Accessory Dwelling Unit (ADU) Permit in Westminster, Colorado

Required for construction of a new attached or detached ADU on a single-family detached lot in Westminster. City Council newly authorized ADUs citywide on November 18, 2024, effective January 1, 2025 — the same codes that apply to residential construction (2021 IRC, Fire, utility connections) apply to ADUs.

Verified 2026-06-30 · Source

When you need this permit

  • 1 ADU allowed per primary dwelling unit on the same lot
  • Permitted in any zone that allows single-family detached dwelling units as a use
  • ADU may be located within the principal dwelling (e.g., basement/attic with private entrance), attached as an addition, or as a separate detached building on the same lot
  • Must be on a permanent foundation; all codes applicable to residential construction apply, including the IRC and Fire Code (including fire sprinklers where required)
  • Full kitchen facilities and a full bathroom are required
  • Principal dwelling must have a Certificate of Occupancy; the ADU requires its own separate Certificate of Occupancy
  • ADU must have its own address (assigned during the review process); apply for the permit under the principal dwelling's address
  • Minimum size: 190 sq ft. Maximum size: 1,200 sq ft or 50% of the principal dwelling's gross floor area, whichever is less (up to 750 sq ft allowed where the principal dwelling is under 1,500 sq ft; ADU may never be larger than the principal dwelling)
  • Setbacks: front and side match the principal dwelling's required setbacks; rear setback is the greater of the accessory-structure setback or 5 feet; ADUs may not be built over an easement
  • Engineered plans prepared by a licensed professional, drawn to scale and specific to the property, are required
  • No City-imposed restriction on ADU rental rates

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation-based (same tiers as new construction)ADU Info Sheet (Rev. 5): 'Building Permit fees, as determined by Building'
Varies by valuation — see Residential Building Permit fee tiers
Plan Review FeeADU Info Sheet: 'Building Review fees, as determined by Building'
65% of the Building Permit Fee
Use TaxADU Info Sheet: 'Use Tax fees, as determined by Building'
4.25% of 50% of Total Valuation
Utility Tap FeesADU Info Sheet: 'Utility tap fees apply, as determined by PWU' — the Info Sheet explicitly states this is not an exhaustive fee list and other development/impact fees may apply; confirm exact tap fee at application via the Water Tap and Sewer Fees page
Varies — determined by Westminster Public Works and Utilities (PWU)

Review timeline

Plan reviewTypical estimate — confirm current times with the Westminster building department
~1–1 business days

How long did your Accessory Dwelling Unit (ADU) Permit permit actually take in Westminster?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Footings and foundation before concrete pour — 36-inch frost depth minimum

  2. 2

    Framing

    Structural framing, egress windows, fire separation (if attached)

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  4. 4

    Final

    All work complete; ADU requires its own separate Certificate of Occupancy

See the full Westminster inspection guide — scheduling & re-inspection fees →

Tips

  • Westminster's ADU ordinance is very new: approved by City Council November 18, 2024, effective January 1, 2025 — confirm current zoning eligibility since this is a recently-changed program.
  • An ADU needs its own separate Certificate of Occupancy in addition to the principal dwelling's CO.
  • There is no City-imposed cap on ADU rental amounts.
  • Exact utility tap fees are determined by Westminster Public Works and Utilities (PWU), not the Building Division — confirm the specific dollar figure before budgeting, since the ADU Info Sheet does not publish a flat tap-fee number.

Frequently asked questions

Westminster requires an accessory dwelling unit (adu) permit for: 1 ADU allowed per primary dwelling unit on the same lot; Permitted in any zone that allows single-family detached dwelling units as a use; ADU may be located within the principal dwelling (e.g., basement/attic with private entrance), attached as an addition, or as a separate detached building on the same lot; Must be on a permanent foundation; all codes applicable to residential construction apply, including the IRC and Fire Code (including fire sprinklers where required); Full kitchen facilities and a full bathroom are required; Principal dwelling must have a Certificate of Occupancy; the ADU requires its own separate Certificate of Occupancy; ADU must have its own address (assigned during the review process); apply for the permit under the principal dwelling's address; Minimum size: 190 sq ft. Maximum size: 1,200 sq ft or 50% of the principal dwelling's gross floor area, whichever is less (up to 750 sq ft allowed where the principal dwelling is under 1,500 sq ft; ADU may never be larger than the principal dwelling); Setbacks: front and side match the principal dwelling's required setbacks; rear setback is the greater of the accessory-structure setback or 5 feet; ADUs may not be built over an easement; Engineered plans prepared by a licensed professional, drawn to scale and specific to the property, are required; No City-imposed restriction on ADU rental rates. If your project isn't listed, confirm with City of Westminster — Department of Community Development, Building Division at 303-658-2075 before starting work.

In Westminster, the published Building Permit Fee — valuation-based (same tiers as new construction) is: Varies by valuation — see Residential Building Permit fee tiers. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Use Tax — 4.25% of 50% of Total Valuation; Utility Tap Fees — Varies — determined by Westminster Public Works and Utilities (PWU). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an accessory dwelling unit (adu) permit in Westminster typically runs 1–1 business days. This is an estimate, not a published figure — confirm current review times with City of Westminster — Department of Community Development, Building Division at 303-658-2075.

You'll need: Building Permit Application (eTRAKiT); Accessory Dwelling Unit Info Sheet (Rev. 5, March 10, 2026); Engineered Construction Plans. See the required-documents checklist on this page for details on each.

Westminster requires 4 inspection(s) for an accessory dwelling unit (adu) permit, in order: Foundation, Framing, MEP Rough-In, Final. Schedule each through City of Westminster — Department of Community Development, Building Division (303-658-2075).

Apply through City of Westminster — Department of Community Development, Building Division at 4800 W. 92nd Avenue, Westminster, CO 80031. Phone: 303-658-2075, email: permits@westminsterco.gov. Office hours: Mon–Fri, 8 a.m.–5 p.m. (front office); residential permit review walk-through times: Tuesdays 1–4:30 p.m. and Thursdays 9 a.m.–noon; all permits must be applied for online via eTRAKiT. Official information: https://www.westminsterco.gov/621/Building-Division.

One ADU is allowed per primary single-family detached dwelling unit on the same lot, per the City Council-approved ADU regulations effective January 1, 2025.

1,200 sq ft or 50% of the principal dwelling's gross floor area, whichever is less. If the principal dwelling is under 1,500 sq ft, the ADU may be up to 750 sq ft, but never larger than the principal dwelling itself. Minimum size is 190 sq ft.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westminster building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.