Wellton building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Wellton, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
28634 Oakland Avenue, Wellton, AZ 85356 (mailing: PO Box 67, Wellton, AZ 85356)
Phone
928-785-3348
Office hours
Monday - Thursday, 6:30 a.m. - 5 p.m. (Town Hall operates a 4-day work week; closed Fridays). Building permit applications are processed by the Building Safety Division; contact person for permit application/review questions is Ashley Rivera, Permit Clerk (928-785-3348, arivera@town.wellton.az.us).

Published scheduling rules

  • Emergency plumbing/gas repairs must have a permit application submitted to the building official within the next business day (Plumbing Permit)

Inspection sequence

Applies to: Commercial Building Permit (New Construction / Tenant Improvement)

  1. 1

    Footing/Foundation

    Required before concrete pour, per the inspection provisions of the Town's adopted 2009 I-Codes

  2. 2

    Underground/Under-Slab Utilities

    Plumbing, mechanical, and electrical work below slab verified before cover, per the adopted 2009 I-Codes

  3. 3

    Framing and Rough-In (Structural/Mechanical/Plumbing/Electrical)

    Structural framing and MEP rough-ins verified before concealment, per the adopted 2009 I-Codes

  4. 4

    Final

    Completed work verified against approved plans before occupancy, per the adopted 2009 I-Codes

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions with new foundation work

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction / Additions)

  1. 1

    Foundation/Footing

    Required before concrete pour

  2. 2

    Framing

    Structural framing and connections per adopted 2009 I-Codes

  3. 3

    Final

    Completed work verified against approved plans before occupancy

Applies to: Change of Use / Change of Occupancy Permit

  1. 1

    Rough-In (if systems are altered)

    Plumbing, mechanical, electrical, and/or fire sprinkler work performed to serve the new occupancy, verified before concealment

  2. 2

    Final / Certificate of Occupancy

    Completed work verified against approved plans; the Certificate of Occupancy is the statement signed by the Town's Building Official that the building, structure, or use complies with the Development Code and may be used for the purposes stated in it

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per adopted 2009 I-Codes

Applies to: EV Charger Installation (Building + Electrical Permit)

  1. 1

    Rough-In (if applicable)

    Wiring and panel connections before walls/concealment, for chargers requiring new circuit runs

  2. 2

    Final

    Charger installed and connections verified per the Town's adopted 2009 I-Codes

Applies to: Fire Sprinkler Permit

  1. 1

    Rough-In / Overhead Piping

    Sprinkler piping, hangers, and heads verified before ceilings are closed, per the Town's adopted 2009 I-Codes

  2. 2

    Final

    Completed system verified against approved fire sprinkler plans before occupancy

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational and clearances verified per adopted 2009 I-Codes

Applies to: Plumbing Permit

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, no leaks, per adopted 2009 I-Codes

Applies to: Solar PV Installation (Building + Electrical Permit)

  1. 1

    Rough-In / Electrical

    Wiring, disconnects, and mounting/racking attachment verified before covering, per adopted 2009 I-Codes

  2. 2

    Final

    Completed installation verified against approved plans

Final inspection only: Demolition Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Wellton building permits

Get alerts for Wellton

We'll email you when Wellton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.