Westminster building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Westminster, Colorado.
Verified 2026-06-30 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 4800 W. 92nd Avenue, Westminster, CO 80031
- Phone
- 303-658-2075
- Office hours
- Mon–Fri, 8 a.m.–5 p.m. (front office); residential permit review walk-through times: Tuesdays 1–4:30 p.m. and Thursdays 9 a.m.–noon; all permits must be applied for online via eTRAKiT
- Website
- Official site
Published scheduling rules
- Expired reroof permits will not be inspected — schedule inspections before the permit lapses. (Roofing Permit (Reroof))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour — footings must extend below the 36-inch frost line
- 2
Framing
After framing complete, before insulation or wall cover — includes shear wall/braced wall panel connections per Design Criteria wind zone
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed
- 4
Insulation / Energy
Insulation and 2021 IECC compliance verification before drywall
- 5
Final
All work complete, ready for Certificate of Occupancy
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Footings and foundation before concrete pour — 36-inch frost depth minimum
- 2
Framing
Structural framing, egress windows, fire separation (if attached)
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Final
All work complete; ADU requires its own separate Certificate of Occupancy
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour — 36-inch frost depth minimum
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, mechanical rough-in before walls closed
- 4
Final
All work complete per approved plans
Applies to: Commercial Tenant Improvement Permit
- 1
Framing / Structural
After framing complete before walls covered
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in before walls closed
- 3
Final / Certificate of Occupancy
All work complete, life safety systems functional
Applies to: Deck / Covered Patio Permit
- 1
Footing (if applicable)
Before concrete pour for structural post footings — 36-inch frost depth minimum
- 2
Framing
Structural framing before decking/cover installed
- 3
Final
Structure complete per approved plans
Applies to: Mechanical / HVAC Permit
- 1
Gas Piping
Pressure/leak test required before concealing new gas piping
- 2
Rough-In / Equipment
Equipment installation and ductwork before walls closed
- 3
Final
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Underground / Under-slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed before walls closed
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Demolition Permit
- 1
Pre-Demolition Utility Verification
Verification that gas, electric, water, and sewer are disconnected before demolition begins
- 2
Final
Site cleared, debris removed, utilities properly capped
Applies to: Electric Vehicle Charger Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover (Level 2/3 installations)
- 2
Final
Charging equipment installed and energized, receptacle/circuit verified per NEC
Applies to: Electrical Permit
- 1
Rough-In
Wiring and conduit installed before walls closed
- 2
Final
All devices installed, panel labeled, system energized
Applies to: Roofing Permit (Reroof)
- 1
Roof Decking (if applicable)
Required prior to installation of roof coverings when new decking is required or provided, prior to mid-roof inspection
- 2
Final
Completed roof — flashing, drip edge, underlayment, high-wind nailing verified
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final — Structural / Electrical
Panel mounting, racking attachment, roof penetration sealing, and all electrical connections verified
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westminster building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Westminster building permits
Get alerts for Westminster
We'll email you when Westminster's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.