Demolition Permit in Eagar, Arizona

Required for demolition of a structure in the Town of Eagar.

Reviewed 2026-07-06 · Source

When you need this permit

  • Demolition permit required prior to demolishing a structure within Eagar town limits
  • Applicant, owner, and contractor identification and job-site location required on the application
  • Contractor information (name, AZ ROC license number and class) required for licensed demolition contractors Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Eagar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies complete demolition and site condition (no separately itemized inspection sequence was published for this permit type)

See the full Eagar inspection guide — scheduling & re-inspection fees →

Tips

  • The Town of Eagar's own published Demolition Permit Application (https://5il.co/2pp2z) is a single-page bare fillable form with no cover-page process, fee, or review-timeline text at all. No separate Demolition-specific timeline, checklist, or process document exists elsewhere on the Town's site, Municode, or archived site versions. This is a genuine gap in the Town's published materials rather than an inferred or estimated figure.
  • Unlike Buckeye (Maricopa County), Eagar/Apache County publishes no requirement to clear demolition through a county air-quality/NESHAP program — confirm any Arizona Department of Environmental Quality (ADEQ) NESHAP asbestos-notification obligations directly with ADEQ, since that requirement flows from state/federal law rather than town ordinance and falls outside what the Town's own site covers.

Frequently asked questions

Eagar requires a demolition permit for: Demolition permit required prior to demolishing a structure within Eagar town limits; Applicant, owner, and contractor identification and job-site location required on the application; Contractor information (name, AZ ROC license number and class) required for licensed demolition contractors. If your project isn't listed, confirm with Town of Eagar Community Development Department — Building Department at 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests) before starting work.

Not published. The Town of Eagar's own Demolition Permit Application form contains no review-timeline commitment, fee amount, or process description of any kind. This is a confirmed gap — contact the Building Department (928-333-4128 ext. 222) directly for current processing expectations.

You'll need: Demolition Permit Application. See the required-documents checklist on this page for details on each.

Eagar requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Town of Eagar Community Development Department — Building Department (928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests)).

Apply through Town of Eagar Community Development Department — Building Department at 22 W. 2nd St., PO Box 1300, Eagar, AZ 85925. Phone: 928-333-4128 ext. 222 (Community Development); ext. 230 or ext. 228 (Building Department inspection requests), email: No published department email address found as of the last verification; contact via phone at 928-333-4128 ext. 222 (Community Development) or submit a request via the Town's 'Submit a Request or Concern' web form.. Office hours: Community Development Department: 7:00 a.m. - 5:30 p.m., Monday through Thursday (Town of Eagar operates a 4-day, 10-hour workweek). Building Department inspection requests are taken 8:00 a.m. - 4:00 p.m. Monday-Thursday or 8:00 a.m. - 12:00 p.m. Fridays, per the Town's own permit application forms, and should be made at least 24 hours in advance.. Official information: https://www.eagaraz.gov/o/tofe/page/building.

Eagar, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Eagar runs its own Community Development / Building Department and independently adopts and administers its own construction codes; it does NOT defer building permitting to Apache County or to the neighboring Town of Springerville. Source: Town of Eagar Building page (eagaraz.gov/o/tofe/page/building) and the Town's own published Building, Commercial, Electrical, Plumbing, Mechanical, and Demolition Permit Application forms, each captioned 'Return this application... to the Building Department.'; 2018 International Residential Code (IRC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page (eagaraz.gov/o/tofe/page/building): 'Adopted Building Codes – 2018 IRC, IBC, IPC, IMC, IPMC, IFC and 2011 NEC.'; 2018 International Building Code (IBC), as adopted by the Town of Eagar for commercial/non-residential construction. Source: Town of Eagar Building Design Specifications page.; 2018 International Plumbing Code (IPC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Mechanical Code (IMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Property Maintenance Code (IPMC), as adopted by the Town of Eagar. Source: Town of Eagar Building Design Specifications page.; 2018 International Fire Code (IFC), as adopted by the Town of Eagar as its uniform fire code. Source: Town of Eagar Building Design Specifications page. (Fire/EMS response in the Round Valley — Eagar and Springerville jointly — is provided by the Round Valley Fire & Medical Department, a genuinely joint public-safety service; this is distinct from building-code adoption and permitting, which each town administers separately.); 2011 National Electrical Code (NEC), as adopted by the Town of Eagar (electrical code cycle predates the 2018 ICC set). Source: Town of Eagar Building Design Specifications page.; Note on code-text access: the Town's Code of Ordinances (Title 15, Buildings and Construction) is hosted on Municode Library (library.municode.com/az/eagar) behind an authenticated application, with no publicly readable mirror of the Title 15 text. The specific code edition years above are instead sourced directly from the Town's own Building Design Specifications page, which is a primary, town-published, non-mirror source.. Local amendments apply — see the Eagar overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Eagar's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Eagar yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Eagar lands. Privacy.