Change of Use in Dewey-Humboldt, Arizona
Dewey-Humboldt has no single, dedicated 'Change of Use Permit' application distinct from its general Zoning Clearance and Building Permit mechanisms. IMPORTANT: this is a fresh, independent finding, distinct from this file's zoning-clearance-permit entry -- that entry documents the Town FAQ's narrower description of Zoning Clearance as the path for work EXEMPT from a full Building Permit (sheds, fences, tanks, driveways). A change of use is handled differently: the Town's Chapter 153 (Zoning Regulations) Appendix A Fee Schedule explicitly lists and prices 'changes of use' as a category under its Nonresidential Zoning Clearance fee table (a genuinely real, distinct, and directly on-point fee line, independently located in the ordinance itself), and separately, any change of occupancy classification on the building-code side is governed by the 2018 International Existing Building Code (§ 150.09) and requires a final inspection and Certificate of Occupancy from the Town's Building Official before the new use may occupy the space.
Verified 2026-07-23 · Source
When you need this permit
- For a change of use that is allowed by right in the applicable zoning district: submit a Zoning Clearance Application to Community Development; Chapter 153 Appendix A prices this under 'Nonresidential: noncommercial; motels; camps; commercial; industrial; changes of use; includes slabs, paving, walls, fences, sign supports' at $0.125 per sq. ft. under roof, with a $125 minimum permit fee
- For a proposed use that is NOT allowed by right in the applicable zoning district: a discretionary Use Permit (§ 153.091) is required instead, granted at the discretion of the Town Council after a Planning & Zoning Commission hearing and a Council hearing; the Town publishes an A.R.S. § 9-835-style timeframe for this specific track (see reviewTimelineNote) via its 'Use Permit Process Flow Diagram'
- On the building-code side, a change of occupancy classification (as defined by the adopted 2018 International Existing Building Code, § 150.09) triggers Building Official review under IEBC provisions governing repair, alteration, change of occupancy, addition, and relocation of existing buildings -- processed through this file's residential-building-permit or otc-electrical-plumbing-mechanical-permit entry depending on scope of work, not a standalone 'change of use' building permit
- A final inspection and a Certificate of Occupancy are required by the Town before the new use may occupy the space, per the Town's own FAQ ('When can I occupy my new home? A final inspection and a Certificate of Occupancy are required prior to occupancy.'); no separate CO-specific fee line was found in Chapter 150 Appendix A -- CO issuance appears bundled into the standard Building Permit fee mechanism (Yavapai County pass-through + 42% Town administration fee) rather than charged separately
- If the change of use involves a fire-protection system change (e.g., a new commercial occupancy requiring sprinklers or an alarm system), a separate CAFMA fire-sprinkler-permit and/or fire-alarm-permit (this file's entries) is required independently of the Town's own review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection / Certificate of Occupancy
Required by the Town's Building Official before the new use may occupy the space, per the Town's own FAQ; if fire-protection systems are affected, CAFMA separately inspects for Fire Code compliance before a temporary or permanent CO is issued
See the full Dewey-Humboldt inspection guide — scheduling & re-inspection fees →
Tips
- Do not confuse this file's zoning-clearance-permit entry (which documents the narrower, Building-Permit-exempt-work use case from the Town's FAQ) with the change-of-use fee category documented here -- both use the term 'Zoning Clearance' but Chapter 153's own Appendix A Fee Schedule shows the mechanism is actually applied broadly across residential, nonresidential, and change-of-use categories, not just exempt small structures.
- Whether a change of use needs only the cheaper by-right Zoning Clearance path ($125 minimum) or the much more expensive and time-consuming discretionary Use Permit path (starting at $750-$1,000 plus per-acre fees, with mandatory hearings) depends entirely on whether the new use is allowed by right in the parcel's zoning district -- confirm the zoning designation and permitted-use table (§ 153.036 through § 153.051) with Community Development (928-632-7362) before assuming which track applies.
- A change of use that also changes the building's occupancy classification under the adopted 2018 IEBC may require actual construction/life-safety upgrades (e.g., egress, fire-rating, accessibility) reviewed through the Town's standard Building Permit process, in addition to whichever zoning-side change-of-use fee applies -- budget for both tracks, not just one.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dewey-Humboldt
Change of Use in other cities
Compare change of use fees across Arizona →
Look up this fee in a different city →
Now live
Build your Dewey-Humboldt project checklist
Describe your project once and get every permit, document, and fee it triggers in Dewey-Humboldt — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →