Residential Addition / Alteration / Tenant Finish Permit — Federal Heights, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.fedheights.org/index.asp?SEC=%7BCB7135BC-846F-468B-B85D-0ECE8B03FFCD%7D&Type=B_BASIC&persistdesign=none
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Alteration / Tenant Finish Permit in Federal Heights, Colorado
Covers additions, alterations, and interior remodels ('Repair or Replace' and 'Alteration or Tenant Finish' categories) to existing residential structures in Federal Heights. Reviewed under the 2021 IRC as adopted by Ordinance 23-02. The City publishes dedicated Building Guides for common sub-scopes: Residential Addition, Detached Garages, Basement Finish, and Pole Barns.
Verified 2026-07-06 · Source
When you need this permit
- Classification of Work marked 'Residential' with category '2. Addition', '3. Repair or Replace', or '4. Alteration or Tenant Finish' as applicable
- Additions follow the City's Residential Addition Building Guide; detached garages, basement finishes, and pole barns each have their own dedicated Building Guide
- All contractors must complete City Contractor Registration; subcontractors recorded via Subcontractor License Form Contractor
- Plans requiring a design professional's stamp must meet the City's Architect/Professional Engineer Seal Specifications
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (additions with new footings only)
Before concrete pour
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment (electrical inspected by State DORA, not the City)
- 4
Final Inspection
All work complete per approved plans
See the full Federal Heights inspection guide — scheduling & re-inspection fees →
Tips
- Federal Heights publishes separate, scope-specific Building Guides (Residential Addition, Detached Garage, Basement Finish, Pole Barn) rather than one combined submittal matrix — pull the guide matching your exact project type before assembling your plan set.
- An 'Alteration or Tenant Finish' checkbox exists on the same application used for residential and commercial projects — confirm which classification (Residential vs. Commercial) applies since fee treatment and plan review may differ.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Federal Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Federal Heights
Residential Addition / Alteration / Tenant Finish Permit in other cities
Compare residential addition / alteration / tenant finish permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Federal Heights project checklist
Describe your project once and get every permit, document, and fee it triggers in Federal Heights — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →