Building department
- Address
- 1600 First Street, Napa, CA 94559
- Phone
- 707-257-9540 (Building Division); 707-257-1063 (automated inspection line)
- Office hours
- FOUR DAYS A WEEK, AND THE LAST HALF HOUR IS NOT USABLE. "The Building Division is open and available to the public from 8 AM - 4 PM Monday through Thursday", and "Last submittal and/or permit issuance is at 3:30 PM to allow adequate time for processing before the counter closes." No Friday hours are published in any form - not even by appointment - so the effective week is 32 counter hours with a 30-minute dead zone at the end of each day.
- Website
- Official site
Inspection guide
See how inspections work in Napa — sequence, scheduling & re-inspection fees.
Codes adopted
California publishes its building standards as Title 24, adopted by state agencies and republished on a three-year cycle. A city or county may change those standards only after its governing body makes an express finding that the change is reasonably necessary because of local climatic, geological, or topographical conditions, and no change becomes operative until the finding and the change have been filed with the California Building Standards Commission.
TWO PAGES ON THE CITY'S OWN SITE GIVE DIFFERENT EFFECTIVE DATES FOR THE SAME CODE, AND BOTH ARE RECORDED HERE RATHER THAN RECONCILED. Show full textShow less
TWO PAGES ON THE CITY'S OWN SITE GIVE DIFFERENT EFFECTIVE DATES FOR THE SAME CODE, AND BOTH ARE RECORDED HERE RATHER THAN RECONCILED. The Building Division page: "The City of Napa adopted the 2025 California Building Code effective January 1, 2025 as amended by City Municipal Code Section 15.04.010." The Permits and Plan Review Information page: "Any permits applied for on January 1, 2026, or after must comply with adopted 2025 California Codes."
WHICH ONE MATCHES THE STATEWIDE FRAMEWORK: the 2025 California Building Standards Code was published on 2025-07-01 and takes effect 180 days later under Health & Safety Code 18938(b), which is 2026-01-01. Show full textShow less
WHICH ONE MATCHES THE STATEWIDE FRAMEWORK: the 2025 California Building Standards Code was published on 2025-07-01 and takes effect 180 days later under Health & Safety Code 18938(b), which is 2026-01-01. The Permits and Plan Review date agrees with that; the Building Division date does not. This record does not declare either page wrong - confirm with the division on 707-257-9540 if the distinction matters to your project.
- THE LOCAL AMENDMENT VEHICLE IS NAMED: the 2025 code is adopted "as amended by City Municipal Code Section 15.04.010". That section was not opened for this record.
- THE CITY PUBLISHES A SUMMARY OF 2025 CODE CHANGES as a separate document, which was not opened for this record.
- Health & Safety Code 18938(b) provides that building standards in the California Building Standards Code "shall apply to all occupancies throughout the state and shall become effective 180 days after publication."
Permit types & fees
Napa's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Napa yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Napa lands. Privacy.
Tips & gotchas
- NAPA HAS NO ONLINE SUBMITTAL PORTAL AT ALL, AND PUTS IT IN CAPITALS AT THE TOP OF THE PAGE: "PLEASE NOTE: THE CITY DOES NOT HAVE AN ONLINE PORTAL FOR SUBMITTALS." Across this California batch the assumption runs the other way - Carlsbad locks you into whichever channel you start in, Murrieta and Antioch route everything through self-service portals, Santa Rosa takes a thumb drive because all submittals must be electronic. Napa is the counter-example, and a guide that said California had gone digital would be wrong here in the plainest possible terms.
- TWO OF THE CITY'S OWN PAGES GIVE DIFFERENT EFFECTIVE DATES FOR THE SAME CODE. The Building Division page says the 2025 code was adopted "effective January 1, 2025"; the Permits and Plan Review page says permits applied for "on January 1, 2026, or after must comply with adopted 2025 California Codes". The second matches the statewide framework - the 2025 code was published on 1 July 2025 and takes effect 180 days later - which makes the first the likelier slip. This record carries both rather than silently correcting one, because a reader who quotes the Building Division page to a plans examiner needs to know the page disagrees with its neighbour.
- THE COUNTER IS OPEN FOUR DAYS A WEEK AND NOT ON FRIDAY IN ANY FORM. Monday to Thursday, 8 AM to 4 PM. Antioch also closes its counter on Fridays but keeps them open by appointment; Napa publishes nothing for Friday at all. With no online submittal route, a Friday is simply not a day on which you can lodge an application.
- AND THE LAST HALF HOUR OF EACH DAY IS NOT USABLE EITHER: "Last submittal and/or permit issuance is at 3:30 PM to allow adequate time for processing before the counter closes." The real window is 8:00 to 3:30, four days a week - thirty hours, in a city with no digital alternative.
- THE 21-DAY FULL REVIEW FIGURE IS IN BUSINESS DAYS, WHICH IS NOT THE SAME AS THREE WEEKS. "Plans are reviewed within 21 business days of submittal" is about 29 calendar days before any public holiday, against Roseville's "approximately 3 weeks" at 21 calendar days. Two cities publishing the number 21 are not offering the same service, and this record converts Napa's figure to calendar days so the comparison holds rather than leaving the units to collide.
- EXPRESS REVIEW IS A GENUINE TEN-MINUTE DECISION, AND THE CITY BUDGETS IT AS ONE: "Plans reviewed at the counter for minor building projects that require a maximum of 10 - 15 minutes to complete." Rooftop PV under 10KW, window and door replacement, seismic upgrades and patio covers all qualify. Bringing three sets at 11 x 17 inches can turn a month into a morning - but commercial tenant improvements are explicitly barred from the track.
- eTRAKiT IS ALIVE HERE AND RETIRED ELSEWHERE. Napa runs eTRAKiT for online inspection scheduling; Richmond, in this same corpus, announces that "eTRAKiT is no longer in service" and has moved to iMS. A contractor working across both cities has one live eTRAKiT login and one dead one, for the same product name.
- THE AUTOMATED INSPECTION LINE NEEDS A CODE NUMBER, NOT A DESCRIPTION. You call 707-257-1063 and select "the inspection code... which applies to your project" - 101 for setbacks, 102 for footings and steel, 110 for slab reinforcement, 301 for underground DWV, 280 for electric service release, and so on through a published table covering underground, underfloor, foundation, pool, masonry and electrical work. Look the number up before you dial.
- TWO OUTSIDE AGENCIES CAN ATTACH THEMSELVES TO A NAPA PROJECT and neither is the city: Napa Sanitation District for sewer-related review, and Napa Valley Unified School District for development fees. Both are described as "an outside agency review from the City of Napa" with their own contact details, so the city is telling you plainly that it cannot answer for either.
- A NEW FIRE HAZARD SEVERITY ZONE ORDINANCE EXISTS AND ITS CONTENTS ARE NOT ON THE PAGE. The city says it "has adopted a new ordinance regarding the Local Responsibility Area (LRA) Fire Hazard Severity Zone maps issued by the State of California" and links the state maps - but publishes neither the ordinance number nor what it requires. If your parcel falls inside an LRA zone, that ordinance is the document to ask for by name.
- THE EXEMPTION LIST IS THE STATE'S, QUOTED AND ATTRIBUTED: "Per the 2025 California Building Code, section 105.2". Napa reproduces it rather than writing a local paraphrase, which means the list moves when the state code moves - and the city adds the warning that exempt work "is required to be done in compliance with applicable codes and ordinances" regardless.