EV Charger / EVSE Permit (via Residential Electrical Permit) in Eagar, Arizona

Required for installation of an electric vehicle charging station in the Town of Eagar. The Town does not publish a separate EV-charger/EVSE permit or application — an EV charger circuit is new/additional residential electrical service, processed through the same Residential Electrical Building Permit Application already documented on this file's electrical-permit entry, governed by the 2011 NEC as adopted by the Town. Like that entry, and consistent with this file's confirmed town-wide gap, no readable fee table was located for the Residential Electrical Building Permit (the Town's Fee Schedule link is flagged 'draft' and its underlying S3 object returns AccessDenied on every fetch attempt) — no fee figures are invented here. Re-chased 2026-07-20: independently re-attempted the Town's Fee Schedule (still flagged 'draft', underlying S3 object still AccessDenied), re-searched the Town's site and documents API, and checked the general electrical-permit entry in this same file (also confidence: verified) which carries the identical gap -- no fee figure is published anywhere for the Residential Electrical Building Permit. Upgraded to verified on the strength of the independently-confirmed governing timeline (6 working days) and mechanism (same Residential Electrical Building Permit Application, no distinct EV line), consistent with how the general electrical-permit entry in this file is already verified despite the same unpublished fee.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for new electrical service, panel upgrades, or additions to existing service, including a dedicated EV charger circuit — same requirement category already documented on this file's electrical-permit entry
  • Two sets of plans and specifications required (as applicable to the scope), each page bearing the owner/builder's name and phone number Owner-builder
  • No additions, alterations, or modifications to approved plans without written approval of the building official
  • Contractor information (name, AZ ROC license number and class) required, or a claimed owner-builder exemption under A.R.S. § 32-1121(A)(5) or (A)(6) Owner-builderContractor
  • No dedicated EV-charger/EVSE line, checkbox, or form exists on the Town's Residential Electrical Building Permit Application — confirmed against the same source PDF already cited on this file's electrical-permit entry

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan reviewEagar’s published plan-review target
6–6 business days

How long did your EV Charger / EVSE Permit (via Residential Electrical Permit) permit actually take in Eagar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and box placement before walls closed (if applicable)

  2. 2

    Final

    Charger circuit/unit installed and system energized per 2011 NEC as adopted by the Town

See the full Eagar inspection guide — scheduling & re-inspection fees →

Tips

  • There is no distinct 'EV charger permit' in Eagar — apply using the same Residential Electrical Building Permit Application used for any other electrical work.
  • As with the rest of this file's fee data, no readable fee figure was located for the Residential Electrical Building Permit — the Town's own Fee Schedule link is flagged 'draft' and its underlying document is genuinely inaccessible (AccessDenied on every fetch attempt tried). Call the Building Department, 928-333-4128 ext. 230 or ext. 228, for a current quote.
  • Permits expire 360 days after issuance; extend beyond 365 days by paying half the original permit cost.

Frequently asked questions

Eagar requires an ev charger / evse permit (via residential electrical permit) for: Electrical permit required for new electrical service, panel upgrades, or additions to existing service, including a dedicated EV charger circuit — same requirement category already documented on this file's electrical-permit entry; Two sets of plans and specifications required (as applicable to the scope), each page bearing the owner/builder's name and phone number; No additions, alterations, or modifications to approved plans without written approval of the building official; Contractor information (name, AZ ROC license number and class) required, or a claimed owner-builder exemption under A.R.S. § 32-1121(A)(5) or (A)(6); No dedicated EV-charger/EVSE line, checkbox, or form exists on the Town's Residential Electrical Building Permit Application — confirmed against the same source PDF already cited on this file's electrical-permit entry. If your project isn't listed, confirm with Town of Eagar Community Development Department — Building Department at 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests) before starting work.

Eagar's published plan-review target for an ev charger / evse permit (via residential electrical permit) is 6–6 business days.

You'll need: Residential Electrical Building Permit Application. See the required-documents checklist on this page for details on each.

Eagar requires 2 inspection(s) for an ev charger / evse permit (via residential electrical permit), in order: Rough Electrical, Final. Schedule each through Town of Eagar Community Development Department — Building Department (928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests)).

Apply through Town of Eagar Community Development Department — Building Department at 22 W. 2nd St., PO Box 1300, Eagar, AZ 85925. Phone: 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests), email: No published department email address found as of this review; contact via phone at 928-333-4128 ext. 222 (Community Development) or submit a request via the Town's 'Submit a Request or Concern' web form.. Office hours: Community Development Department: 7:00 a.m. - 5:30 p.m., Monday through Thursday (Town of Eagar operates a 4-day, 10-hour workweek). Building Department inspection requests are taken 8:00 a.m. - 4:00 p.m. Monday-Thursday or 8:00 a.m. - 12:00 p.m. Fridays, per the Town's own permit application forms, and should be made at least 24 hours in advance.. Official information: https://www.eagaraz.gov/o/tofe/page/building.

Eagar, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Eagar runs its own Community Development / Building Department and independently adopts and administers its own construction codes; it does NOT defer building permitting to Apache County or to the neighboring Town of Springerville. Source: Town of Eagar Building page (eagaraz.gov/o/tofe/page/building) and the Town's own published Building, Commercial, Electrical, Plumbing, Mechanical, and Demolition Permit Application forms, each captioned 'Return this application... to the Building Department.'; 2018 International Residential Code (IRC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page (eagaraz.gov/o/tofe/page/building): 'Adopted Building Codes – 2018 IRC, IBC, IPC, IMC, IPMC, IFC and 2011 NEC.'; 2018 International Building Code (IBC), as adopted by the Town of Eagar for commercial/non-residential construction. Source: Town of Eagar Building Design Specifications page.; 2018 International Plumbing Code (IPC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Mechanical Code (IMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Property Maintenance Code (IPMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Fire Code (IFC), as adopted by the Town of Eagar as its uniform fire code. Source: Town of Eagar Building Design Specifications page. (Fire/EMS response in the Round Valley — Eagar and Springerville jointly — is provided by the Round Valley Fire & Medical Department, a genuinely joint public-safety service; this is distinct from building-code adoption and permitting, which each town administers separately.); 2011 National Electrical Code (NEC), as adopted by the Town of Eagar (electrical code cycle predates the 2018 ICC set). Source: Town of Eagar Building Design Specifications page.; Note on code-text access: the Town's Code of Ordinances (Title 15, Buildings and Construction) is hosted on Municode Library (library.municode.com/az/eagar) behind an authenticated, JavaScript-rendered application; the underlying content API returned HTTP 401 on every attempted request and no Wayback Machine snapshot of the rendered Title 15 text exists (confirmed via CDX search — all archived captures of Eagar Municode pages are empty application shells under 4KB). The specific code edition years above are instead sourced directly from the Town's own Building Design Specifications page, which is a primary, town-published, non-mirror source.. Local amendments apply — see the Eagar overview page for the full list.

No. The Town of Eagar has no distinct EV-charger or EVSE permit — an EV charging station circuit is installed under the same Residential Electrical Building Permit Application used for any other electrical work, with approval normally given within 6 working days of a complete application.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.