Change of Use / Change of Occupancy Permit — Wellton, Arizona · Requirements sheet
Reviewed 2026-07-06 · Source: https://www.welltonaz.gov/1226/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Wellton, Arizona
The Town of Wellton's own published permit trigger expressly covers occupancy change: 'A permit is required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure.' There is no separate change-of-use application form — the change is filed on the same standard six-checkbox Building Permit Application used for every other permit type ('Building' checked), and the application's Official Use Only block is where staff record the Occupancy Class, Occupant Load, Type of Construction, and Zoning District determinations that a change of use turns on. Two separate approvals are in play: the building-side occupancy change (Building Safety Division, reviewed against the Town's adopted 2009 I-Codes, closing with a Certificate of Occupancy signed by the Town's Building Official) and the zoning-side use question (Development Services / Zoning Administrator), because the Development Code bars issuance of a building permit for a use that first requires a Zoning Amendment, Minor Modification, Variance, or Conditional Use permit.
Reviewed 2026-07-06 · Source
When you need this permit
- A permit is required to change the occupancy of a building or structure — the Town's own Building Permit Exempt Requirements sheet states the trigger verbatim: 'A permit is required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure'
- Filed on the standard Town of Wellton Building Permit Application ('Building' permit-type box), plus 'Plumbing', 'Mechanical', 'Electrical', and/or 'Fire Sprinkler' boxes for any systems altered to serve the new use — there is no separate change-of-use form
- Two complete sets of plans are required for review by the Building Safety Division; a change of use into a commercial occupancy triggers the handout's commercial plan set (civil, storm water, landscaping, architectural, structural, mechanical, plumbing, electrical, and fire sprinkler plans, plus supporting specifications, calculations, and reports)
- Staff determine Occupancy Class, Occupant Load, Type of Construction, Zoning District, and Flood Zone at intake — these fields are printed in the application's Official Use Only block and are the determinations a change of use is decided on
- Zoning precondition (Development Code § 8-5.4(A)(4)): 'if a use requires a Zoning Amendment, Minor Modification, Variance, or Conditional Use permit, no building permit shall be issued until after said application has been approved in the manner described in Section 8-5.2(B) of the Development Code' — confirm with Development Services whether the proposed use is permitted outright in the parcel's zoning district before applying
- A Conditional Use, where required, is decided by the Town Council at a public hearing following a pre-development meeting, formal submittal, staff review/resubmittal, public notification, and a staff report (Town of Wellton Conditional Use Application Process Guide)
- Certificate of Occupancy: the Development Code defines it as 'A statement signed by the Town's Building Official, or their designee, setting forth that a building, structure, or use complies with the Development Code and that the same may be used for the purposes stated therein'
- Permit applications expire by limitation if no permit is issued within 180 days of the application date
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (if systems are altered)
Plumbing, mechanical, electrical, and/or fire sprinkler work performed to serve the new occupancy, verified before concealment
- 2
Final / Certificate of Occupancy
Completed work verified against approved plans; the Certificate of Occupancy is the statement signed by the Town's Building Official that the building, structure, or use complies with the Development Code and may be used for the purposes stated in it
See the full Wellton inspection guide — scheduling & re-inspection fees →
Tips
- The occupancy-change trigger is stated in the Town's own Building Permit Exempt Requirements sheet, not on the Building Permits landing page — the landing page itself only carries the 2009 ICC statement and three PDF links, so the permit requirement is easy to miss.
- Settle the zoning question first. Development Code § 8-5.4(A)(4) blocks issuance of the building permit until any required Zoning Amendment, Minor Modification, Variance, or Conditional Use has already been approved — starting with the Building Permit Application when the new use needs a Conditional Use will stall the file.
- A Conditional Use in Wellton is decided by the TOWN COUNCIL at a public hearing (not by a Planning Commission or an administrative approval), after a staff-review-and-resubmittal loop and extensive public notification. A pre-development meeting is 'highly recommended' by the Town's own guide before filing.
- The Town publishes no change-of-use or certificate-of-occupancy fee line, and its Conditional Use checklist literally substitutes a phone number for the fee amount — budget by calling 928-785-3348 rather than by any published figure.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wellton
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Arizona →
Look up this fee in a different city →