inspection; system monitoring and supervision requirements apply per CAFMA's adopted fire-alarm standards (Fire Alarm System Permit (via Central Arizona Fire and Medical Authority))

Inspection sequence

Applies to: Building Permit (New Construction, incl. Single-Family Residence, ADU, Garage/Carport, Room Addition, Manufactured Home)

  1. 1

    Foundation/Footing

    Before concrete pour; verifies footing reinforcement per § 150.03 amendment to IRC R403.1

  2. 2

    Framing

    Structural framing, connections, egress per 2018 IRC and Town Design Criteria

  3. 3

    Final

    All work complete per approved plans; 24-hour notice required to schedule; field plans and inspection card must be present on-site

Applies to: EV Charger / EVSE Permit (via Over-the-Counter Electrical Permit)

  1. 1

    Rough-In

    Wiring/conduit installed before concealment, if applicable

  2. 2

    Final

    Charger circuit/unit installed, breaker sized correctly, energized; 24-hour notice required to schedule

Applies to: Fire Alarm System Permit (via Central Arizona Fire and Medical Authority)

  1. 1

    Rough-In

    Wiring, device placement, and conduit runs inspected before concealment; 24-hour notice required to CAFMA

  2. 2

    Final / Acceptance Test

    Full system functional and monitoring-connection test witnessed by the CAFMA Fire Code Official before occupancy sign-off; failed inspections, failure to install per plans, or failure to pretest each carry a $125 reinspection fee

Applies to: Fire Sprinkler System Permit (via Central Arizona Fire and Medical Authority)

  1. 1

    Rough-In / Underground

    Sprinkler piping and connections inspected before concealment; 24-hour notice required to CAFMA

  2. 2

    Final / Acceptance Test

    Hydrostatic and flow testing of the completed system witnessed by the CAFMA Fire Code Official before occupancy sign-off; failed inspections, failure to install per plans, or failure to pretest each carry a $125 reinspection fee

Applies to: Grading Permit

  1. 1

    Grading/Site

    Verifies cut/fill amounts, drainage, and slope against approved site plan

  2. 2

    Final

    Site work complete per approved plan; 24-hour notice required

Applies to: Over-the-Counter (OTC) Permit — Electrical, Plumbing, Mechanical, Demolition

  1. 1

    Rough-In

    Applicable trade rough-in (wiring, piping, ductwork) before it is concealed

  2. 2

    Final

    Completed work verified; 24-hour notice required to schedule

Applies to: Solar Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel/racking mounting, roof penetration sealing, electrical connections, and interconnection point verified; 24-hour notice required

Final inspection only: Change of Use

Re-inspection fees

Fire Sprinkler System Permit (via Central Arizona Fire and Medical Authority)Plan Review Resubmittal / Multi-Story Building Inspection / Reinspection fees · CAFMA Fee Schedule, 'Miscellaneous Fees' table; visually verified against the rendered PDF page
Plan Review Resubmittal $108 per submittal; Multi-Story Building Inspection (Fire Sprinklers and Fire Alarm) $125 per floor above 2 floors, in addition to the installation permit fee; Reinspection (failed, failure to install per plans, failure to pretest, no-show, or not otherwise specified) $125 per inspection
Fire Alarm System Permit (via Central Arizona Fire and Medical Authority)Plan Review Resubmittal / Multi-Story Building Inspection / Reinspection fees · CAFMA Fee Schedule, 'Miscellaneous Fees' table; visually verified against the rendered PDF page
Plan Review Resubmittal $108 per submittal; Multi-Story Building Inspection (Fire Sprinklers and Fire Alarm) $125 per floor above 2 floors, in addition to the installation permit fee; Reinspection (failed, failure to install per plans, failure to pretest, no-show, or not otherwise specified) $125 per inspection

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Dewey-Humboldt building permits

Get alerts for Dewey-Humboldt

We'll email you when Dewey-Humboldt's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.