Electric Vehicle Charger Permit — Westminster, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.westminsterco.gov/DocumentCenter/View/6206/2021-Electric-Vehicle-Chargers-Submittal-Requirements
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charger Permit in Westminster, Colorado
Required for installation of Level 1, Level 2, or Level 3 (DC fast) electric vehicle charging equipment in Westminster. Applied for as a dedicated 'ELECTRIC VEHICLE CHARGER' permit type in eTRAKiT with submittal requirements that scale by charger level; billed through the City's standard valuation-based building permit fee schedule plus the electric trade fee add-on rather than a separate flat EV-specific fee (Westminster's fee schedule has no distinct EV-charger line item, unlike its flat $300 Solar Systems fee).
Verified 2026-07-20 · Source
When you need this permit
- Complete the permit application via eTRAKiT selecting permit type 'ELECTRIC VEHICLE CHARGER'
- Level 1 chargers: site plan or floor plan showing the location of the new electrical receptacle outlet(s)
- Level 2 chargers (residential): site plan or floor plan showing charging equipment location, plus load calculations for the entire residence and a one-line diagram
- Level 2 chargers (commercial): site plan showing charging equipment location, plus load calculations for the entire service and a one-line diagram
- Level 3 (DC fast) chargers: applicant must contact the Planning Department to initiate an Official Development Plan (ODP) amendment, in addition to a site plan and load calculations/one-line diagram for the entire service of connection
- Level 3 chargers taller than 6 feet require structural engineering for the foundation, with plans and calculations prepared and stamped by a Colorado licensed professional engineer
- A licensed electrical contractor holding a City of Westminster Class C Electrical Contractor license must be signed onto the permit Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover (Level 2/3 installations)
- 2
Final
Charging equipment installed and energized, receptacle/circuit verified per NEC
See the full Westminster inspection guide — scheduling & re-inspection fees →
Tips
- Westminster has a dedicated 'ELECTRIC VEHICLE CHARGER' permit type in eTRAKiT — do not apply under the general electrical permit type.
- Unlike solar (flat $300 Miscellaneous Permit fee), EV chargers have no dedicated flat fee — they are billed under the standard valuation-based building permit fee schedule plus the 15% electric trade fee add-on.
- Level 3 (DC fast) chargers require an Official Development Plan (ODP) amendment through the Planning Department before or alongside the building permit — budget extra time for this step.
- Level 3 chargers taller than 6 feet need a Colorado PE-stamped structural foundation design.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westminster building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Westminster
Electric Vehicle Charger Permit in other cities
Compare electric vehicle charger permit fees across Colorado →
Look up this fee in a different city →