Solar Permit — Dewey-Humboldt, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.dhaz.gov/2166/Printable-Forms
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Permit in Dewey-Humboldt, Arizona
Required for residential and other solar photovoltaic installations in Dewey-Humboldt, using a dedicated Solar Permit Application distinct from the general Building Permit and OTC forms.
Verified 2026-07-06 · Source
When you need this permit
- Solar Permit Application distinguishes Residential / Other / Labor Only project types, each with its own valuation entry
- Governed by the National Electrical Code as adopted by the Town (§ 150.07) and the 2018 IBC/IRC structural provisions for roof-mounted or ground-mounted arrays
- A copy of the county septic approval must be attached per the printed form instruction (NOTE: this requirement is printed on the Solar Permit Application template itself, even though septic relevance to a solar-only project may not always apply — likely a shared template carried over from the Building Permit form; confirm applicability with Building Safety for solar-only, no-septic-impact projects)
- For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license Contractor
- Submittal checklist ('Solar Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan (8.5"x11"), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit — no separate site plan or truss calculations required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final
Panel/racking mounting, roof penetration sealing, electrical connections, and interconnection point verified; 24-hour notice required
See the full Dewey-Humboldt inspection guide — scheduling & re-inspection fees →
Tips
- No evidence of SolarAPP+ (the instant-permitting third-party platform used by some other Arizona cities, e.g. Cottonwood) was found on Dewey-Humboldt's site — solar permits appear to go through the Town's standard review process, so use the general Town-published review-time statement of 1-2 weeks (5-10 business days) rather than assuming same-day issuance.
- The Solar Permit Application shares the identical validity/expiration/owner-builder legal boilerplate as the general Building Permit and OTC forms (2-year validity, 180-day commencement/inspection requirement, one 180-day extension available). Owner-builder
- The printed septic-approval attachment line on this form is likely a carried-over template artifact from the Building Permit form rather than a universal solar-specific requirement — confirm with the Building Official (928-632-7362) whether it truly applies to your specific solar-only scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dewey-Humboldt
Solar Permit in other cities
Compare solar permit fees across Arizona →
Look up this fee in a different city →