Sign Permit (Permanent and Temporary) — Federal Heights, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://library.municode.com/co/federal_heights/codes/code_of_ordinances?nodeId=PTIIMUCO_CH70ZO_ARTXISICO
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit (Permanent and Temporary) in Federal Heights, Colorado
Required to construct, erect, or maintain any permanent sign in Federal Heights, per Municipal Code Chapter 70 (Zoning), Article XI (Sign Code), Sec. 70-603(c)(1). The permit is issued by the City as a building permit through the Building Department, with dimensional standards set by zone district in Sec. 70-604; the City Planner (303-412-3530) fields sign-code-specific questions. Illuminated/electrical signs additionally require a separate State of Colorado electrical permit, consistent with Federal Heights' general electrical-permitting posture (fully state-administered by DORA). Certain temporary sign types (e.g. cold air balloons) require a separate Temporary Use Permit under Sec. 70-606.
Verified 2026-08-13 · Source
When you need this permit
- It is unlawful to construct, erect, or maintain a permanent sign without first obtaining a building permit from the City (Sec. 70-603(c)(1))
- The sign permit application must include, unless waived by the city manager: a scaled elevation of the proposed sign showing its message; sign area, color scheme, and construction materials; a plot plan showing the sign's location (plus building outline for wall-mounted signs); and, for replacements, a photo of the existing sign with its dimensions alongside the new sign's area (Sec. 70-603(c)(2))
- Illuminated or electrical signs require a separate electrical permit from the State of Colorado (DORA) before the City will approve the building permit; proof of the state permit and compliance documentation must be submitted to the City's building department first (Sec. 70-603(b)) — consistent with Federal Heights' fully state-administered electrical posture documented elsewhere in this file
- Dimensional standards (maximum number, area, and height) vary by sign type (wall, ground/pole/monument, multi-tenant, drive-through) and by zone district under Sec. 70-604 — e.g., in the C-1/I-1/P-1 districts wall-sign area scales from 30 to 100 sq ft by building-face frontage, pole signs up to 100 sq ft/20 ft height, and monument signs up to 130 sq ft/10 ft height, both scaled by building footprint; residential districts are limited to small home-occupation signage (4 sq ft, 5 ft height)
- Electronic message displays are allowed only in the C-1, I-1, commercial PUD, and P-1 zone districts, limited to static/dissolve/fade transitions with a minimum 3-second display time per message (Sec. 70-605)
- Temporary signs (cold air balloons, construction-project identification, fence signs, flag poles/banners, grand-opening/store-closing banners, portable/sandwich-board signs, extra-large C-1 lawn signs, etc.) are governed by Sec. 70-606, each with its own duration, size, quantity, and setback limits by zone district; cold-air balloons and extra-large C-1 lawn signs specifically require a separate Temporary Use Permit
- No building permit fee is charged for a change of copy on a sign with an identical-size panel, or for repainting, cleaning, or routine maintenance/repair of a previously-permitted sign whose structure is not altered (Sec. 70-603(c)(4)-(5))
- A permanent sign may not be moved to another location or structurally/textually altered without a new city-issued permit (Sec. 70-603(m))
- Signs may not be placed in the City's right-of-way and will be removed if found in violation of the sign code
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection (sign)
Completed sign verified against the approved application; the Sign Code itself (Chapter 70, Article XI) does not specify a distinct inspection procedure or timeline beyond the general building-permit final inspection process used elsewhere in this file
See the full Federal Heights inspection guide — scheduling & re-inspection fees →
Tips
- An illuminated or electrical sign needs a separate Colorado State Electrical Board (DORA) permit, and proof of that state permit must be submitted to the City before the sign's building permit will be approved (Sec. 70-603(b)) — the same state-administered electrical posture documented throughout this file for other permit types.
- No fee applies to a straightforward change-of-copy on an identically-sized sign panel, or to routine repainting/cleaning/maintenance of an already-permitted sign — but any change to a sign's text, height, size, shape, material, or lighting counts as an 'alteration' requiring a new permit (Sec. 70-603(m)).
- Dimensional limits differ sharply by zone district: a C-1/I-1/P-1 commercial monument sign can run up to 130 sq ft and 10 ft tall (scaled to building footprint), while a residential home-occupation sign is capped at 4 sq ft and 5 ft tall — pull the Sec. 70-604 table for your specific zone district and sign type before designing.
- Certain temporary signage (cold air balloons: 10 days per permit, max 4 permits/year; extra-large C-1 lawn signs: max 90 days) requires its own $100.00 Temporary Use Permit in addition to, or instead of, the standard sign permit — confirm which category your promotional signage falls into under Sec. 70-606 before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Federal Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Federal Heights
Sign Permit (Permanent and Temporary) in other cities
Compare sign permit (permanent and temporary) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Federal Heights project checklist
Describe your project once and get every permit, document, and fee it triggers in Federal Heights — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →