Eagar building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Eagar, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 22 W. 2nd St., PO Box 1300, Eagar, AZ 85925
- Phone
- 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests)
- Office hours
- Community Development Department: 7:00 a.m. - 5:30 p.m., Monday through Thursday (Town of Eagar operates a 4-day, 10-hour workweek). Building Department inspection requests are taken 8:00 a.m. - 4:00 p.m. Monday-Thursday or 8:00 a.m. - 12:00 p.m. Fridays, per the Town's own permit application forms, and should be made at least 24 hours in advance.
- Website
- Official site
Published scheduling rules
- Request all inspections at least 24 hours in advance by calling the Building Department at 928-333-4128 ext. 230 or ext. 228, providing permit number, applicant name, type of inspection, and job location. (Residential Building Permit)
- Request inspections at least 24 hours in advance via the Building Department at 928-333-4128 ext. 230 or ext. 228. (Residential Electrical Permit)
- Request inspections at least 24 hours in advance via the Building Department at 928-333-4128 ext. 230 or ext. 228. (Plumbing Permit)
- Request inspections at least 24 hours in advance via the Building Department at 928-333-4128 ext. 230 or ext. 228. (Mechanical Permit)
- Request inspections at least 24 hours in advance via the Building Department at 928-333-4128 ext. 230 or ext. 228; permits expire 360 days after issuance. (Solar PV Permit (via Building + Electrical Permits))
Inspection sequence
Applies to: Commercial Building Permit
- 1
Footings or Foundation
Before laying any concrete; requires clearly marked property lines and setbacks
- 2
Underground Plumbing
Before covering
- 3
Concrete Slab or Under-Floor
Before laying concrete or plywood deck
- 4
Shear Bracing
Before covering
- 5
Rough Framing, Electrical, Plumbing and Mechanical
Combined rough-in inspection
- 6
Gypsum Nailing
Before taping/finishing
- 7
Final
All work complete per approved plans
Applies to: Residential Building Permit
- 1
Footings or Foundation
Before laying any concrete; footings/foundations are only approved when clearly and accurately marked property lines and setbacks are provided
- 2
Underground Plumbing
Before covering
- 3
Concrete Slab or Under-Floor
Before laying concrete or floor deck
- 4
Shear Wall Nailing
Before covering shear-braced walls
- 5
Rough Framing, Electrical, Plumbing and Mechanical
Combined rough-in inspection for framing and all trades
- 6
Gypsum Nailing
Before taping/finishing
- 7
Final
All work complete per approved plans
Applies to: EV Charger / EVSE Permit (via Residential Electrical Permit)
- 1
Rough Electrical
Wiring and box placement before walls closed (if applicable)
- 2
Final
Charger circuit/unit installed and system energized per 2011 NEC as adopted by the Town
Applies to: Mechanical Permit
- 1
Rough-In
Equipment placement and connections before enclosure (per the standard Town trade-permit inspection sequence used for electrical/plumbing)
- 2
Final
Equipment operational and connections verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Vent and water tests
- 2
Final
Fixtures connected, no leaks
Applies to: Residential Electrical Permit
- 1
Rough Electrical
Wiring and box placement before walls closed
- 2
Final
Devices installed and system energized per 2011 NEC as adopted by the Town
Applies to: Solar PV Permit (via Building + Electrical Permits)
- 1
Rough Electrical
Wiring and box placement before walls closed / before energizing
- 2
Final
Panel mounting, racking attachment, and electrical connections verified; system energized per 2011 NEC as adopted by the Town
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Eagar building permits
Get alerts for Eagar
We'll email you when Eagar's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.