Required for roof replacement in Westminster whenever cumulative roof covering damage exceeds one square (100 sq ft), per the Residential Re-roofing Guide based on the 2021 IRC with Westminster amendments. Minor repairs of 100 sq ft or less do not require a permit.

Verified 2026-07-05 · Source

When you need this permit

  • Full roof replacement required when cumulative damage exceeds one square (100 sq ft) — replacement must be of the entire roof covering
  • Apply for a Residential Counter Type permit via eTRAKiT; provide total valuation including labor and material
  • HOA written permission (if required) must be uploaded to the permit prior to final inspection
  • Engineer's letter required when replacing existing metal or asphalt roofing with new concrete/clay tile roofing, or when replacing tile with heavier tile — verifying the structure meets current code and Design Criteria
  • If solar is existing, an additional permit is required for removal and reinstallation of the solar system
  • Westminster is in a Special Wind Region — high wind nailing per manufacturer instructions is required for all asphalt shingle installations
  • Asphalt shingles must comply with 2021 IRC Section R905.2.4, tested to ASTM D 7158, with wind classification appropriate to the ultimate design wind speed for the parcel's City Map Wind Zone
  • Minor roofing repair of 100 sq ft (one square) or less does NOT require a permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Re-Roofing (Miscellaneous SFD Residential Permit)City of Westminster Building Division Fee Schedule V3 2026, effective January 1, 2026 — "Miscellaneous SFD Residential Permit Fees" table lists Re-Roofing at $100.00 (no footnote asterisk applies to this line item). Re-verified 2026-07-05 by re-fetching the live PDF and rendering it to an image for visual reading, since pdftotext's column extraction misaligns this two-column table and silently mis-reports this row as "$80.00*" (that text actually belongs to a neighboring row). A prior commit (f85799f) had changed this to $80.00 believing it was a transcription error; that correction was itself wrong — the published figure is $100.00.
$100.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Westminster building department
~1–5 business days

How long did your Roofing Permit (Reroof) permit actually take in Westminster?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roof Decking (if applicable)

    Required prior to installation of roof coverings when new decking is required or provided, prior to mid-roof inspection

  2. 2

    Final

    Completed roof — flashing, drip edge, underlayment, high-wind nailing verified

See the full Westminster inspection guide — scheduling & re-inspection fees →

Tips

  • Re-roofing is a flat $100.00 Miscellaneous SFD Residential Permit in Westminster.
  • Westminster's Special Wind Region designation means all asphalt shingle work requires high-wind nailing per manufacturer instructions — confirm your parcel's City Map Wind Zone (1/2/3) before ordering materials.
  • Switching to a heavier roofing material (e.g., concrete or clay tile) requires an engineer's letter confirming the existing structure can support the added weight.
  • Expired reroof permits will not be inspected — schedule inspections before the permit lapses.
  • If solar panels are already installed, budget for a separate permit to remove and reinstall them around the reroof.

Frequently asked questions

Yes, for any roof covering damage/replacement exceeding one square (100 sq ft) — the flat fee is $100.00. Minor repairs of 100 sq ft or less do not require a permit.

In Westminster, the published Re-Roofing (Miscellaneous SFD Residential Permit) is: $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a roofing permit (reroof) in Westminster typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with City of Westminster — Department of Community Development, Building Division at 303-658-2075.

You'll need: Roofing Permit Application (eTRAKiT, Residential Counter Type); Residential Re-roofing Guide. Depending on your project, Westminster may also ask for: Engineer's Letter. See the required-documents checklist on this page for details on each.

Westminster requires 2 inspection(s) for a roofing permit (reroof), in order: Roof Decking (if applicable), Final. Schedule each through City of Westminster — Department of Community Development, Building Division (303-658-2075).

Apply through City of Westminster — Department of Community Development, Building Division at 4800 W. 92nd Avenue, Westminster, CO 80031. Phone: 303-658-2075, email: permits@westminsterco.gov. Office hours: Mon–Fri, 8 a.m.–5 p.m. (front office); residential permit review walk-through times: Tuesdays 1–4:30 p.m. and Thursdays 9 a.m.–noon; all permits must be applied for online via eTRAKiT. Official information: https://www.westminsterco.gov/621/Building-Division.

Westminster, Colorado has adopted: 2021 International Building Code (IBC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Residential Code (IRC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Fire Code (IFC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Plumbing Code (IPC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Mechanical Code (IMC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Fuel Gas Code (IFGC) — with City of Westminster amendments; effective June 1, 2024; 2021 International Energy Conservation Code (IECC) — adopted per Westminster Municipal Code Section 11-9-11, meeting the Colorado HB22-1362 statewide minimum energy-code floor; Colorado Model Electric Ready and Solar Ready Code — adopted per Westminster Municipal Code Section 11-9-12, with Westminster amendments (waiver/variance provisions for commercial buildings over 10,000 sq ft and substantial cost differential appeals); 2023 National Electrical Code (NEC) / NFPA 70 — current edition (per Westminster's Commercial Plan Review Submittal Guidelines); the City has announced the 2026 NEC will become effective August 1, 2026, superseding the 2023 edition; ICC/ANSI A117.1-2017 — Standard for Accessible Design. Local amendments apply — see the Westminster overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westminster building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.