Change of Use (via Commercial Building Permit) -- No Distinct Certificate of Occupancy Product in Eagar, Arizona
Covers a change in use of an existing commercial building or space in the Town of Eagar (e.g., converting a retail space to a restaurant). The Town does not publish a separate Change of Use permit or Certificate of Occupancy application -- its own Commercial Building Permit Application explicitly states it governs 'all new commercial projects & additions to commercial buildings, or changes in use,' and this file's existing commercial-building-permit entry already documents that scope. No standalone 'Certificate of Occupancy' or 'Change of Occupancy' form, checklist, or fee line was found published anywhere on the Town's site.
Verified 2026-07-23 · Source
When you need this permit
- A change in use of an existing commercial building or space is processed through the Town's Commercial Building Permit Application -- confirmed directly in the source PDF text: 'ALL NEW COMMERCIAL PROJECTS & ADDITIONS TO COMMERCIAL BUILDINGS, OR CHANGES IN USE WHICH EQUAL 3000 SQ. FT. OR MORE, MUST HAVE A STAMP ON THE PLANS FROM AN ARIZONA CERTIFIED PROFESSIONAL DESIGNER'
- Changes in use equal to 3,000 sq ft or more require a stamp on the plans from an Arizona-certified/registered design professional, the same threshold already documented on this file's commercial-building-permit entry
- Two plot plans and two sets of plans/specifications required, per the same Commercial Building Permit requirements already documented elsewhere in this file
- All commercial projects, including changes in use, must be approved by the Town's Design Review Board
- No distinct final 'Certificate of Occupancy' document or fee was found published -- the Commercial Building Permit's own Final inspection (already documented in this file's commercial-building-permit entry) is the last step described in the Town's own materials
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
All work and conditions associated with the change of use complete per approved plans -- same Final inspection step already documented on this file's commercial-building-permit entry; no separate occupancy-specific inspection was found published
See the full Eagar inspection guide — scheduling & re-inspection fees →
Tips
- Eagar has no distinct 'Change of Use Permit' or 'Certificate of Occupancy' product -- a change in the use of an existing commercial building or space is processed through the same Commercial Building Permit Application already documented elsewhere in this file, confirmed directly against the source PDF's own scope statement.
- The 3,000 sq ft design-professional-stamp threshold applies to changes in use exactly as it applies to new commercial construction and additions -- this is stated as a single combined rule on the application form, not a separate change-of-use-specific rule.
- No dedicated fee line, checklist, or timeline distinct from the standard Commercial Building Permit was found for a change of use -- the same town-wide fee-schedule gap already documented elsewhere in this file applies here as well.
- Applicants converting an existing commercial space to a new use should still confirm parking, zoning-district use-table compliance, and Design Review Board scope with Community Development (928-333-4128 ext. 222) before submitting, since these are administered under Title 18 zoning provisions that sit alongside, not inside, the Commercial Building Permit application itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eagar
Change of Use (via Commercial Building Permit) -- No Distinct Certificate of Occupancy Product in other cities
Look up this fee in a different city →
Now live
Build your Eagar project checklist
Describe your project once and get every permit, document, and fee it triggers in Eagar — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →