Residential Addition / Remodel Permit in Wellton, Arizona

Required for room additions, remodels, and alterations to existing one- and two-family dwellings in Wellton, reviewed against the Town's adopted 2009 I-Codes using the same Building Permit Application and plan review process as new construction.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for enlargement, alteration, or repair of an existing structure, unless the specific scope falls under the Town's published permit-exempt list (e.g., accessory structures up to 120 sq ft, fences up to 6 feet, retaining walls up to 4 feet)
  • Two complete sets of plans required, scaled to the scope of the addition/remodel (site plan, floor plan, framing details, and structural connection details to the existing structure)
  • Same Building Permit Application form used as for new construction, checking the 'Building' permit type box
  • Ordinary repairs not affecting structural elements, egress, or utility systems do not require a permit or notice to the building official

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationNo separate itemized fee schedule is published; fee is valuation-based per the Town's adopted 2009 I-Codes fee provisions. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312).
Calculated by Building Safety Division staff at intake based on project valuation
Construction Plan Review FeeFirst review and one resubmittal; hourly for subsequent reviews. Source: Town of Wellton Construction Plan Review Requirements Handout (PDF, DocumentCenter Doc ID 310).
65% of the building permit fee

Review timeline

Plan reviewWellton’s published plan-review target
5–15 business days

How long did your Residential Addition / Remodel Permit permit actually take in Wellton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions with new foundation work

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

See the full Wellton inspection guide — scheduling & re-inspection fees →

Tips

  • The Town's Construction Plan Review Requirements Handout does not break out a separate timeline specifically for additions/remodels distinct from new residential construction; this range (5-15 working days) reflects the handout's general '5 work days for small residential projects' floor and a conservative midpoint below the 30-day commercial ceiling, appropriate for addition/remodel scope which the handout treats within the same residential review track. As of July 2026, the Town does not publish a project-size-tiered breakdown beyond the 5-to-30-working-day range stated for all residential-to-commercial projects — call the Building Safety Division (928-785-3348) for a project-specific estimate.
  • One-story detached accessory structures up to 120 sq ft (tool sheds, playhouses) do not require a building permit in Wellton, provided zoning setbacks and lot coverage are met — this threshold is notably smaller than some larger Arizona cities' exemptions.

Frequently asked questions

Only if it exceeds 120 sq ft. One-story detached accessory structures (tool/storage sheds, playhouses, similar uses) up to 120 sq ft are exempt from a building permit, provided they meet required zoning setbacks and lot coverage. Source: Town of Wellton Building Permit Exempt Requirements.

In Wellton, the published Building Permit Fee — Based on Valuation is: Calculated by Building Safety Division staff at intake based on project valuation. Additional published fees: Construction Plan Review Fee — 65% of the building permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Wellton's published plan-review target for a residential addition / remodel permit is 5–15 business days.

You'll need: Building Permit Application; Site/Plot Plan and Construction Plans. See the required-documents checklist on this page for details on each.

Wellton requires 3 inspection(s) for a residential addition / remodel permit, in order: Foundation/Footing, Framing, Final. Schedule each through Town of Wellton Building Safety Division (Department of Community Development) (928-785-3348).

Apply through Town of Wellton Building Safety Division (Department of Community Development) at 28634 Oakland Avenue, Wellton, AZ 85356 (mailing: PO Box 67, Wellton, AZ 85356). Phone: 928-785-3348, email: arivera@town.wellton.az.us. Office hours: Monday - Thursday, 6:30 a.m. - 5 p.m. (Town Hall operates a 4-day work week; closed Fridays). Building permit applications are processed by the Building Safety Division; contact person for permit application/review questions is Ashley Rivera, Permit Clerk (928-785-3348, arivera@town.wellton.az.us).. Official information: https://www.welltonaz.gov/1226/Building-Permits.

Wellton, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Wellton operates its own Building Safety Division within its Department of Community Development and independently adopts and administers its own construction codes; it does not defer building permitting to Yuma County. Source: Town of Wellton Building Permits page (welltonaz.gov/1226/Building-Permits).; 2009 International Codes (I-Codes), as published by the International Code Council — the Town of Wellton's own live Building Permits page states verbatim: 'The Town of Wellton is currently following the 2009 International Council Code (ICC).' This is independently corroborated by the 2025 AZBO (Arizona Building Officials) Directory, which lists the Town of Wellton's 'Adopted Codes' as '2009 I Codes' with no separate electrical-code edition listed. Unlike most other AZBO-directory Arizona jurisdictions (which have since moved to 2015, 2018, or 2024-cycle I-Codes and separate NEC editions), Wellton's own published information has not been updated past the 2009 cycle as of this review — this reflects the Town's genuinely small size (approx. 2,600-3,000 population) and correspondingly thin published code-update cadence, not a research gap. Source: Town of Wellton Building Permits page (welltonaz.gov/1226/Building-Permits, live page text); 2025 AZBO Directory (azbo.us), Town of Wellton entry, p. 21.; The 2009 International Building Code (IBC), International Residential Code (IRC), International Mechanical Code (IMC), International Plumbing Code (IPC), International Fuel Gas Code (IFGC), International Fire Code (IFC), and International Existing Building Code (IEBC) are understood to be adopted as a single 2009 'I-Codes' package per the Town's own code-adoption statement; the Town's Building Permit Application form lists six permit-type categories that align with this code family: Building, Plumbing, Mechanical, Electrical, Fire Sprinkler, and Demolition. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312).; Manufactured/mobile homes are regulated via a separate, dedicated Mobile Home Placement Permit process (distinct application form) rather than the standard Building Permit Application, reflecting the Town's substantial manufactured-housing stock. Source: Town of Wellton Mobile Home Placement page (welltonaz.gov/1225/Mobile-Home-Placement) and Mobile Home Placement Permit Application (PDF, DocumentCenter Doc ID 313).; No dedicated, separately-published Town of Wellton fee schedule, master fee resolution, or ICC valuation table was found on the Town's official website, DocumentCenter, or in its adopted annual budget documents (FY2024-2025, FY2025-2026) as of this review. The Town's own Building Permit Application form leaves 'Valuation' and 'Permit Fees' as blank fields completed by Building Safety Division staff at intake, consistent with fees being calculated per-project from the adopted 2009 I-Codes' own valuation-based fee tables rather than a separately republished municipal fee schedule. This is a genuine gap in the Town's public documentation (typical for a town this size) rather than an omission in this research — confirmed by direct review of the Town's Finance Department, Development Services, and Development Impact Fees pages, none of which publish an itemized building-permit fee table. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312); Town of Wellton Finance Department page (welltonaz.gov/1221/Finance-Department); Town of Wellton Development Impact Fees page (welltonaz.gov/1229/Development-Impact-Fees).. Local amendments apply — see the Wellton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.