Zoning Clearance Permit — Dewey-Humboldt, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.dhaz.gov/Faq.aspx?QID=177
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Zoning Clearance Permit in Dewey-Humboldt, Arizona
Required for work exempt from a full Building Permit (small accessory structures, fences, retaining walls, ground water tanks, driveways) as well as any structure requiring zoning setback/compliance confirmation, per the Town's own FAQ on Building Permit exemptions.
Verified 2026-07-06 · Source
When you need this permit
- Required for building-permit-exempt work: one-story detached accessory structures under 400 sq ft, fences 6 ft or under, retaining walls 4 ft or under (from bottom of footing), ground water tanks 5,000 gallons or under, and certain sidewalks/driveways
- Confirms zoning compliance (setbacks, lot coverage, use) even where no building-code review is triggered
- Submittal checklist ('Zoning Clearance Permit' column) requires: signed application, 1 Plot Plan (8.5"x11"), and a deposit — same lightweight documentation tier as the OTC permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Figure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); Show full citationHide
Figure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); reconfirm the current exact dollar amount directly with the Building Safety office (928-632-7362), as no standalone current fee-schedule line item for 'Zoning Clearance' specific to the Town (as opposed to Yavapai County's own $200 unincorporated-area zoning clearance fee, which does NOT apply within Town limits) was independently located on a live Town fee-schedule pageReview timeline
Inspection process
See the full Dewey-Humboldt inspection guide — scheduling & re-inspection fees →
Tips
- Zoning Clearance is the correct permit path for anything on the Town's building-permit-exemption list (small sheds, low fences, low retaining walls, small ground water tanks) — these items still require Town sign-off, just not a full building-code plan review.
- Do not confuse this Town-level Zoning Clearance with Yavapai County's own, separate Zoning Clearance Fee schedule (e.g., the County's $200 residential zoning clearance fee) — that County fee schedule explicitly governs 'UNINCORPORATED AREAS OF YAVAPAI COUNTY' and does not apply within incorporated Dewey-Humboldt town limits.
- No inspections are associated with a standalone Zoning Clearance Permit since it does not involve building-code-regulated construction.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Dewey-Humboldt's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Dewey-Humboldt yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Dewey-Humboldt lands. Privacy.
Other permits in Dewey-Humboldt
Zoning Clearance Permit in other cities
Compare zoning clearance permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Dewey-Humboldt project checklist
Describe your project once and get every permit, document, and fee it triggers in Dewey-Humboldt — in one checklist. Free, for any city and any number of projects.
Get started →