Wellton building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Wellton, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
28634 Oakland Avenue, Wellton, AZ 85356 (mailing: PO Box 67, Wellton, AZ 85356)
Phone
928-785-3348
Office hours
Monday - Thursday, 6:30 a.m. - 5 p.m. (Town Hall operates a 4-day work week; closed Fridays). Building permit applications are processed by the Building Safety Division; contact person for permit application/review questions is Ashley Rivera, Permit Clerk (928-785-3348, arivera@town.wellton.az.us).

Published scheduling rules

  • Emergency plumbing/gas repairs must have a permit application submitted to the building official within the next business day (Plumbing Permit)

Inspection sequence

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions with new foundation work

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction / Additions)

  1. 1

    Foundation/Footing

    Required before concrete pour

  2. 2

    Framing

    Structural framing and connections per adopted 2009 I-Codes

  3. 3

    Final

    Completed work verified against approved plans before occupancy

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per adopted 2009 I-Codes

Applies to: EV Charger Installation (Building + Electrical Permit)

  1. 1

    Rough-In (if applicable)

    Wiring and panel connections before walls/concealment, for chargers requiring new circuit runs

  2. 2

    Final

    Charger installed and connections verified per the Town's adopted 2009 I-Codes

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational and clearances verified per adopted 2009 I-Codes

Applies to: Plumbing Permit

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, no leaks, per adopted 2009 I-Codes

Applies to: Solar PV Installation (Building + Electrical Permit)

  1. 1

    Rough-In / Electrical

    Wiring, disconnects, and mounting/racking attachment verified before covering, per adopted 2009 I-Codes

  2. 2

    Final

    Completed installation verified against approved plans

Final inspection only: Demolition Permit

Wellton building permits

Get alerts for Wellton

We'll email you when Wellton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.