Commercial Building Permit in Eagar, Arizona

Required for new commercial construction, additions to commercial buildings, or changes in use in the Town of Eagar. Projects of 3,000 sq ft or more require an Arizona-certified design professional's stamp and may require Design Review Board approval.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for all new commercial projects, additions to commercial buildings, or changes in use within Eagar town limits
  • ALL new commercial projects, additions, or changes in use equal to 3,000 sq ft or more MUST have a stamp on the plans from an Arizona-certified professional designer
  • Two plot plans required showing accurate lot delineation, location of all existing and proposed structures, observing setbacks and easements
  • Two sets of plans and specifications required (footing, framing, roof detail, elevations), each page bearing the owner/builder's name and phone number Owner-builder
  • Elevation drawings required for commercial construction: front, sides, and rear, illustrating appearance/treatment; exterior materials and colors must be included; all commercial projects must be approved by the Design Review Board
  • A copy of the septic permit is required when applicable
  • Proof of property ownership may be required if acquired within sixty days prior to application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan reviewEagar’s published plan-review target
10–10 business days

How long did your Commercial Building Permit permit actually take in Eagar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings or Foundation

    Before laying any concrete; requires clearly marked property lines and setbacks

  2. 2

    Underground Plumbing

    Before covering

  3. 3

    Concrete Slab or Under-Floor

    Before laying concrete or plywood deck

  4. 4

    Shear Bracing

    Before covering

  5. 5

    Rough Framing, Electrical, Plumbing and Mechanical

    Combined rough-in inspection

  6. 6

    Gypsum Nailing

    Before taping/finishing

  7. 7

    Final

    All work complete per approved plans

See the full Eagar inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town of Eagar Commercial Building Permit Application: 'Approval shall normally be given within 10 working days after application is received. If there is any delay beyond 15 working days, a letter of explanation shall be sent to the applicant.'
  • Any commercial project 3,000 sq ft or larger requires a plan stamp from an Arizona-certified professional designer — this is a hard threshold stated directly on the application form.
  • Some commercial development must go before the Design Review Board in addition to standard plan review.
  • Permits expire 360 days after issuance; extend beyond 365 days by paying half the original permit cost.

Frequently asked questions

Eagar requires a commercial building permit for: Building permit required for all new commercial projects, additions to commercial buildings, or changes in use within Eagar town limits; ALL new commercial projects, additions, or changes in use equal to 3,000 sq ft or more MUST have a stamp on the plans from an Arizona-certified professional designer; Two plot plans required showing accurate lot delineation, location of all existing and proposed structures, observing setbacks and easements; Two sets of plans and specifications required (footing, framing, roof detail, elevations), each page bearing the owner/builder's name and phone number; Elevation drawings required for commercial construction: front, sides, and rear, illustrating appearance/treatment; exterior materials and colors must be included; all commercial projects must be approved by the Design Review Board; A copy of the septic permit is required when applicable; Proof of property ownership may be required if acquired within sixty days prior to application. If your project isn't listed, confirm with Town of Eagar Community Development Department — Building Department at 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests) before starting work.

Per the Town of Eagar's own Commercial Building Permit Application, approval is normally given within 10 working days after a complete application is received; any delay beyond 15 working days triggers a letter of explanation to the applicant.

You'll need: Commercial Building Permit Application; Plot Plan (x2); Construction Plans and Specifications (x2 sets); Elevation Drawings. See the required-documents checklist on this page for details on each.

Eagar requires 7 inspection(s) for a commercial building permit, in order: Footings or Foundation, Underground Plumbing, Concrete Slab or Under-Floor, Shear Bracing, Rough Framing, Electrical, Plumbing and Mechanical, Gypsum Nailing, Final. Schedule each through Town of Eagar Community Development Department — Building Department (928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests)).

Apply through Town of Eagar Community Development Department — Building Department at 22 W. 2nd St., PO Box 1300, Eagar, AZ 85925. Phone: 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests), email: No published department email address found as of this review; contact via phone at 928-333-4128 ext. 222 (Community Development) or submit a request via the Town's 'Submit a Request or Concern' web form.. Office hours: Community Development Department: 7:00 a.m. - 5:30 p.m., Monday through Thursday (Town of Eagar operates a 4-day, 10-hour workweek). Building Department inspection requests are taken 8:00 a.m. - 4:00 p.m. Monday-Thursday or 8:00 a.m. - 12:00 p.m. Fridays, per the Town's own permit application forms, and should be made at least 24 hours in advance.. Official information: https://www.eagaraz.gov/o/tofe/page/building.

Eagar, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Eagar runs its own Community Development / Building Department and independently adopts and administers its own construction codes; it does NOT defer building permitting to Apache County or to the neighboring Town of Springerville. Source: Town of Eagar Building page (eagaraz.gov/o/tofe/page/building) and the Town's own published Building, Commercial, Electrical, Plumbing, Mechanical, and Demolition Permit Application forms, each captioned 'Return this application... to the Building Department.'; 2018 International Residential Code (IRC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page (eagaraz.gov/o/tofe/page/building): 'Adopted Building Codes – 2018 IRC, IBC, IPC, IMC, IPMC, IFC and 2011 NEC.'; 2018 International Building Code (IBC), as adopted by the Town of Eagar for commercial/non-residential construction. Source: Town of Eagar Building Design Specifications page.; 2018 International Plumbing Code (IPC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Mechanical Code (IMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Property Maintenance Code (IPMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Fire Code (IFC), as adopted by the Town of Eagar as its uniform fire code. Source: Town of Eagar Building Design Specifications page. (Fire/EMS response in the Round Valley — Eagar and Springerville jointly — is provided by the Round Valley Fire & Medical Department, a genuinely joint public-safety service; this is distinct from building-code adoption and permitting, which each town administers separately.); 2011 National Electrical Code (NEC), as adopted by the Town of Eagar (electrical code cycle predates the 2018 ICC set). Source: Town of Eagar Building Design Specifications page.; Note on code-text access: the Town's Code of Ordinances (Title 15, Buildings and Construction) is hosted on Municode Library (library.municode.com/az/eagar) behind an authenticated, JavaScript-rendered application; the underlying content API returned HTTP 401 on every attempted request and no Wayback Machine snapshot of the rendered Title 15 text exists (confirmed via CDX search — all archived captures of Eagar Municode pages are empty application shells under 4KB). The specific code edition years above are instead sourced directly from the Town's own Building Design Specifications page, which is a primary, town-published, non-mirror source.. Local amendments apply — see the Eagar overview page for the full list.

Yes, if the project (new construction, addition, or change of use) is 3,000 sq ft or more, the plans must be stamped by an Arizona-certified professional designer.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Eagar.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.