Residential Building Permit (New Construction / Additions) — Wellton, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.welltonaz.gov/1226/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction / Additions) in Wellton, Arizona
Required for new construction, enlargement, alteration, repair, moving, demolition, or occupancy change of a building or structure in the Town of Wellton, reviewed against the Town's adopted 2009 I-Codes. Applications are submitted to the Building Safety Division at Town Hall.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure within Wellton town limits
- Two complete sets of plans required for review, including: site/plot plan, floor plan, foundation plan, roof/floor framing plans, typical wall section, building elevations, truss plans and calculations, and plumbing/mechanical/electrical plans
- Reviewed against the Town's adopted 2009 International Codes (I-Codes) per the Town's own published code-adoption statement
- Applicant must indicate whether the address has overhead service and whether it has septic (if not, the Yuma County septic permit number must be attached)
- Owner/contractor must certify exemption from or compliance with the Arizona State Contractor's License Law (A.R.S. § 32-1121 / § 32-1169A) on the application Contractor
- Permit applications expire by limitation if no permit is issued within 180 days of the application date
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Required before concrete pour
- 2
Framing
Structural framing and connections per adopted 2009 I-Codes
- 3
Final
Completed work verified against approved plans before occupancy
See the full Wellton inspection guide — scheduling & re-inspection fees →
Tips
- Per the Town's Construction Plan Review Requirements Handout, normal plan review times range from 5 working days for small residential projects up to 30 working days for new commercial projects — the exact time within that range depends on project size/complexity and is not further broken out by the Town's published materials.
- The Town limits itself under A.R.S. § 9-835(G)/(I) (Senate Bill 1598) to one comprehensive request for additional information during review; applicants may optionally agree to allow multiple information requests in exchange for a 25% time extension per additional resubmittal (A.R.S. § 9-835(H)).
- Because no published fee schedule exists, applicants should contact Ashley Rivera, Permit Clerk (928-785-3348, arivera@town.wellton.az.us), directly for a project-specific fee estimate before submitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wellton
Residential Building Permit (New Construction / Additions) in other cities
Compare residential building permit (new construction / additions) fees across Arizona →
Look up this fee in a different city →